Project Dragon Small Business Website Content Management System.

Slides:



Advertisements
Similar presentations
Airline Reservation System
Advertisements

Strategies For Creating Accessible University Webpages Scot Close and Neil Torrefiel Web Services Unit San Jose State University.
DISC Database and Innovative Software in the Community (DISC) 1 October 9th, 2011 ARMS 1098B Design Review.
Collections Create and organize your own privet and public collections.
Design of Web-based Systems IS Development: lecture 10.
Client Solution Collaborative application for employees Transparent communication w/ anonymous questions Technology SharePoint 2010, using ratings and.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Web Servers How do our requests for resources on the Internet get handled? Can they be located anywhere? Global?
The Jukebox Orian Paz & Yair Cleper Instructor: Viktor Kulikov Semester: Spring 2009 Final Presentation.
Progress Report 11/1/01 Matt Bridges. Overview Data collection and analysis tool for web site traffic Lets website administrators know who is on their.
Bar Review Website Project Requirements Software Design Group Plan As Presented by: Team Yale.
0-1 Team 1 Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auto-Owners.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Faculty Information System Team Members Aaron Flocke Geetha Krishnasamy Leena Paulose James Curry.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến
Microsoft SharePoint 2010 Upgrade Preview FSU SharePoint Users Group Presents: Thursday, December 1 st, 2011.
Website Development for the Leave/Travel System and for Interfacing a Database PresentationBy Linda M’mayi Fort Valley State University.
Web-based Document Management System By Group 3 Xinyi Dong Matthew Downs Joshua Ferguson Sriram Gopinath Sayan Kole.
Online Job Portal with Exam
Web Project Methodology Move It Up Marketing Web Project Methodology in six steps to ensure quality and efficient projects.
Business Processes and Workflow How to go from idea to implementation
A Scalable Application Architecture for composing News Portals on the Internet Serpil TOK, Zeki BAYRAM. Eastern MediterraneanUniversity Famagusta Famagusta.
T U T O R I A L  2009 Pearson Education, Inc. All rights reserved Bookstore Web Application Introducing Visual Web Developer 2008 Express and the.
Crystal Hoyer Program Manager IIS Team Preview of features that will be announced at MIX09 Please do not blog, take pictures or video of session.
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 12: Introduction to ASP.NET Programming the World Wide Web 2009 Fifth Edition by.
Bayu Priyambadha, S.Kom Teknik Informatika Universitas Brawijaya.
Searchlets Customer: Paul English Advisor: Prof. Ethan Bolker Team : Satish, Di, Quan
MOSS Final Presentation -Senior Project-. MOSS Presentation Agenda Project Definition Requirements Analysis System Design Project Plan Code Cop Screen.
Inter Semester Presentation By Andrew Mepham Development of a Lightweight Stock Movement System.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Overview Scale out architecture Servers, services, and topology in Central Administration.
Functional Automation Testing Case Study 360logica Software Testing Services.
Project Plan for nSite Central Michael Dunn Ryan Sessions Kyle Kerrigan.
The Accidental Team Foundation Server Admin Anthony Borton ALM Trainer and Mentor QuickLearn Inc. DEV345.
Final Demo MedConnection Giant Squid Michael Cohen Robert Esho Chris Hogan Kate Kuleva Nisha Makwana Alex Rodrigues Rafal Urbanczyk.
3TC Company e-Restaurant Project management plan lick to add Title 2 Contents Introduction add Title 1 Requirement Specifications 3 Design Description.
Grid Chemistry System Architecture Overview Akylbek Zhumabayev.
WEP Presentation for non-IT Steps and roles in software development 2. Skills developed in 1 st year 3. What can do a student in 1 st internship.
Web Development in Microsoft Visual Studio Slide 2 Lecture Overview How to create a first ASP.NET application.
What is Web Site Administration Tool ? WAT Allow you to Configure Web Site With Simple Interface –Manage Users –Manage Roles –Manage Access Rules.
Unified Distributed (UDub Mail) Life Cycle Objectives Sachin Pradhan Gabriel Maganis.
MOSS Design Presentation -Senior Project-. MOSS MOSS Server System 1. MOSS Application 2. Server 3. Client SIU-E Code Cop System 1. SIU-E.
ASP (Active Server Pages) by Bülent & Resul. Presentation Outline Introduction What is an ASP file? How does ASP work? What can ASP do? Differences Between.
Final Class Diagram for C++ Implementation Clickermatic Software Clicker.
Microsoft ASP.NET Beginning Object-Oriented Web Design Bryan Jenks © Integrated Ideas 2005.
COMP3121 E-Commerce Technologies Richard Henson University of Worcester December 2011.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
Creating Custom Reports
CPAG Meeting March 4, I. Welcome II. Information Sharing Overview: New Procedures for Website Support and Service Requests Overview of Impact, Help.
COMP2322 Lab 1 Introduction to Wireshark Weichao Li Jan. 22, 2016.
ISYS 512 Business Application Design and Development with.Net David Chao.
As Partial fulfilment of Master of Computer Application [M.C.A. sem-6] Submitted by: – Suman M chauhan Project Guide: Mrs Vaishali Kaneriya.
Centralized Grading System. LCO Objectives Operational Concepts System Requirements System and Software Architecture Lifecycle Plan Feasibility Rationale.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
ASP.NET WEB Applications. ASP.NET  Web application framework developed by Microsoft  Build dynamic data driven web applications and web services  Subset.
Intro to Apps Anatomy of an App App Architecture.
Multi-tenant HR Benefits Management Solution.  Headquartered in US, our customer is a global service provider of HR and Benefits Management services.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
Project Dragon Small Business Website Content Management System.
Speed Cash System. Purpose of the Project  online Banking Transaction Information.  keeping in view of the distributed client server computing technology,
Capstone Project W-CMS `.
Web Design II PHP & MySQL or ASP.NET
Introduction to Internet Programming
Beginning Object-Oriented Web Design
Serpil TOK, Zeki BAYRAM. Eastern MediterraneanUniversity Famagusta
Architecture and design
SharePoint services Provides team collaboration through SharePoint Sites and makes it easy for communities to work together on documents, tasks, contacts,
Microsoft Office SharePoint Server 2007 Enterprise Search
Presentation transcript:

Project Dragon Small Business Website Content Management System

Team: Web Builders  Mao Hua Li  Xi Zhang  Vlad Steiman

Project Overview:  Provide a website to display relative products online.  Manage website contents by Client himself  Public can access and view

Project Overview:  For Small Business  Display Products & Service  Easy to use  Not need IT background

Business Process:

1. System administrator will create operator and grant the privilege to operators. 2. Operators can upload or edit the contents of the web site by web browser form. 3. Public users can view all contents in the web site.

Stakeholders  Project owner: client  Project Manager: Xi Zhang  System Analyst: Mao Hua Li, Vlad Steiman  System user: client and public users  System developer: Xi Zhang, Mao Hua Li, Vlad Steiman

Application Project Architecture  System Diagram

Technologies Used:  Web server side Windows Server 2008 R2 IIS7.5 SQL Server 2008 R2 ASP.NET 4.0 Visual Studio 2010  Client side IE 8  Communication HTTP, HTTPS

System design: requirements  Business Use Case  Business Rules  Use Cases Specifications

System design: Web based User UI

System Design: Database

System Implement: All team member involve  Weekly status meeting & reports  Unit testing  Bi-weekly status meeting with clients  Final test  Build documents

Project Final Stage:  Final reports  Final document  Submit all code and documents to client  Training

Thank you!