IUID in the Supply Chain Discrepancy and Deficiency Workshop Ellen Hilert, DoD SDR System Administrator April 27, 2011.

Slides:



Advertisements
Similar presentations
1 PDC Under Development PDC 331 PDC 331, Procedures for Prepositioned Materiel Receipt (PMR) and Shipment Status for Retrograde and Directed Discrepant/Deficient.
Advertisements

SDR Transformation Initiative DoD WebSDR
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
DoD Review of Inventory Policy and Procedures June 25, 2008 Ms. Kathleen Smith ODUSD(L&MR/SCI)
Overview of IUID Enabled SIM Supply PRC SDR Subcommittee Meeting 28 April, 2011 Kathy Smith ODASD(SCI)
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Using IUID to Serially Manage Inventory Ms. Kathy.
Asset Tracking/ITV Strategy Distribution Steering Group 23 October 2012.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) IUID-Enabled Serialized Item Management Levels of.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
1 Intensive Item Management Value Chain Kathy Smith UID Task Force Meeting August 26, 2009.
BTA Supply Chain Update for L&MR
Summary of Revisions DoD Manual DoD Supply Chain Materiel Management Procedures 0.
1 Approved DLMS Change ADC 217 PDC 217, identifies new passive RFID (pRFID) discrepancy codes in the packaging/marking (P300) series – Used to identify.
BRAC 2005 Change Overview The BRAC 2005 directives made by the Defense Base Realignment and Closure (BRAC) Committee dictate that Retail supply, storage.
Supply Discrepancy Reporting DoD Web Submission Ellen Hilert J673 Defense Logistics Management Standards Office.
Published Procedures for Wrong Item Discrepancies (2001) Incorrect Item. Report incorrect or misidentified material or unacceptable substitutes regardless.
WebSDR Encryption. 2 Background – WebSDR SDRs designated For Official Use Only (FOUO) since 2006 – DoD R (Appendix 3) says the data which.
Item Unique Identification (IUID) Update for JPIWG
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
Chapter 2 Special Program Requirements (SPR) Process And Demand Data Exchange (DDE) Forecasts. Chart 1 Forecasting Activity 830R Special Program Requirements.
IUID – Future Policy As agreed by the Joint Logistics Board in April 2010, IUID marking requirements (for both legacy assets and new procurements) to be.
Presented by 9/8/2011 DPAS Loans Via WAWF Scott Milewski.
Chapter 2 - Special Program Requirements (SPR) Process And Demand Data Exchange (DDE) Forecasts. 1.
1 DLMSO/DAASC November 2006 Supply PRC Meeting DLMS Bridge Middleware October, 2007 DLMSO Defense Logistics Management Standards Office.
DLA/WAWF PROCESSISSUEWAWFGAP Suspended Receipts/Supply Discrepancies DSS sends AR/861 to WAWF for both accepted and suspended quantity (multiple transactions)
Automatic Identification Technologies (AIT)/Item Unique Identification (IUID) and Real Time Locator System (RTLS)
WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP 1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS.
Information Briefing DoD WebSDR August 18, 2003 Defense Logistics Management Standards Office.
SDR Transformation Initiative DoD WebSDR SDR Committee Meeting, March 25-26, 2008 Information Exchange under the DLMS.
UNCLASSIFIED GFP Management Update Mr. Samuel Perez Headquarters, U.S. Marine Corps, LPC-2 2 February 2011.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Using IUID for SIM in the DoD Supply Chain Kathy.
WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP 1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS.
SDR Transformation Initiative DoD WebSDR DLMS Change Proposals Information Exchange under the DLMS SDR Committee Meeting, Dec 6, 2006.
Defense Logistics Agency Warfighter Stewardship Business Process Workforce Support Improvements Refinements Development Warfighter Stewardship Business.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
IUID Registry GFP Module Development Releases v5.0 and v5.1 Proposed Functionality User Test Scenarios JOINT SMALL ARMS/LIGHT WEAPONS COORDINATING GROUP.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FIRST.
1 WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY.
Item Unique Identification (IUID) Presented to SCESC 26 March 2013.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
SDR Transformation Initiative DoD WebSDR Overview Information Exchange under the DLMS SDR Committee Meeting, Dec 6, 2006.
Supply Process Review Committee Meeting 09-1 October 29, 2009 Brenda Meadows Robert Vitko Mary Jane Johnson Defense Logics Management Standards Office.
WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP 1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT DEFENSE LOGISTICS.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
1 ITEM UNIQUE IDENTIFICATION (IUID) OSD WORKSHOPS/JLB TASK FORCE STATUS UPDATE November 17, 2009.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS.
Supply Discrepancy Reports (SDRs) Small Arms/Light Weapons Ellen Hilert, DoD SDR System Administrator July 12, 2011.
OUSD(AT&L) Acquisition Resources & Analysis (ARA) Property and Equipment Policy Leveraging Item Unique Identification for Property Accountability Ms. Amber.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FIRST.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
IUID in the Supply Chain June 3, Agenda  IUID Workshops  Tracking/Managing Controlled Items by Unique Item Identifier (UII) Requires Additional.
IUID in the Supply Chain Physical Inventory by UII March 24, 2009.
DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FIRST.
DoD – Supply Chain Integration UID process and data flow December 13, 2006.
DoD Supply Discrepancy Reports Transformation Initiative November 19, 2003 DoD SDR Committee (US) Defense Logistics Management Standards Office.
DoD Supply Discrepancy Reports Transformation Initiative Briefing for SDR IPT Meeting September 23, 2004 Defense Logistics Management Standards Office.
1 Supply Discrepancy Reporting DoD Web Submission Ellen Hilert J673 Defense Logistics Management Standards Office February 28, 2001.
Information Exchange under the DLMS SDR Transformation Initiative, DoD WebSDR, & Item Unique Identification (IUID) SDR Committee Meeting, Dec 6, 2006.
Item Unique Identification (IUID) - Update
IUID and Government Furnished Property Basics
IUID and Serial Number Tracking: Proposed Addendum to ADC 1198A (Capital Equipment) and Draft PDC 1244 (Unique Item Tracking (UIT) Programs Supply.
Materiel Receipt Acknowledgement (MRA) Issues
Attachment, Page 4 1 Receipt Restriction requested by Item Manager 2
DoD Supply Discrepancy Reports Transformation Initiative
Military Standard Requisitioning and Issue Procedures (MILSTRIP)
Presentation transcript:

IUID in the Supply Chain Discrepancy and Deficiency Workshop Ellen Hilert, DoD SDR System Administrator April 27, 2011

Agenda  Goals for today’s IUID Discrepancy/Deficiency Workshop  Reporting Discrepancies via Supply Discrepancy Report (SDR) vs. Reporting Deficiencies via Product Quality Deficiency Report (PQDR)  DoD WebSDR and DLMS Transaction Exchange  Current Procedures  Proposed Procedures -Report and Response Time Standards -SDR Distribution Rules -Overlapping Reporting Criteria for SDR vs. PQDR -Discrepancy Scenarios  Way Ahead 2

Goals for Discrepancy/Deficiency Workshop  Achieve consensus on new and expanded requirements for discrepancy and deficiency reporting upon integration of IUID within the supply chain -When is the Supply Discrepancy Report (SDR) process invoked? What are the business rules, codes, and interfaces? What are the time standards? Are there near and/or long term implementation strategies available? -When is the Product Quality Deficiency Report (PQDR) process invoked?  Agree to work together to advance this requirement in a standard, collaborative fashion  Move forward to draft the necessary Defense Logistics Management System (DLMS) Changes where applicable  Encourage Component ERP designers to begin thinking about future integration of new requirements 3

Reporting Supply Discrepancy via SDR Reporting Quality Deficiencies via PQDR  SDR appropriate reporting vehicle: upon receipt at wholesale storage location, upon receipt at retail/tactical storage location -Typical supply-related discrepancies include: Shortage/Overage/Non-receipt Wrong item Supply condition not consistent with documentation Mismatch between documentation and IUID received  PQDR appropriate reporting vehicle: upon issue to end user, upon issue to maintenance, failure while in use -Typical quality-related deficiencies related to IUID include: Incorrect placement of data matrix Unsatisfactory application Incorrect encoding of the data matrix 4

DoD WebSDR and DLMS SDR Transaction Exchange  SDR Transformation Initiative -Transitioned mixed-environment to interoperable DoD Standard -DLMS-compliant process, set in motion by OSD in 2004  WebSDR architecture based upon Defense Automatic Addressing System (DAAS) hub for communication and centralized data management -Eliminates the need for numerous point-to-point communications links -Transaction driven process eliminates the need to re-key SDRs within separate Component systems -Automatic reply to customer triggered by reply transaction eliminates action activity manual steps to print/mail/fax 5

SCIP SDR Information Exchange Defense Automatic Addressing System (DAAS) Master Repository Translation Processing DLA Enterprise Business System (EBS) 842 NAVSUP SDR System (NSDRS) Distribution Standard System (DSS) Incoming Supply Discrepancy Report (ISDR) Automated Discrepancy Reporting System (ADRS) * DoD WebSDR Customers NAVSEA Administered (NSY/FRC/USMC) (PDREP) USA Electronic Product Support (AEPS) (transitioning to new platform) 842 Air Force Security Assistance Command (SDR-A) 842 Army UDF (one way) 842 XML On-Line AF ES-S SDR * 842 XML GSA (VISS) Interface (Late 2011) * Integrated receiving & SDR functionality 842

SDR Processing and IUID Current Procedures  IUID-specific discrepancies related to the packaging label, including automated identification technology (AIT); the item marking, including AIT; supply documentation; the due-in record; and/or a mismatch between the item and any of the above -Elements which comprise unique identification are: UII and/or serial number  Receiving activities are required to report discrepancies involving IUID for items under current Unique Item Tracking (UIT) program requirements or for new procurement items as contractually required under IUID program policy  Concealed IUID discrepancies which result in incorrect information within the IUID registry must be reported via a SDR and corrective action taken -Concealed discrepancies applicable to IUID data are not subject to SDR time standards for reporting 7

Current Procedures – New Procurement  Additional requirements for new procurement receipt process -Discrepancies identified during receipt of new procurement material must be reported concurrent with acceptance process, and may preclude acceptance -Material placed in a suspended condition pending resolution (suspend based on specific discrepancies) 8

Current IUID Specific Discrepancies  Reporting criteria defined as: -Item unique identification on label missing, damaged or unreadable -Item unique identification on item missing, damaged or unreadable -Item unique identification on supply documentation missing, damaged or unreadable -Item unique identification not provided on shipping notice -Non-conformance to unique identification requirements under terms of contract -Multiple containers without separate unique identification data listings -Mismatch between item unique identification on item and label -Mismatch between item unique identification on item and shipping documentation -Mismatch between item unique identification on item and due-in or shipping notice -Mismatched or missing item unique identification discovered upon opening a sealed pack -Duplicate item unique identification Notes: Red text identifies conditions requiring new procurement items to be suspended pending resolution 9

Proposed IUID SDR Requirements  Expand business rules for communicating the UII/serial number to selected supply chain discrepancies involving IUID items: shortage, overage, wrong item, and misdirected shipments  Component modernization efforts should integrate receiving and discrepancy reporting functions to facilitate capture of IUID via AIT -Systemically perpetuate UII on SDR from discrepant receipt in the scenarios Require use of data fields vice remarks for UII/serial number identification -WebSDR currently supports up to 25 UIIs per SDR. -Which approach is most appropriate for SDRs: database vs. pass thru  Set new timeframes for SDR processing based upon level of intensity 10

Current Report and Response Time Standards  SDR procedures prescribe an expedited time standard for SDR submission and reply associated with Arms, Arms Parts, Ammunition, and Explosives -Report within 24 hrs. of discovery/Respond within 25 days -Applicable to: shortage/overage/non-receipt/misdirected/wrong item - CIIC used to recognize applicable materiel: classified or sensitive, plus pilferable codes associated with arms and ammunition  Expedited processing expanded to include NWRM per your OSD memo (draft DoD M, Volume 11) -Criteria clarified to include selected UII mismatches -24 hour reporting/24 hour acknowledgement w/15 day comprehensive response 11

Alternative Report and Response Time Standards  Time standard breakdown by FLIS code for UID items: High/Standard -Expedited time standard linked to intensively managed item -Considerations: Scope of items to be designated High not yet defined -Small arms/light weapons may not meet the definition -Current standard does apply to small arms/light weapons Increase in volume could overwhelm Component personnel  Apply time standard applicable to “High” for batch/lot controlled ammunition 12

SDR Distribution Rules  Varies by Component policy and level of implementation today  Policy will require UIIs designated as High to be maintained on the owner’s record  Standardize distribution rules under long term implementation -Report Action copy to shipping activity Distribution copy to owner/manager -Shipping activity response Action copy to owner/manager Distribution copy to submitter Distribution copy to other interested parties -Owner/manager response (if required) Action copy to submitter Distribution copy to other interested parties 13

Overlapping Reporting Criteria: SDR vs. PQDR  BLUF: Overlap in reporting criteria allows customer flexibility and insures there is no gap in reporting requirements -Most significant overlap in reporting criteria is applicable to missing or unreadable IUID tag/data matrix -Submitter’s location and role in supply chain may contribute to selection of most appropriate reporting method -Focus is on reporting and resolution Both provide feedback on contractor performance Both allow the party responsible for discrepancy/deficiency to be held accountable 14

Discrepancy Scenario: IUID Mismatch/Missing (scenarios highlighted in red)  Required Action -Identify discrepant quantity and discrepant UIIs received -New Procurement: Suspend mismatched items pending resolution -Stock Issue: Segregate mismatched items pending resolution  Submission Time Standard -High (NWRM and Serially managed AA&E): 24 hours from discovery (U.S. & FMS) -Standard: 60 days CONUS/120 days Overseas from date of shipment/FMS LOA terms  Response Time Standard -High (NWRM and Serially managed AA&E): 24 hours acknowledgment / 15 days research & reply -Standard: 55 days (30 days for Distribution Depot)  Interim Rules -Use expedited processing time standards -If single item and no interface/AIT, inclusion of UII/serial number encouraged  Long Term Implementation -Integrate receipt/SDR process, pass UII from receipt to SDR module -Automated IUID capture via AIT if subsequent to receipt -Revised SDR distribution rules 15

Discrepancy Scenario: Shortage/Non-receipt  Required Action -Identify discrepant quantity -For shortage, identify all UIIs received  Submission Time Standard -High (NWRM and Serially managed AA&E): 24 hours from discovery (U.S. & FMS) -Standard: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -High (NWRM and Serially managed AA&E): 24 hours acknowledgement / 15 days research & reply -Standard: 55 days (30 days for Distribution Depot and FMS Total Non-Receipt)  Interim Rules -Use expedited processing time standards -If single item and no interface/AIT, inclusion of UII/serial number encouraged  Long Term Implementation -Integrate receipt/SDR process, pass UII from receipt to SDR module -Automated IUID capture via AIT if subsequent to receipt -Revised SDR distribution rules 16

Discrepancy Scenario: Overage  Required Action -Identify discrepant quantity and all UIIs received -New Procurement: Suspend overage pending resolution -Stock Issue: Segregate overage pending resolution  Submission Time Standard -High (NWRM and Serially managed AA&E): 24 hours from discovery -Standard: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -High (NWRM and Serially managed AA&E): 24 hours initial / 15 days research & reply -Standard: 55 days (30 days for Distribution Depot)  Interim Rules -Use expedited processing time standards -If single item and no interface/AIT, inclusion of UII/serial number encouraged  Long Term Implementation -Integrate receipt/SDR process, pass UII from receipt to SDR module -Automated IUID capture via AIT if subsequent to receipt -Revised SDR distribution rules 17

Discrepancy Scenario: Wrong Item  Required Action -Identify discrepant quantity and wrong item UIIs received -New Procurement: Suspend wrong item pending resolution -Stock Issue: Segregate wrong item pending resolution  Submission Time Standard -High (NWRM and Serially managed AA&E): 24 hours from discovery (U.S. & FMS) -Standard: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -High (NWRM and Serially managed AA&E): 24 hours initial / 15 days research & reply -Standard: 55 days (30 days for Distribution Depot)  Interim Rules -If single item, inclusion of UII/serial number encouraged -If single item and no interface/AIT, inclusion of UII/serial number encouraged  Long Term Implementation -Integrate receipt/SDR process, pass UII from receipt to SDR module -Automated IUID capture via AIT if subsequent to receipt -Revised SDR distribution rules 18

IUID Discrepancy Scenario: Misdirected  Required Action -Identify misdirected quantity (if known) and misdirected UIIs (if known) -Segregate pending disposition instructions  Submission Time Standard -High (NWRM and Serially managed AA&E): 24 hours from discovery (U.S. & FMS) -Standard: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -High (NWRM and Serially managed AA&E): 24 hours acknowledgement / 15 days research & reply -Standard: 55 days (30 days for Distribution Depot)  Interim Rules -If single item, inclusion of UII/serial number encouraged -Use expedited processing time standards  Long Term Implementation -IUID capture via AIT -Revised SDR distribution rules 19

Discrepancy Scenario: Supply Condition not Consistent with Documentation  Action Required -Identify discrepant UIIs received -New Procurement: Suspend discrepant item pending resolution -Stock Issue: Segregate discrepant item pending disposition  Submission Time Standard -Standard and High: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -Standard and High: 55 days (30 days for Distribution Depot)  Interim Rules -If single item and no interface/AIT, inclusion of UII/serial number encouraged  Long Term Implementation -Integrate receipt/SDR process, pass UII from receipt to SDR module -Automated IUID capture via AIT if subsequent to receipt -Revised SDR distribution rules 20

Discrepancy Scenario: Documentation (impacting receipt processing)  Action Required -Identify discrepant quantity -If receipt cannot be processed: New Procurement: Suspend discrepant item pending resolution Stock Issue: Segregate discrepant item pending disposition  Submission Time Standard -Standard and High: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -Standard and High: 55 days (30 days for Distribution Depot) 21

Discrepancy Scenario: Packaging  Action Required -Identify discrepant quantity  Submission Time Standard -Standard and High: 60 days CONUS/120 days Overseas/FMS LOA terms  Response Time Standard -Standard and High: 55 days (30 days for Distribution Depot) 22

Discrepancy Scenario: Quality–Related Receipt Notification  “Piggy-backs” SDR transaction exchange to accommodate material owners with special programs requiring immediate visibility -SDR w/three-position Q Discrepancy Code provides notification of quality deficient (or potentially deficient) material received at a Distribution Depot  Action Required -Identify quantity and UIIs received  Submission Time Standard -Created at time of receipt  Response Time Standard -55 days  Interim Rules -Pass UII from receipt to SDR module 23

Quality–Related Receipt Notification Discrepancy Codes -Q11, Returned or stock screen item, PQDR exhibit deficiency -Q66, Customer return or stock screen item failed under use -Q22, New procurement receipt, customer return, redistribution order or stock screen item quality deficiency, contractual noncompliance -Q33, Returned, redistribution order, or stock screened item suspected material deficiency (DLA Customer Returns Improvement Initiative (CRII) Program items only) -Q44, New procurement receipt, customer return, redistribution order or stock screen item contracting deficiency, for specification and/or technical data deficient -Q55, Item under investigation -Q77, New receipt, customer return, redistribution order or stock screen item identified as a Critical Safety Item (CSI) -Q99, New receipt item received for “First Article Test” 24

25 Way Ahead  Assess and evaluate the feedback provided  DLA Logistics Management Standards to draft Proposed DLMS Changes  Components begin planning for integration of discrepancy reporting from within ERP in association with receiving functionality  Component shipping activities begin planning for capability to reconcile UII/serial numbers reported vs. UII/serial number shipped

Backup Slides 26

27 A compliant IUID Mark – Syntax & Semantics IUID Basic Tenets - Marking Formats: ATA: Text Element Identifiers (TEIs) [)> R S 12 G S MFR 0CVA5 G S SER 674A36458 R S E o T GS1: Application Identifiers (AIs) [)> R S 05 G S A0B9C3D6 R S E o T MH : Data Identifiers (DIs) [)> R S 06 G S 17V0CVA5 G S 1P1234 G S S R S E o T Using the syntax of ISO/IEC 15434, either of the three formats (TEIs, AIs, or DIs) can be used and Construct #1 (serialization within company), Construct #2 (serialization within Part/Lot/Batch) or DoD accepted equivalent are acceptable. This interoperability of formats permits enterprises to use their prevailing machine-readable marking processes Resulting Unique Item Identifier (UII) is globally unique serial number Imaging Device

28 Receiving Controlled Items by IUID UII (Distribution Depot &Retail Site) – Additional Business Process Requirements Stow / Inventory ReceivingIssuing * Requires enforcement of MIL-STD 129 marking requirement (add to UID contract clause?) During transition period, if there is a serial numbered item, collect it and associate it w/appropriate UII on receipt ** If the package cannot be opened, see alternate procedures. 1.When prompted, receiver uses AIT to collect UII(s) from outside of unit packaging* via PDF 417: 1.Military Shipping Label 2.Outside packing list (unclassified) 2.If UII prepopulated by ASN, the collected UIIs are systemically compared to the ASN UII 3.If UII(s) are not available on the exterior packaging, the receiver uses the UII in the ASN to place new label w/UII on packaging, 4.System will prompt user to indicate evidence of tampering/damage. If yes, then system will prompt user to open packaging to collect UII(s) from the item(s) and repackage by P&P. 5.If new procurement, there is an extra acceptance step for the receiver (WAWF) 6.If no UII in MSL or ASN and/or user finds UII mismatches, the system will prompt user to execute discrepancy instructions. (See Discrepancy Reporting Slides)

Receiving Items by UII from New Procurement (Distribution Depot) – Additional System Requirements UID Registry WW 1.Receive advance UII data (i.e. 856) (H, S) (see Note 1) 2.Prompt user to collect UII(s) via AIT (H, S) 3.Based on business rules, e.g. evidence of tampering, user may collect UII(s) on the item (H, S) 4.Send 527R Receipt to ICP with UII data (ICP keeps track of UIIs by storage depot) (H) (see Note 2) 5.Notify WAWF of acceptance (e.g. 861 or direct WAWF web entry) (see Note 3) (H, S) 6.Store UIIs in warehouse mgt system (H, S) 7.When prompted by receiver, print new packaging label with UII(s) in PDF 417 format (H, S) 8.If UII mismatches occur between advance UII data and UIIs received, system will prompt discrepancy actions (H, S) Note 1: H (High), S (Standard) = Notional FLIS IUID Designator Levels Note 2: 527R includes UII(s) for all items received by supply condition, regardless of acceptance. Note 3: 861 is sent with UII(s) for any partial quantity received and accepted. UII(s) are not sent for total quantity accepted or total quantity not accepted. DAAS to WAWF Distribution Depots 527R 527D IMM 527D 527R ERP DSS 861 from WAWF GEX Update UID Registry UID Registry Manufacturers/ Suppliers 856 IUID Material 861 from DSS to WAWF from WAWF to ICP WAWF

30 Receiving Items by UII from Redistribution Orders (RDOs) Materiel Returns Program (MRP) and Other Returns (Distribution Depot) – Additional System Requirements DSS 1.Receive advance UII data(i.e. 856S (RDO) or 856R (MRP) (H, S) (see Note) 2.Prompt user to collect UII(s) via AIT (H, S) 3.Based on business rules, e.g. evidence of tampering, user may collect UII(s) on the item (H, S) 4.Send 527R receipt to ICP with UII data (ICP keeps track of UIIs by storage depot) (H) 5.Store UIIs in warehouse mgt system (H, S) 6.When prompted by receiver, print new packaging label with UII(s) in PDF 417 format (H, S) 7.If UII mismatches occur between advance UII data and UIIs received, system will prompt discrepancy actions (H, S) Note: H (High), S (Standard) = Notional FLIS IUID Designator Levels DAAS 856S/ 856R Customer or Distribution Depots Distribution Depots 527R 527D IUID Material IMM 527D527R ERP 856S/ 856R 856R DSS or Customer DSS

31 Below Wholesale Receiving Items Requisitioned – Received from Depot Stock – Additional System Requirements 1.Establish due-in based on requisition submission 2.Receive advance UII data based on 856S (H, S) (see Note) 3.Prompt user to collect UII(s) via AIT (H, S) 4.Based on business rules, e.g. evidence of tampering, user may collect UII(s) on the item (H, S) 5.Process receipt into below wholesale inventory with UIIs and store UIIs in warehouse mgt system (H, S) 6.Send 527R MRA to ICP with UII data (See alternative approaches) (H) 7.When prompted by receiver, print new packaging label with UII(s) in PDF 417 format (H, S) 8.If UII mismatches occur between 856S and materiel received, system will prompt discrepancy actions (H, S) Note: H (High), S (Standard) = Notional FLIS IUID Designator Levels DAAS 856S Customer Distribution Depots 856S 945A or 867I IUID Material 527R MRA IMM 527R ERP DSS Customer Supply System 945A or 867I

32 Below Wholesale Receiving Items Requisitioned – Received from DVD – Additional System Requirements 1.Establish due-in based on requisition submission (see Note 1) 2.Receive advance UII data based on 856 (H, S) (see Notes 1 & 2) 3.Prompt user to collect UII(s) via AIT (H, S) 4.Based on business rules, e.g. evidence of tampering, user may collect UII(s) on the item (H, S) 5.Process receipt into below wholesale inventory with UIIs and store UIIs in warehouse mgt system (H, S) 6.Send 527R MRA to ICP with UII data (H) 7.For destination acceptance at Ship-to, notify WAWF of acceptance (e.g. 861 or direct WAWF web entry) (see Note 3) (H, S) 8.When prompted by receiver, print new packaging label with UII(s) in PDF 417 format (H, S) 9.If UII mismatches occur between 856/856S and materiel received, system will prompt discrepancy action (H, S) Note 1: 856 needs requisition document number. Due-in needs to be updated for contract number provided via supply status. Note 2: H (High), S (Standard) = Notional FLIS IUID Designator Levels Note 3: 861 is sent with UII(s) for any partial quantity received and accepted. UII(s) are not sent for total quantity accepted or total quantity not accepted. DAAS 856 from WAWF Customer IMM 527R ERP GEX Update UID Registry UID Registry Manufacturers/ Suppliers 856 IUID Material 861 from Customer to WAWF from WAWF to ICP WAWF to WAWF 861 Customer Supply System 527R MRA

33 Receiving Items from New Procurement, RDOs and MRP (ICP Process) – Additional System Requirements 1.Receive update from depot of which UII(s) have been received (i.e. 527R Receipt) (H) (see Notes 1 and 2) 2.New Procurement Only - Receive update from WAWF for acceptance (i.e see Note 3) (H) 3.ICP stores UII(s) by storage site on ICP inventory records (H) Note 1: H (High), S (Standard) = Notional FLIS IUID Designator Levels Note 2: 527R includes UII(s) for all items received by supply condition, regardless of acceptance Note 3: 861 is sent with UII(s) for any partial quantity received and accepted. UII(s) are not sent for total quantity accepted or total quantity not accepted. GEX DAAS 856/ 856R/ 856S 861 Update UID Registry UID Registry Manufacturers/ Suppliers Distribution Depots R 527D IUID Material IMM 527D R WAWF ERP DSS 861