1 Design of a wastewater collection Network and a Water Distribution Network for Azmut using SewerCAD and WaterCAD Prepared By: Mohammad noor Shawer Ayman.

Slides:



Advertisements
Similar presentations
Design of W.W. Collection System
Advertisements

Design of a Sewer System and Water Distribution Network for New Nablus Area Prepared By Saja Younes Shereen Lubbadeh Majd Samarow Supervisor Dr. Mohammad.
Outline Objectives of the Project. Study Area. Questionnaire Analysis. Network Analysis. Future Demand Estimates. Design Criteria EPANET Analysis Cost.
Biet Qad Village Climate Relative Humidity Evaporation.
Hydraulic Modeling of Water Distribution Systems
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
o To facilitate the process of providing consumers with clean water. o Provide quantity that suit their needs and control the quality of this water because.
Water network in Meithalun Prepared by:-- -Khalid Nairat -Ghaith Daraghmeh -Mohammed Daraghmeh Supervisor:-- Dr. Amal Al Hudhud An – Najah National University.
Prepared By Abeer Mohammed Ala' Snober Suhad Dwaikat Wajeha Ma'ani Submitted to Dr. Amal Al-hudhud.
OUTLINE 2 INTRODUCTION OBJECTIVES METHODOLOGY RESULTS FOR SEWAGE SYSTEM RESULTS FOR SEWAGE SYSTEM CONCLUSIONS & RECOMMANDATIONS CONCLUSIONS & RECOMMANDATIONS.
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
Introduction Before going ahead into our project I want first talk in a brief about the importance of water, water is essential to sustain a life and.
Prepared by Musab O. JayyousiOsama H. Shaheen Dr. Mohammad N. Almasri Modeling and Management of the Stormwater of the Old City of Nablus Nablus – Palestine.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
Prepared by: Ayah Yasin SUPERVISOR Dr. HAFEZ SHAHEEN PROJECT 2 : FALL Wastewater Collection system for Anin 1.
Outline Introduction. Population Analysis Study Area Objectives
An-Najah National University Civil Engineering Department
 Sanitation situation reflects the development of communities.  Health of people is also related to the sanitation situation.  Existing of sewerage.
A N -N AJAH N ATIONAL U NIVERSITY F ACULTY OF E NGINEERING C IVIL E NGINEERING D EPARTMENT D ESIGN OF W ASTEWATER C OLLECTION S YSTEM FOR A SIRA A SH -S.
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
Objectives Introduction Introduction Study Area Methodology Results & Recommendations.
Design of bulk supply network in the southern West Bank Prepared by: Muna Faidi Aya Nofal.
AN – Najah National University
Sanitary Engineering Lecture 7
Water Distribution Network for South- East Zone of Qalqilia City
Graduation Project Water Works for Al-Marj Neighborhood
Graduation Project II Analysis and redesign of water network for Sabastia Village  By: Abdurra'oof Huwari Under supervision of Dr. Anan Jayousi.
Prepared By : Kamal Hamaydeh Ahmad Odet-allah
Analysis of Qabalan, Water Network , Design of Wastewater
An-Najah National University Faculty Of Engineering
An-najah National University Faculty of Engineering
Analysis and Design of the Water Distribution Network for Teeba area,Nablus By Ranin Abu Gharbieh Under supervision of Dr. Mohammad Almasri.
Tamer Sultan Mousa Ziadeh
An – Najah National University
Design of sewer system Water Resources Engineering (Semester A -2017)
Water Works For Baqa Al-Sharqyah Town -Analysis And Re/Design
Coursework guidelines
An-najah National University Faculty of Engineering
An– Najah National University
An-Najah National University Faculty Of Engineering
Design of Wastewater Collection Network for Teeba
Design Of Water Distribution Network Of Misilyah Village Using EPANET
Design of WWTP & Main Sewer Lines For Tubas Region
& Hydraulic Analysis of the Water Research about Wadi Al-Zaimar
Prepared By : Osama amr Qutayba mElhim
An-Najah National University Faculty of Engineering
Developing Hydraulic Model of Water Distribution Network in Rafidia Area, Nablus by Abeer Melhim Noor Saleh Supervisor Dr.Mohmmad.
Selat al-daher water distribution network
Wastewater collection network & treatment plant for Burqeen village
AN-najah National University Faculty of Engineering Civil engineering Department Hydraulic Analysis of the Water Distribution Network of Kifl Haris using.
بسم الله الرحمن الرحيم Al-Najah National University
Design of water distribution network for Silwan village By Ahmad Amen Abassi & Mohammed Abd Al-Aziz & Mohammed Al-Akhras Under supervision of Dr.
Design of A Sewer Network For Tell Village (Sewer collection network)
Graduation project report II Supervisor: Dr. Anan Jayousi
The Design of Water And Wastewater Networks For Qilqis
Design of A Sewer Network For Dair-Istiya Village
Water Distribution Networks Under Intermittent Pumping: Development of a hydraulic model and Assessment of water losses Prepared by Mohammad Jihad Abdo.
Design of A Sewer Network For Siries Village
Wastewater collection and treatment plant system for al Yamon
Hydrological Study & Flood Mapping of Wadi Zeimar-Anabta Town
Design of a Wastewater Collection Network for the New Nablus Area (B)
Design of a wastewater network for Al-Swani - Tulkarm
An-Najah National University
Analysis of the Water Distribution Network of
An - Najah National University Civil Engineering Department
Design of Waste Water Collection Network for Kufr AL-Deek Village
An-Najah National University Civil Engineering Department Graduation project  Hydraulic analysis & Redesign of Al-Masaken & Old Askar Camp Water Supply.
Mohammad Khalid Sawalha
Sanitation Study and Wastewater Network System AL Tayba Village
An-Najah National University
Presentation transcript:

1 Design of a wastewater collection Network and a Water Distribution Network for Azmut using SewerCAD and WaterCAD Prepared By: Mohammad noor Shawer Ayman Hani Kabaha Fahmi Zahi Alawni Supervisor : Dr. Mohammad N. Almasri 2012

2 Objectives

The Objectives of the Project:  The main objectives of this project are to: 1) Design a Wastewater collection network for Azmut village 2) Design a water distribution network for Azmut Village 3

The Study Area 4

Geography and Topography:  Azmut is located to the north - east of Nablus City, 5 km away from the city center. It stands at elevation of around 469m, the maximum elevation is 560 m and minimum elevation is 440 m above sea level.And total area of donums, ) the population in Azmut in 1997 was 2035 persons. this number increased in 2007 to 2797 persons. So, we can calculate population growth rate = 3.2% 5

6 Design of Azmut Wastewater Collection Network

Introduction  Azmut Village without a wastewater net work.  The disposal of sewage was done through traditional methods as cesspits, but the disadvantages of this method such as ( pollution,disease and the cost of evacuation of wastes ) requires the presence of sewage system.  So it is necessary to design a sewage collection network in the areas expected to be populated in the future since these networks are in general essential parts of the infrastructure of these areas 7

Objective  The main goals of the design: 1- Prevent pollution. 2- Make people comfortable. 3- In the future we can reuse wastewater after treatment 8

Methodology 9 Collecting Data Azmut Village Council Working with Data AutoCAD map AutoCAD DXF to SewerCAD Entering the data SewerCAD Results Load Manholes and Conduit Project Processing Steps: Design Excel sheet

Excel Sheet Data 1- Calculate the future population by the following equation: P=p 0 *(1+r) n where: P : is the future population. P 0 : is the present population. r : is the annual population growth rate. n : is the period of projection. 2-The population of Azmut in 2061 = The water consumption was (100) L/c.d 4- 80% of demand taken as waste water. 5-Max.hourly demand = 3 6-Design period = 50 years 10

Constraints used in design  Velocity: we consider velocity constraints as Nablus municipality which is between (0.5-3) m/s.  The slope: to be between ( ).  Size of pipes: we used circular pipes with minimum diameter of 8 inches. 11

Design of sewers  The most commonly formula is Manning formula: V=1/n * R^2/3 * S ^1/2 Where: n: Manning coefficient. S: slope of the pipe. R= (A/P) :hydraulic radius. A: cross section area P: wetted parameter 12

Results  Diameter: all pipe diameters are 8 in  Manholes : number of manholes = 159.  Pipes: number of pipes = 159.  Outlet : we use two outlets.  Pipe materials: Polyvinyl chloride PVC. 13

Velocity 14

Conclusion and Recommendation  Slopes : We face some problems, such that slope is largest than max. slope,so we use droop manhole to solve this problem  Velocity : low speed for some pipes in the network reached a speed of less than 0.5 m / s, we have to solve this problem by changing the slope of the low-speed tube by drilling an appropriate distance. 15

 Total cost of sewer is $  Total cost of excavation is $  Total cost of manholes is $  Total cost of covers is $  Total cost of basement concrete is 1827 $  Total cost of base coarse is 7800 $  Total cost of asphalt is $  The total cost of the network is $ 16 Total Cost of the Sewage Network

17 Design of Azmut Water Distribution Network

Introduction 18

The importance of water distribution network  Water distribution networks are used to distribute water from the sources to the consumptions.  WDNs decrease the effort, time, cost and make the life easier  The efficiency is very important, and to check on this, a hydraulic analysis is carried out 19

Water distribution networks The WDNs should be capable of:  Meeting the demands  Satisfactory the pressure head  The WDNs may be classified as:  Grid (looped) systems  Branching systems  Combination of the both. In our design we considered the combination of both 20

Methodology 21

Methodology 22 Collecting Data Azmut Village Council Working with Data AutoCAD map AutoCAD DXF to WaterCAD Entering the data WaterCAD Results Demand Pipes and Nodes Project Processing Steps: Design

Azmut WDN 23  Azmut WDN 55 nodes 69 links  Azmut reservoir : Elevation = 506 m,

Data Input:  Growth rate (r) = 3.2%  Design Period = 20 years  water consumption per capita day = 100 L /C-d  Demand : we calculate the num. of capita for each service area by Thiesson Polygon  Diameter : we calculate the largest diameter = 3 in and we use all diameter ≤ 3 in 24

Results 25

Pressure After Adding Pump 26

Conclusion  Min. head in junction = 15 m  Velocity range : 0.2 m/s ≤ v ≤ 3 m/s  Pump Power = 3.58 KW 27

Thank You… 28