Managing deviations from the Design Target with the Safety Case IAEA GEOSAF II Plenary 2014.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

EMS Checklist (ISO model)
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
Integration of post-closure safety and operational safety in the Geological Disposal Safety Case The international harmonization project GEOSAF 2 Recap.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Contractor Management and ISO 14001:2004
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
Overview Lesson 10,11 - Software Quality Assurance
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Hazard Analysis and Critical Control Points
Protection Against Occupational Exposure
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
Codex Guidelines for the Application of HACCP
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Definition, Role and Documentation of the Safety Case: Quick Review
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Introduction to ISO New and modified requirements.
Session 3.11 Risk Identification Presented By: RTI, JAIPUR.
N By: Md Rezaul Huda Reza n
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Software Quality Assurance Activities
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Overview of the Work Zone Safety and Mobility Rule Module 1.
TM Technical Meeting on the Disposal of Intermediate Level Waste
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Hazards Identification and Risk Assessment
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Systems Analysis and Design in a Changing World, 6th Edition
Regulatory Framework for Uranium Production Facilities in the U.S.
IGD-TP Pilot Project on Operational and Construction Safety Status May 2014.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
El Cabril near surface disposal facility
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
WG2. §1. Introduction Simplification of the introduction, e.g.: – New structure 1.Background 2.Objectives 3.Scope – Synthesize some of the information.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Requirements for.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Expert Review of the Licensing Documentation of the Centralized Facility for Long-Term Storage of Disused Sealed Radiation Sources Oleksii Tokarevskyi.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Computer Security: Principles and Practice First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Chapter 17 – IT Security.
1 Introduction to safety case and safety assessment: purpose and content of safety case Ian Crossland Crossland Consulting
Training Course on Integrated Management System for Regulatory Body
Administration of a FIDIC Contract - Project Control
Food Production Systems
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Module SCD 2: Safety Requirements for Safety Assessment and Safety Case General Safety Requirements for Safety Assessment NSD 1.1.
Introduction: IAEA activities / Documents on human intrusion
PSS verification and validation
Presentation transcript:

Managing deviations from the Design Target with the Safety Case IAEA GEOSAF II Plenary 2014

Content Walk through of the safety case loop diagram Role of safety case during construction and operation Prerequisites for high quality operations (build and Operate) Role of monitoring, QA/QC and qualification procedures Assessment of deviations Examples Updating the Safety Case

Disposal facility life cycle At the time of disposal facility operational period the safety case has passed stepwise process on development (concept, siting, preliminary design,...) After authorization the disposal facility will in many case be operated for several decades. The facility is also likely to be extended in several stages with concurrent activities (excavation, waste emplacement, partial closure) The continuous use of Safety Case and demonstrations that performed activities comply with safety envelope is fundamental for success.

Kuva tähän alkuun

Role of the Safety Case Discussed in earlier presentations For disposal facility the important aspects of safety case is that it integrates operational and post-closure safety Safety case should define requirements that construction and operation shall fulfill (fulfilled as-built initial state “assures” assessed long-term safety) These requirements define safety envelope which again gives provisions for design target.

Prerequisites for high quality operations Integrated management system – Systematic process for development and management of requirements – Comprehensive project management procedures – Design specifications and plans that construction and operation must follow – Procedures for constructions and operation activities – Monitoring of safety related key parameters – Demonstration of compliance within design target (DT) Discussed for example in IAEA GS-R-3 and Safety Guide GS-G-3.4

Monitoring and demonstration of compliance Discussed in earlier presentation Monitoring is discussed for example in IAEA draft Safety guide (DS357) Management system should include detailed procedures for demonstration compliance with design target Monitoring should focus on parameters that are important for safety and also observable in real disposal facility Monitoring and QA/QC procedures are a tool for verifying that as-built state is acceptable Examples – Tolerances of disposal rooms – Waste package testing – Waste acceptance verification – Monitoring of favorable site properties – … In compliance?

In case of deviation from DT (1) Most likely deviations are found during construction and operation – if not, the management system is not working properly Deviations should be addressed through predefined procedures – First step in deviation analysis is to assess it safety significance – Analysis may focus on estimation of large enough safety margin or call for more detailed analysis of the effect – Based on the analysis deviation can be approved, documented and closed or it may require corrective actions or rejection product Deviation management process is discussed in further detail for example in IAEA GS-R-3 (non-conformances and corrective and preventive actions)

In case of deviation from DT (2) Possible, more safety case related, actions for the implementer based on monitoring results or in case of deviation : – Refine construction or operational procedures to reverse a trend that if left unaddressed could cause the parameter eventually to fall outside of the DT (and potentially outside of the SE); – Commission further research to understand the consequences of the deviation. This may have the effect of expanding the DT and consequently bringing the value into compliance; – Review the safety case to determine whether additional safety features can be claimed thereby compensating for the design deviation. An updated safety envelope could be also envisioned at this stage. – In extremis the deviation may be so severe, so far from the SE that the operator will need to consider whether it is still possible to achieve a satisfactory safety case.

Examples from “real life” Exceeding excavation damage zone (EDZ) tolerance – Maximum EDZ is given in tunnel technical specification – Depth of EDZ is examined with ground penetrating radar – Continuous EDZ might have effect on post-closure safety as a potential transport route Possible actions: – In any case assessment of causes for exceeding specification – Approval and documentation of exceeding, if only local – Cutting and plugging of continuous EDZ (engineering solution) – Re-assessment and update of safety case, if continuous EDZ can’t be avoided

Examples from “real life” Exceeding tunnel profile specification – Theoretical tunnel profile is given in tunnel specification and in design drawings – As-built profile is examined with laser scanning and other measurements – Over excavation has an effect on tunnel backfill emplacement and possibly on post-closure performance Possible actions: – In any case assessment of causes for exceeding specification – Approval and documentation of exceeding, if not affecting DT when assessed together with backfill performance – Redesign of tunnel backfill and assessment of performance if needed to meet DT

Examples from “real life” Waste package tested to have too large defects – Waste package specification includes acceptable defect size and type – Larger defect can have an effect on corrosion resistance or mechanical integrity in extreme loading cases (operational and post-closure) – Waste container is a key safety barrier and deviations have always safety implication Possible actions: – More detailed re-evaluation of the defect size using more accurate methods or detailed sizing of defect – rejection of waste container component or welding that does not meet design specification

Examples from “real life” Water inflow to tunnel exceeds maximum limit used in safety case – In crystalline bedrock a key target is to maintain favorable site properties – Large water inflow has an effect on hydrological and geochemical features of the whole site (water table drawdown, up coning of deeper groundwater) Possible actions: – More detailed re-evaluation of the possible change in the site properties – a long-lasting or irreversible change might recall for large re-assessment, change of disposal design or even rejection of site

Updating the Safety Case Safety case should be updated during disposal facility operation A comprehensive update will take place according to national approach, but should be done for example in case of – stepwise facility authorization – other facility modification – periodic safety review – relicensing of facility (if for example required by national legislation) – Before closure of the facility New information from operational period should be integrated into the safety case – Assessment that operation has demonstration that operation (as-built state) has been in compliance with design target and safety envelope – experience (more knowledge from construction, fabrication and emplacement) – Site characterization data – New safety related information (R&D, other facilities, …)

Kuva tähän alkuun