Metro Gold Line Eastside Extension. Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

ISO 9000 Quality Standards ISO 9000 describes quality assurance elements in generic terms that can be applied to any business. It treats an enterprise.
More CMM Part Two : Details.
Quality Assurance for Tribal FIFRA Enforcement Grants David R. Taylor EPA Region 9 Quality Assurance Office.
Satellite Notification and Acceptance Program (SNAP)
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Quality Management System
ESTIMATING By Laith Jacob.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
Documents and Records-Writing a Quality Manual-Module 16 1 Quality Manual Structure and Contents Quality Manual Structure and Contents - optional.
Quality Assurance/Quality Control Policy
ISO 9000 Certification ISO 9001 and ISO
5.2 Personnel Use competent staff Supervise as necessary
Managing Project Procurement
SQA Work Procedures.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Effectively Managing Your Water System Project Rural Community Assistance Partnership Practical solutions for improving rural communities © 2012 All rights.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
MANAGING ENGINEERING & TECHNOLOGY By Doug Wesselschmidt, PE.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Standards of Practice Course
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Server Virtualization: Navy Network Operations Centers
Visit us at E mail: Tele: www.globalmanagergroup.com.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
1 RMS Training Sponsored by the RMS Center July 2006.
DLA-Energy Recurring Maintenance & Minor Repair Program 10 December 2010 US Army Corps Of Engineers Maintenance andDLA-E Repair Program.
From Research Prototype to Production
Mid-City Exposition Light Rail Transit Project Closed Session Presentation March 2, 2006 Exposition Metro Line Construction Authority.
WAP Quality Management Plan NASCSP 2013 Annual Training Conference Phoenix, Arizona September 11, 2013 Barb Klug-Sieja – Bureau Director Hoyt O’Brien –
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
CMM Level 2: Repeatable Copyright, 2000 © Jerzy R. Nawrocki Quality Management.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Construction Quality Management Metro Goldline Eastside Extension Los Angeles January 19, 2007 ASCE Construction Institute Conference.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
Preparing and Submitting PS&E Packages What does ODOT need? Local Agency Project Delivery Conference May 2 & 3, 2006.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Current MFRPS State Implementation Status February 3, :15 – 9:45 am Timothy Weigner Staff Director U.S. FDA Office of Regulatory Affairs, Office.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Chapter 6 Requirements for a Maintenance Program.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
UnionPay Card Manufacturer Certification Introduction.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Supporting quality devices
Preview of Access Processes for Working at SURF
Sponsored by the RMS Center
Designers’ Manual Overview and Chapter Contents
Quality Assurance for Emulsified Asphalt Surface Treatments
Lecture 10 PROCUREMENT Ferdinand FASSA.
Overview: ICS Evaluation Procedures
Prime Factors for Successful Preservation Treatments
DOE Review of the LCLS Project October 2006
Software Reviews.
Fiber Reinforced Polymer Systems
Presentation transcript:

Metro Gold Line Eastside Extension

Eastside Extension Community Little Tokyo Mariachi Plaza Mariachi Plaza Kiosk Mural in East LA

Eastside LRT Constructors, J.V.: 50% 15%35%

Quality Program – QA/QC Quality Manual/Plan – site specific Quality Procedures: Washington Group International procedures modified for project Project Execution Procedures (PEPs) that have quality output All PEPs and the Sarbanes Oxley Act Flow down to Subcontractors

DESIGN Design Quality Management DMJM+Harris/WIS JV Used DMJM+Harris Design Project Quality Manual – modified for this project

Design QM Major Elements Design Task Protocols – defining design inputs Preparation and Review of Calculations, Drawings and Specifications Technical Studies and Reports Software Quality Assurance

Design Coordination 19 Design Subcontractors 6 Design-Build Subcontractors 13 Third-party public authorities 21 Design Packages Over 300 specification sections Nearly 4000 drawings Think how many review comments we received!

CONSTRUCTION QUALITY

Organization Quality Manager reports to the Project Director AND Business Unit Director of Quality Independent field inspection staff On-site test lab for soils, asphalt and concrete – ASHTO & Caltrans certified

Management Review Yearly audits by Corporate or Business Unit home office In-house quality surveillance program Monthly Quality Summary Reports

Document Control Performed under defined processes/procedures Nearly all documents are scanned and available from any desktop computer – great time saver for: –Submittals –RFIs –Correspondence

Procurement All Subcontracts receive Quality review and approval prior to RFP All purchase requisitions receive Quality review and approval

Process Control Work Plans Readiness Review Meetings

WORK PLANS 1.Description of work 2.Prerequisites 3.Public exposures 4.Hazard analysis 5.Applicable Specifications & Drawings 6.Submittals & status 7.RFIs & status 8.List of supervision and subcontractors 9.Schedule 10.Any special handling, shipping or storage requirements 11.Special process included (welding, NDE, coatings, etc.) 12.Acceptance criteria and tolerances for critical work elements 13.Inspections required and hold points 14.Checklists 15.Protection of completed work

Inspection & Testing Daily Reporting Use of Checklists On-site testing laboratory (allows for additional job-control testing) C0800 DBB vs. C0801 DB contract/designs

Training Jobsite orientation Lunch & Learn – one hour presentations at lunch time