California Independent System Operator A Comparison Between The CA ISO’s Market Design 2002 Proposal (MD02) and the FERC’s Standard Market Design (SMD)

Slides:



Advertisements
Similar presentations
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Advertisements

Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Convergence Bidding Overview Margaret Miller Manager, Market Design & Regulatory Policy CPUC Convergence Bidding Workshop August 26, 2010.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Topics The Midwest ISO The Midwest Market Market Design Process
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Presentation to WECC Market Interface Committee March 24, 2015
The FERC SMD and the Midwest Electricity Markets
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Essential Features of California’s New Market Design Market Redesign.
Nodal Pricing in an LMP Energy Market
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Bulk Power Transmission System
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
Working Paper on Standardized Transmission Services and Wholesale Electric Market Design Alice Fernandez, Derek Bandera, Connie Caldwell, Jignasa Gadani,
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Illinois Wholesale Market Update December 10, 2003.
All Island Single Electricity Market IWFA Update Laura Brien
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
1 A Conversation about MISO Paul Spicer November 8, 2007.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
EIM AWG July 5, Guiding Principles The intent of the group is to work collaboratively to better understand the WECC EIM costs and benefits analyses.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Objectives and Strategies for ENA Power Groups Notes from the June 1, 2000 Wholesale Markets Meeting.
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
FERC Standard Market Design Working Papers
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Electricity Wholesale Markets: Designs for a low-carbon future
The Future of Demand Response in New England
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Mountain West Transmission Group Panel Discussion
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

California Independent System Operator A Comparison Between The CA ISO’s Market Design 2002 Proposal (MD02) and the FERC’s Standard Market Design (SMD) Presentation to The Committee on Regional Electric Power Cooperation Steve Greenleaf Director of Regulatory Policy CA ISO April 30, 2002 San Diego, CA

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 2 - Overview - Need for ISO Market Design Current FERC price mitigation measures scheduled to end on September 30, 2002 FERC December 19, 2001 Order required ISO to file revised Congestion Management and plan for a day-ahead energy market by May 1, 2002 Fix existing design flaws to improve ISO’s ability to perform its core functions

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 3 Conformance with FERC Standard Market Design On March 15 & April 10, 2002 FERC issued Working Papers on Standard Market Design (SMD) – final Rulemaking expected in Summer, 2002 ISO’s comprehensive MD02 proposal comports with the FERC design on key elements.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 4 Conformance with FERC SMD

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 5 Comprehensive CA ISO Market Design Changes

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 6 Available Capacity (ACAP) Obligation Rationale for ACAP A root cause of the California crisis was the weakening of the traditional "obligation to serve" – responsibility of load-serving entities (LSEs) to procure sufficient supply for peak loads and operating reserves The consequence was that responsibility fell on ISO as supplier of last resort – leading to a real-time scramble for resources to maintain reliability, and to extremely high prices in ISO markets and Out-Of-Market purchases – and resulted in over 13,000 OOM calls! Therefore, ISO proposes to address its needs – support of its core function, reliable grid operation – through Available Capacity (ACAP) Obligation

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 7 Key Objectives of ACAP Obligation Develop a mechanism that supports reliable operation of the system, consistent with the ISO’s statutory obligation under AB1890; Provide a vehicle through which market participants can contract, schedule and bid in the forward market, thus achieving two key goals of the market design –Moving operational decisions from real time to the forward market. –Stabilizing spot-market prices by creating further incentives for forward contracting and thus a platform for generation and demand-based investment.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 8 Key Considerations in ACAP The ACAP proposal should be consistent with the ISO’s limited role in the energy market – that of supporting reliable system operation. Customers should not incur additional costs, through ACAP obligation, that do not enhance reliability. The ACAP obligation should not create a mechanism for exercising market power. ACAP should provide a platform for capital investment in the California energy market.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 9 Integrated Forward Market Design Centerpiece of the MD02 Design Proposal Integrated Congestion Management, Energy Market, Ancillary Services, Unit Commitment Service Forward Congestion Management –Locational Marginal Pricing (LMP) based on Full Network Model (FNM) – Enforcement of all network constraints ensures feasible schedules, consistent with physics of electricity flow Day Ahead and Hour Ahead Energy Markets –LMP-based congestion management requires energy trading to clear congestion, thus creating a bid-based energy market –Eliminates Market Separation Rule and Balanced Schedule Requirement –Accommodates optional balanced bilateral schedules Firm Transmission Rights (FTRs) –Point-to-point or "source-to-sink" rights needed to allow complete hedging of risk under LMP congestion management

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 10 Locational Market Pricing (LMP) Provides hourly price signals that reflect physical constraints of system under all load and system conditions Locational price patterns indicate where additional generation and transmission upgrades are needed Nodal prices correctly charge grid users for their impacts on congestion Eliminates distinction between inter-zonal and intra- zonal congestion – manages ALL congestion in forward market to create feasible schedules For loads, locational price differentials will be mitigated by allocation of FTRs

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 11 Integrated Forward Market Balanced schedules will be an option –Physical bilaterals can obtain priority against curtailment for congestion via FTRs or as price takers for congestion charges Generator ramping schedules must be feasible Simultaneous A/S market will procure Spin, Non-Spin and Regulation –Replacement Reserve can be eliminated –Procurement based on Energy and Capacity bids Simultaneous Unit Commitment Service (UCS) –Self-commitment will be an option Energy, A/S, UCS – subject to transmission constraints Residual Unit Commitment runs after integrated DA market

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 12 Redesign of FTRs LMP requires “source-to-sink” FTRs –Hedge congestion charges calculated as nodal price differences –FTR specifies injection (source) and take-out (sink) points, ignoring paths of flow –Requires "simultaneous feasibility" to define and allocate FTRs –End points may also be trading hubs or load aggregations –Physical scheduling priority still viable in day ahead Multiple FTR terms – 3-year, annual, monthly FTRs are settled based on day-ahead prices FTRs are "obligations" – failure to schedule may result in liability for congestion charge in opposite direction –Proven algorithm for allocating rights –Strong incentives to buy FTRs consistent with expected use of grid –Considering need for "options" (no liability associated) and “flowgate” rights in addition to basic source-sink obligations.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 13 Redesign of FTRs Allocation of FTRs –FTRs to be allocated initially to Load Serving Entities (LSEs) on behalf of end-use consumers, based on historical use of the grid Allocation to LSEs hedges consumer risk of location-based pricing –Residual FTRs (FTRs in excess of those allocated to LSEs) will be auctioned by the ISO with revenues allocated to Transmission Owners Converting ETCs to FTRs –Ultimate objective – all grid users subject to same scheduling procedures and time line –Eliminate "phantom congestion" due to current ETC scheduling time line –Conversion may require more complex FTR model (obligations, options; source-sink, flowgates), requiring unproven allocation algorithms ETC rights not all the same – one conversion approach may not satisfy all ETC holders –Transitional approach may be to implement Recallable Transmission Service (RTS) to reduce phantom congestion impact, while pursuing ETC-to-FTR conversion on a longer time frame

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 14 Load Scheduling and Settlement ISSUE – What is the appropriate granularity of load scheduling and settlement? Option A – most aggregated level – current congestion zones (NP15, ZP26, SP15) or PTO areas (PG&E, SCE, SDG&E) –Proposed for trading hubs, but not for load scheduling because of near total elimination of any locational price signal to loads Option C – finest level – nodal –Proposed as option for loads, but not requirement, because of implementation difficulty Option B – intermediate – "Load Aggregations" –Existing Demand Zones and Load Groups –Custom aggregations to reflect a LSE's actual load pattern –=> Modified Option B2 – provide FTRs (or FTR auction revenues) to loads to hedge (or compensate) risk of congestion charges. Under all aggregations –congestion management distributes aggregate loads to nodes –aggregation prices are load-weighted averages of nodal prices.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 15 Issues re Load Settlement Primarily an equity issue –Loads should not be at risk for price impacts of congested areas, because grid was not built under a locational-pricing paradigm and is not adequate to allow all areas of the grid to enjoy equal benefits of competitive generation supply. –Will impose competitive disadvantage on non-utility LSEs and their Direct Access customers, since these LSEs are not able to average wholesale costs across large areas. –Possible solutions: Phase in granular pricing for loads in conjunction with transmission upgrades in severely constrained areas. Provide FTRs (or FTR auction revenues) to loads in constrained areas as hedge or compensation for congestion risk. Proposal – Option B2 – settle at demand zones initially and provide FTRs to loads to mitigate locational price risk, AND, re-invigorate transmission planning process

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 16 Hour Ahead Market Revision of HA Market Time Line –Simultaneous congestion management, energy, AS and unit commitment, same as DA –ISO proposes to close HA and Real-time Markets at the same time, i.e., T-60 (60 minutes before start of Operating Hour) –Energy bids not cleared in HA would become bid pool for real time imbalance energy Need for Hour Ahead Settlement –Only California ISO has 3-settlement system –HA settlement provides a means to limit exposure to real-time imbalance energy charges and deviation penalties –Allows late energy trades to schedule available transmission.

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 17 Real Time Economic Dispatch Security-constrained, using Full Network Model –Considers all transmission constraints, loop flows, local reliability needs, generator operating constraints, as well as imbalance energy needs. –Same network model as forward markets; no distinction between inter-zonal and intra-zonal congestion. Produces real-time 10-minute nodal prices –Congestion costs implicit in nodal price differences –Generators settle at nodal prices –Real-time load deviations may settle at nodal prices or aggregation levels (demand zones)

California Independent System Operator CREPC CA ISO-FERC SMD April 30, 2002, page 18 Process Going Forward May 1, 2002 – CA ISO files MD02 proposal at FERC, including tariff language for October 1, 2002, elements. June 15, 2002 – CA ISO files balance of proposed tariff language at FERC – long-term elements. July 1, 2002 – FERC rules on elements of MD02 proposed to be in place on October 1, 2002, when West-wide mitigation terminates. Fall, 2002 – FERC rules on long-term elements of MD02, including ACAP, LMP, etc. Spring, 2003 – CA ISO implements second phase of redesign proposal, including integrated forward-market congestion management, energy and AS market (zonal). Fall, 2003 – CA ISO implements final phase of MD02 – full LMP model implemented.