doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 1 WG11 Snapshot July ‘09 Date: Authors:
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 2 WG11 Task & Study Group Officers Project Complete Except for Publication GroupChairVice ChairTechnical Editor Secretary NBruce KraemerSheung LiAdrian StephensJon Rosdahl WJesse WalkernoneNancy Cam-Wingetnone TGn PAR expires Dec 31, 2009 TGw PAR expires Dec 31, 2009
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 3 WG11 Task & Study Group Officers CatGroupChairVice ChairTechnical Editor Secretary WGWG11Bruce KraemerJon Rosdahl Adrian Stephens Terry Cole Stephen McCann TGMbMatthew GastMichael MontemurroAdrian StephensJon Rosdahl TGPLee ArmstrongnoneWayne FisherSusan Dickey TGSDonald EastlakenoneKazuyuki SakodaStephen Rayment TGUStephen McCannnoneNecati CanpolatDave Stephenson TGVDorothy StanleynoneEmily Qi-OPEN- TGZMenzo WentinknoneMenzo WentinkDaniel Borges TGAAGanesh VenkatesanAlex AshleyHang Liu -OPEN- TGACOsama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ--OPEN- TGADEldad PerahiaVinko Erceg, John Barr-NYRQ--OPEN- SCWNGT. K. Tan SCARCDavid Bagby SGTVWSRichard Kennedy SGQoS MAN Michael Montemurro AHJTC1Andrew Myles AHREGRichard Kennedy NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 4 September - WG11 Task & Study Group Officers CatGroupChairVice ChairTechnical Editor Secretary WGWG11Bruce KraemerJon Rosdahl Adrian Stephens Terry Cole Adrian Stephens Stephen McCann TGMbMatthew GastMichael MontemurroAdrian StephensJon Rosdahl TGPLee ArmstrongnoneWayne FisherSusan Dickey TGSGuido HertznoneKazuyuki SakodaStephen Rayment TGUStephen McCannnoneNecati CanpolatDave Stephenson TGVDorothy StanleynoneEmily QiDorothy Stanley TGZMenzo WentinknoneMenzo WentinkDaniel Borges TGAAGanesh VenkatesanAlex AshleyHang Liu -OPEN- TGACOsama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ--OPEN- TGADEldad PerahiaVinko Erceg, John Barr-NYRQ--OPEN- SCWNGStephen McCann SCARCDavid Bagby SGTVWSRichard Kennedy SGQoS MAN Michael Montemurro AHJTC1Andrew Myles AHREGRichard Kennedy NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 5 Publicity & Timeline – September 2009 Publicity –IEEE-SA issued IEEE n Press release (14 Sept) from IEEE 802 Exec. –IEEE working on IEEE w Press release Timeline –Updated letter ballot information for 11p, 11u, 11v and 11z –Updated sponsor ballot information and approval dates for 11n and 11w.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 6 WG11 Editor Abstract / Agenda – Sep 2009 Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots RevCom preparation process discussion Conference Calls
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 7 WNG SC – Meeting Goals September 09 Review WNG SC Plans Known Presentations –Broadband V2I Access for High Speed Transportation – Morioka –Another
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 8Bruce Kraemer (Marvell)Slide 8 IEEE ARC SC – Sept 2009 ARC activities were altered to an “as needed basis” in July 2009 Conference calls since last session –Two call times were pre-scheduled, neither was needed. This week –No F2F session scheduled
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 9 TGmb September 2009 Summary Status –LB 149: 87% approval; 730 comments received (see 11-09/0706r2) –D1.03 in members area, incorporates approved resolutions 9 ad hoc groups processing comments –General, Editorial, Security, MAC operation, MAC management, framing and architecture, SAP, PHY and regulatory, and MIB Some comments have been identified as potentially wide-ranging, and have scheduled discussions on the agenda (11-09/0941) –Changes to frame transition state diagram – scheduled for discussion in the next meeting slot (Monday AM2) –New cipher suite proposal (Thursday AM1) –MIB variable discussion based on ARC recommendation Target is to go to letter ballot in November, with stretch goal of September (this meeting)
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 10 IEEE n – September 2009 Requested approval from EC in July to submit to Standards board for approval and publication Request approved by RevCom Sept 10 and Standards Board Sept 11 Goals –Sit on the Waikoloa beach –Prepare for publication (mid October) TGn meeting report is submission 11-09/0991
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 11 September 2009 Slide 11 TGp Snapshot for September2009 LB 154 passed 163 affirmative votes 20 negative votes 28 abstention votes ==== 211 votes received 39 comments, most of which have been withdrawn of 18 remaining, all but one are resolved Will complete comment resolutions this week, hopefully with sponsor ballot starting before November
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 12 September s Mesh Networking Donald Eastlake cannot attend – Guido Hertz agreed to chair for September – nominations open TGs Draft 3.0 passed LB#147 with 79% approval and 1,195 comments. The current comment resolution spread sheet is /471r13. 53% of LB#147 comments were resolved by the end of the May meeting and 72% by the end of the July meeting. The current TGs draft is D3.03. TGs draft agenda is in submission 11-09/913r4. All of its Waikoloa meetings are in the Queen’s 4 Room.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 13 IEEE u – September 2009 Review of Teleconferences LB 156 Re-circulation Comment Resolution 93% approval, 24 tech’, 44 edit’ comments –1 new negative vote –Possible re-circulation letter ballot at end of meeting – u-lb156-comment-spreadsheet.xls Liaisons Agenda in document r1
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 14 IEEE v – September 2009 LB155 Passed (91.67%), 24 comments received Held 1 con calls since July 2009 session –Notes in –Comments in This week –Complete LB 155 Comment Resolution –Recirculation Letter Ballot –Prepare for Sponsor Ballot Agenda in document
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 15 TGw September Meeting Status & Objectives Requested approval from EC in July to submit to Standards board for approval and publication Request approved by RevCom Sept 10 and Standards Board Sept 11 Goals –Sit on the beach (in Portland) – Prepare for publication (mid October)
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 16 IEEE z – September 2009 Hawaii Meeting The goal for TGz this meeting is to resolve the comments received on LB157 –LB157 passed with 96% approval rate –No new disapprove votes –2 technical comments, 25 editorial comments received TGz has 4 timeslots this week to work on comment resolution
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 17Bruce Kraemer (Marvell)Slide 17 IEEE aa – Waikoloa, HI (Sept, 2009) Since the San Francisco, CA session: TGaa had 3 Teleconferences focused on: OBSS discussions – Refinements to information shared across BSS Input to 802.1Qat – Designated MSRP Node/AP interaction for stream reservation and TSPEC mapping TGaa will not be meeting in Waikoloa
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 18 September 2009 Bruce Kraemer (Marvell)Slide 18 IEEE ac – September 2009 Continue the work on the TG documents –09-059r4 is the baseline document for the selection procedure. – r2 is the baseline document for the usage models. –09-308r6 is the baseline document for the channel models addendum. –09-451r7 is the baseline document for functional requirements and evaluation methodology Technical contributions Agenda in document r0
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 19 TGad – Meeting Goals Continue working on task group documents Technical contributions Joint meeting with c on Wed PM2
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 20 September 2009 Slide 20 TVWS SG – Meeting Goals September 09 Review and approve teleconference minutes Review TVWS SG Plans –Study Group rules –The approved Motion –The schedule Review, edit and approve PAR and 5 Criteria Plan for Atlanta
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 21 QoS MAN September 2009 Summary Election of Study Group Officers Prepare PAR and 5C document –Initial draft is posted as 00qm-qosman-par-nescom-form-plus-5cs.doc 00qm-qosman-par-nescom-form-plus-5cs.doc Vote to approve PAR and 5C Revise plan of record.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 22 JTC1 Ad Hoc September Meeting Status Review purpose of JTC1 ad hoc –Review status of WAPI in ISO/IEC JTC1, IETF and BWIPS –Discuss goals of JTC1 ad hoc’s consideration of WAPI –Discuss next steps for JTC1 ad hoc’s consideration of WAPI –Call for volunteers to represent IEEE 802 at next JTC1/SC6 meeting –Discuss any suggested changes by the IEEE WG to the PSDO agreement between IEEE and ISO
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 23 Regulatory Ad Hoc Committee Meeting Goals September 09 The regulatory summaries –North America –European Union –Asia Regulatory issues status –EN v1.8.1 –TVWS database –EU Digital Dividend –SE24 and SE21 workitems Critical issues actions –EN –MBAN NPRM Bruce Kraemer (Marvell)Slide 23
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 24
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 25 LB154 "Should P802.11p D8.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Tuesday July 21, :59 ET Ballot Closing Date: Wednesday Aug 05, :59 ET RESPONSE RATE: 232 eligible people are in this ballot group. 163 affirmative votes 20 negative votes 28 abstention votes === 211 votes received = 90.95% valid returns = 13.27% valid abstentions APPROVAL RATE: 163 affirmative votes = % affirmative 20 total negative votes = % negative The 75% affirmation requirement has been met, Motion passes. There were 38 comments received..
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 26 LB155 "Should P802.11v D7.0 be forwarded to Sponsor Ballot?". Ballot Opening Date: Thursday July 23, :59 ET Ballot Closing Date: Friday Aug 07, :59 ET RESPONSE RATE: 254 eligible people are in this ballot group. 176 affirmative votes 16 negative votes 38 abstention votes === 230 votes received = 90.55% valid returns = 16.52% valid abstentions APPROVAL RATE: 176 affirmative votes = % affirmative 16 total negative votes = % negative The 75% affirmation requirement has been met, Motion passes. There were 24 comments received.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 27 LB156 “Should P802.11u D8.0 be forwarded to Sponsor Ballot?" Ballot Opening Date: Friday July 31, :59 ET Ballot Closing Date: Tuesday Aug 18, :59 ET RESPONSE RATE: 213 eligible people are in this ballot group. 148 affirmative votes 11 negative votes 35 abstention votes === 194 votes received = 91.08% valid returns = 18.04% valid abstentions APPROVAL RATE: 148 affirmative votes = % affirmative 11 total negative votes = % negative The 75% affirmation requirement has been met, Motion passes. There were 68 comments received.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 28 LB157 “Should P802.11z D6.0 be forwarded to Sponsor Ballot?" Ballot Opening Date: Tuesday Aug 11, :59 ET Ballot Closing Date: Wednesday Aug 26, :59 ET RESPONSE RATE: 254 eligible people are in this ballot group. 187 affirmative votes 8 negative votes 38 abstention votes === 233 votes received = 91.73% valid returns = 16.31% valid abstentions APPROVAL RATE: 187 affirmative votes = % affirmative 8 total negative votes = % negative The 75% affirmation requirement has been met, Motion passes. There were 29 comments received.
doc.: IEEE /0990r1 Submission September 2009 Bruce Kraemer (Marvell)Slide 29 IEEE Standards Pipeline PHY Sponsor Ballot MAC Study groups k RRM r Fast Roam b (’99) 11 Mbps 2.4GHz Published Standard a 54 Mbps 5GHz g 54 Mbps 2.4GHz e QoS i Security f Inter AP h DFS & TPC V Network Management s Mesh Security u WIEN Y Contention Based Protocol TG Letter Ballot mb Maintenance k+r+y aa Video Transport ac VHT 5GHz ad VHT 60GHz TG without draft Discussion Topics Published Amendment Low Power Smart Grid QoS Mgmt Frm n High Throughput (>100 Mbps) W Management Frame Security z TDLS p WAVE TVWS Sponsor Ballot pool formation open until October 1