1 SPDG Jennifer Coffey 323A State Personnel Development Grants SPDG Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office.

Slides:



Advertisements
Similar presentations
Management Plans: A Roadmap to Successful Implementation
Advertisements

Campus Improvement Plans
High-Quality Supplemental Educational Services And After-School Partnerships Demonstration Program (CFDA Number: ) CLOSING DATE: August 12, 2008.
Final Determinations. Secretary’s Determinations Secretary annually reviews the APR and, based on the information provided in the report, information.
Sam Lopez, NPD Program Manager, OELA
Enhancing Education Through Technology Round 9 Competitive.
Office of Special Education Programs U.S. Department of Education With thanks to NECTAC & Christy Kavulic GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING.
COLLEGE SPARK WASHINGTON 2012 Community Grants Program Application Webinar 12/22/201110:00 AM 1/4/20122:00 PM.
SAISD Federal Programs Department. Stage 1 of the Organization and Development Process Form the Planning Team 1 2.
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
1 Susan Weigert, Project Officer GSEGs Overview of GSEG Management.
How to Develop a Project Evaluation Plan Pat Gonzalez Office of Special Education Programs
325K: Combined Priority for Personnel Preparation Webinar on the Annual Performance Report for Continuation Funding Office of Special Education Programs.
325D Preparation of Leadership Personnel Webinar on the Annual Performance Report for Continuation Funding Presenter: Patricia Gonzalez, Ph.D. Office.
Social and Behavioral Context for Academic Learning Program Meeting Emily Doolittle Program Officer Sunday, June 7, 2009.
TITLEIIA(3) IMPROVING TEACHER QUALITY COMPETITIVE GRANTS PROGRAM 1.
Final Reports, No-Cost Extensions and Close Outs FY06 ERCM Final Grantee Meeting August 4, 2007, Washington, DC U.S. Department of Education, Office of.
Overview of the SPDG Competition Jennifer Doolittle, Ph.D. 1.
2011 SIGnetwork Regional Meetings Professional Development: the heart of the matter.
1 SPDG Jennifer Coffey 323A State Personnel Development Grants SPDG Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office.
Program Overview Joint grantee meeting for Cognition & Student Learning (CASL) and Education Technology (EdTech) Carol O’DonnellJonathan Levy Program Officer,
12/07/20101 Bidder’s Conference Call: ARRA Early On ® Electronic Enhancement to Individualized Family Service Plans (EE-IFSP) Grant and Climb to the Top.
Karen Seay PARENTAL INVOLVEMENT 101 – Writing a compliant policy and compact We’re all in this together:  State Department of Education 
Creating Pathways for Education, Career and Life Success Webinar: Developing a Pathways Plan January 18, 2013 Facilitated by Jeff Fantine, Consultant.
School Improvement Planning and Reporting for Cohort 2 and Cohort 3 Schools June 8, 2015June 8, 2015.
IES Statistical and Research Methodology in Education Grant Program (84.305D) 2010 Program Meeting.
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING FY 2009.
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING FY 2011.
1. Housekeeping Items June 8 th and 9 th put on calendar for 2 nd round of Iowa Core ***Shenandoah participants*** Module 6 training on March 24 th will.
ANNUAL AND FINAL PERFORMANCE REPORTS 524B FORM REPORTING PERIOD BUDGET EXPENDITURES INDIRECT COST RATE PERFORMANCE MEASURES.
2011 SIGnetwork Regional Meetings Professional Development: the heart of the matter.
SIG Day 2009 Jennifer Doolittle OSEP July 20, 2009.
APR Know-how Jennifer Coffey November 2013 The Revised SPDG Program Measures and Other Reporting Requirements.
Why Do State and Federal Programs Require a Needs Assessment?
Completing the PIRC 2010 Annual Performance Report Parental Information and Resource Center Technical Assistance Webinar April 13, 2010 United States Department.
What is Expected in Updating Your SIP? Metro-Nashville Public School System School Improvement Plan Process September 2008.
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING.
Program Measure Review – Considerations for the APR  Jennifer Coffey, PhD, OSEP Program Lead 1 “Continuous improvement is better than delayed perfection.”
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING.
Welcome to today’s Webinar: Tier III Schools in Improvement We will begin at 9:00 AM.
Project Design Jennifer Coffey OSEP May 4,
Moving Title IA School Plans into Indistar ESEA Odyssey Summer 2015 Presented by Melinda Bessner Oregon Department of Education.
Enhancing Education Through Technology Round 8 Competitive.
Tuesday, April 12 th 2011 SPDG Performance Measure Discussion.
Title III Native American and Alaska Native Children in School Program Grantee Performance Reporting June 19, 2014 Prepared under the Data Quality Initiative.
ANNUAL AND FINAL PERFORMANCE REPORTS 524B FORM REPORTING PERIOD BUDGET EXPENDITURES INDIRECT COST RATE PERFORMANCE MEASURES.
1 SPDG Jennifer Coffey 323A State Personnel Development Grants SPDG Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office.
NH Department of Education Developing the School Improvement Plan Required by NH RSA 193-H and Federal Public Law for Schools in Need of Improvement.
1 DEMONSTRATION PROJECTS TO ENSURE STUDENTS WITH DISABILITIES RECEIVE A QUALITY HIGHER EDUCATION PROGRAM Performance Measurement, Program and Project Evaluation.
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING FY 2015.
1 Jennifer Coffey 323A State Personnel Development Grants Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office of Special.
Dial-in: Pass code: SPDG Grant Management PLC Webinar 524b SPDG Annual Performance Reporting 101: How to efficiently and effectively.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING FY 2013 Office of Special Education Programs U.S. Department of Education.
Note: In 2009, this survey replaced the NCA/Baldrige Quality Standards Assessment that was administered from Also, 2010 was the first time.
PERSONNEL DEVELOPMENT PROGRAM Webinar for 325D and 325K Grantees Completing the ED Grant Performance Report (ED 524B) for the Annual Performance.
325K: COMBINED PRIORITY FOR PERSONNEL PREPARATION Webinar on the Annual Performance Report for Continuation Funding Office of Special Education Programs.
325D: PREPARATION OF LEADERSHIP PERSONNEL Webinar on Project Objective and Performance Measures for the Annual Performance Report for Continuation Funding.
Educational Technology, Media, and Materials
With Parent Centers December 15, 2016
American Institutes for Research
2018 OSEP Project Directors’ Conference
ANNUAL PERFORMANCE REPORTS
Overview of Updated Proposal and Reporting Guidelines
Grantee Guide to Project Performance Measurement
Office of Special Education Programs U.S. Department of Education
323A State Personnel Development Grants SPDG Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office of Special Education.
Assessing Academic Programs at IPFW
APR Informational Webinar
PROJECT PERFORMANCE MEASURES
Presentation transcript:

1 SPDG Jennifer Coffey 323A State Personnel Development Grants SPDG Webinar on Grant Performance Report for Continuation Funding Jennifer Coffey Office of Special Education Programs US Department of Education Washington, DC January 2015

2 Today’s Agenda Today’s Topic – Grant Performance Report for Continuation Funding   Overview of Performance Reporting   Developing Performance Measures   Completing Section A of the ED 524B   Completing Sections B&C of the ED 524B Program Measure 1 – Revised Guidance Documents Evidence-based Professional Development (EB-PD) Rubric EB-PD Worksheet

O S E P Annual Grant Performance Report (APR)   An annual report of your activities and performance in meeting the approved objectives of the project and responsible use of federal funds   Required for all active grants, including those in no cost extension (NCE)   OSEP reviews the report to determine if substantial progress has been made in order to receive continued funding or a NCE 3

O S E P Requesting a no-cost extension (NCE) On the Grants Management page ( Requesting No-cost extensions At the time the no-cost extension is requested, about 30 days before the end of the grant (must be before 10 days prior to the last day of the performance period), the Project Officer will need an updated continuation report ed to them. The Project Officer will also need to know: (1) the amount the grantee has remaining in their budget, (2) the activities the grantee wants to continue to conduct that align with approved objectives, (3) how much of the budget will be used for each activity, and (4) why the grantee was not able to spend the entire budget within 5 years. NCE Reporting FormNCE Reporting Form, This is the form OSEP provides to states to capture information about the no cost extension (NCE). NCE Reporting Form 4

O S E P Overview   Recognize strong project objectives that can be associated with high quality performance measures   Develop relevant, measurable, outcome oriented performance measures related to your objectives that maximize the potential for meaningful data reporting and positive outcomes   Complete the ED Grant Performance Report (aka. APR) using form ED 524B. 5

O S E P Why Is This Important? High quality objectives and measures …   Make it easier for you to measure your progress for the purpose of grant management   Allow you to report progress easily and quantitatively   Establish targets (both short-term/annual & long- term)   Allow OSEP staff to gather evidence of program effectiveness Taken from the Center for Evaluation and Education Policy (CEEP) presentation at 6

O S E P Goal – Objectives - Measures 7 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P Project Objectives What are you trying to accomplish? Objectives should answer this question. Preferred format for objectives: Begin the objective with a verb and define a desired outcome or condition 8

O S E P High Quality Project Objectives   Relevance How relevant is the project objective to the overall goal of the program and/or the goal of your project?   Applicability How applicable is the project objective to the specific activities that are being conducted through your particular project? 9 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P High Quality Project Objectives   Focus How focused is the project objective?   Measurability Are there concepts in the project objective that lend themselves to measurement? If so, is measurement feasible? Taken from the Center for Evaluation and Education Policy (CEEP) presentation at 10

O S E P Project Objectives -- Examples Increase the meaningful participation of families in the RtI/PBIS processes in participating LEAs.Increase the meaningful participation of families in the RtI/PBIS processes in participating LEAs. Improve the academic and behavioral outcomes of students with autism in participating schools.Improve the academic and behavioral outcomes of students with autism in participating schools.

O S E P Performance Measures How are you measuring your progress in meeting your objectives? Performance measures should answer this question. 12

O S E P Performance Measures   Measurable indicator used to determine how well objectives are being met.   How will progress be assessed?   How much progress will constitute success?   How will it be known if an objective or part of an objective has been achieved? Taken from the Center for Evaluation and Education Policy (CEEP) presentation at 13

O S E P Performance Measures 14 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P 2 Types of Performance Measures   Program All grantees funded under the SPDG must report on the PDP program performance measures established by OSEP.   Project Each grantee reports on the approved project performance measures established to meet their project objectives. 15

O S E P Program Performance Measures   Program Measures established by OSEP for the SPDGs. Measures apply to all grants funded under the SPDG. Results on these measures are reported to Congress under the Government Performance and Results Act of Program Measures Webinar: Please see the Program Measures Web page for more information and recorded Webinars: 16

O S E P Types of Performance Measures   Project Measures that the grantee establishes to meet their project objectives   Project performance measures can address both the process of working towards an objective and the outcome related to meeting the objective   Ensure a mix of both process and outcome measures, but most will be outcome Taken from the Center for Evaluation and Education Policy (CEEP) presentation at 17

O S E P High Quality Performance Measures High quality performance measures show   What will change   How much change you expect   Who will achieve the change   When the change will take place 18 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P Project Performance Measure Examples Process measure (e.g.) - SPDG staff (who) will hold 4 (how much) trainings with IHE faculty on how to integrate the transition curriculum into their syllabi (what ) during the first and third years of the grant (when). 19

O S E P Project Performance Measure Examples Outcome measure (e.g.) - By the end of the third year of the grant (when), 80% of SPDG professional development participants (who) will demonstrate 100% reliability (how much) when using the self- assessment rubric established to evaluate implementation of the transition program (what). 20

O S E P Project Performance Measure Examples Outcome measure (e.g.) - At the end of their third year of training (when), 90% (how much) of partner schools (who) will demonstrate a 15% improvement in the math scores of 4 th grade students (what). 21

O S E P Common Problems   Activities are NOT performance measures   If the best response is “Yes, we did that,” it is likely an activity (not a performance measure)   Activities:   Establish a stakeholder group   Hold an advisory board meeting   Evaluate the project 22 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P Common Problems   Performance measures need to be measurable   Examples with measurement problems (activities rather than outcomes)   Will maintain collaborative partnerships with parent organizations   Increase the sustainability of the personnel development program 23 Taken from the Center for Evaluation and Education Policy (CEEP) presentation at

O S E P Need additional information on writing performance measures?   All grantees are strongly encouraged to seek training on writing performance measures.   For further information on developing performance measures and logic models, see

O S E P Summary   Projects should have a few clear objectives that explain what the project is doing to support the overall goal(s)   Each objective should have a few, specific performance measures to demonstrate how progress toward meeting the objective will be measured   Both program and project performance measures are included in the ED524B 25

O S E P Completing the ED 524B The ED 524B is a required reporting form with specific instructions.   The form is used by all ED grants and has been approved by the Office of Management and Budget (OMB). Project Directors must follow the directions listed in the Dear Colleague letter and ED 524B Instructions provided by OSEP.   Word or PDF versions of the forms are available at 26

O S E P x 27 X

O S E P Reporting Period: For first year grants, the date is the beginning of the project year to For grants in years 2-4, it is the date from the end of the previous reporting period to ANNUAL PERFORMANCE REPORTS

O S E P ANNUAL PERFORMANCE REPORTS Budget Expenditures: Report the expenditures during the “Reporting Period.” Must be data or information from the business or grants office. 29

O S E P Signatory must have authority to sign on behalf of the institution since the grant is from the Department to the institution and not to an individual. The Authorized Representative signs; not the Project Director. Performance Measure Status: This will be checked “No” since OSEP is asking for data for the reporting period covering all years of the grant, not for this budget period. The date entered here will be the due date for your Final Performance Report; which is 90 days after the end of the grant. ANNUAL PERFORMANCE REPORTS 30

O S E P EXECUTIVE SUMMARY SHEET 31 OMB No Exp. 02/28/2011 OMB No Exp. 02/28/2011 *** Provide highlights of the project's activities and the extent to which the expected outcomes and performance measures were achieved during the reporting period. Do NOT include the project abstract. H323A

O S E P PROJECT STATUS CHART 32 H323A

O S E P You will begin with Program Measure 1 as your 1 st project objective. Program Measure 2 will be your 2 nd objective, and so on. After these program measures, you will then have your project’s objectives. PROJECT STATUS CHART 33 H325T

O S E P Here you identify if the performance measure is a PROGRAM measure, “PRGM,” or a PROJECT measure, “PROJ.” Note: Program measure refers to one of OSEP’s 4 program/GPRA measures for the SPDGs. Project measures are unique to your grant. PROJECT STATUS CHART 34 PRGM PROJ

O S E P PROJECT STATUS CHART QUANTITATIVE DATA 35 Depending on your measure, enter either a raw number, or a ratio and percentage. Enter the target number identified in the performance measure and then the actual data for this year. If complete data are not available for the measure, enter “999” (if no baseline) or “NA” in the “Raw Number” or “%” column, as appropriate. Provide an explanation at the bottom of the page under “Explanation of Progress.”

O S E P Information to Include in the Explanation of Progress Section   Describe the data provided (e.g., what data collection methods were used, when were the data collected, how was a sample drawn, are there missing/incomplete data, what was the response rate, was a reliability measure taken). Your Project Officer should be able to understand and interpret the number in the chart from your description in this section.   What changes in the data occurred since last APR (i.e., trend)?   What activities were undertaken to achieve the targets?   If targets were not met, what are possible reasons?   How will activities that failed to meet targets be improved? 36

O S E P Additionally… A “template” is provided for the program measure descriptions in the Program Measure Example Continuation Report ( 5) Program Measure Example Continuation ReportProgram Measure Example Continuation Report 37

O S E P QUALITATIVE DATA If measure requires the collection of qualitative data, report the performance measure and type (PROG or PROJ) and then, enter “N/A” under the Raw Number and Percentage columns. N/A In the “Explanation of Progress” section of the page, referencing the performance measure by number, report applicable qualitative data along with other information about how these data were collected, targets and activities –refer to previous slide for additional content requirements. PROJECT STATUS CHART 38

O S E P Final Page of the Report Section B: Refer to the instructions for Section B in the ED 524B Instructions Section C: Include additional information (recruitment material, syllabi, evaluation instruments, journal articles) 39 H

O S E P Section B – Budget Information This section is never blank! A table can be helpful!   Provide actual expenditures for this reporting period (through 2/29/2012)   Estimate anticipated expenditures for the rest of this budget period and balance remaining, if any.   Explain why you did not expend funds at the expected rate.   Indicate how you plan to use the unexpended funds (carryover) in the next budget period. 40

O S E P Section B – Budget Information   Describe any significant changes to your budget resulting from modifications of project activities.   Describe any changes to your budget that affect your ability to achieve your approved project activities and/or project objectives.   Describe any anticipated changes in your budget for the next budget period that require prior approval from the Department. Any questions … Talk to your Project Officer 41

O S E P Section C – Additional Information   Provide a list of current partners on your grant and indicate if:   Any partners changed during the reporting period. If there were changes, please describe both the changes and any impact that resulted in your ability to achieve approved project objectives and/or project activities.   Any partners are anticipated to change during the next budget period. If so, please describe both the changes and any impact the change might have on your ability to achieve approved project objectives and/or project activities.   Describe any changes that you wish to make in the grant’s activities for the next budget period that are consistent with the scope and objectives of your approved application. 42

O S E P Section C – Additional Information   If requesting changes to the approved Project Director and/or other key personnel, please include the person’s name, title, and contact information. Indicate his/her proposed start date, and percentage of time working on the grant, and attach a resume or curriculum vitae to the annual performance report being submitted.   Do not report on any key personnel changes that were already made during the current or previous budget period(s).   Note: Departmental approval must be requested and received prior to making key personnel changes.   Provide any other information about your project including unanticipated outcomes or benefits 43

O S E P Submitting the ED 524B 44  Submit the ED 524B at  Instructions for using G5 are in the continuation packet.  Signed ED 524B Cover Sheet must be scanned and ed in PDF format to your Project Officer.  Special cases require regular submission of the 524B and signed cover sheet in PDF format to your Project Officer rather than submission through G5 –  Final Performance Reports or APRs for grants in their last performance period, or no-cost extension  Grants that have been front-loaded (forward-funded) last year sometimes cannot be uploaded.

O S E P Exemplar APR 45

O S E P THE REVISED PROGRAM MEASURE 1 FORM AND GUIDANCE Program Measures Web page: s/205 s/205 s/20546

SPDG Professional Development Rubric  5 Domains, each with components  Selection  Training  Coaching  Performance Assessment/Data-based decision making  Facilitative administration/Systems intervention  Components from the National Implementation Research Network, Learning Forward (NSDC), Guskey, Trivette  Each component of the domains will be rated from

Component Themes  Assigning responsibility for major professional development functions (e.g., measuring fidelity and outcomes; monitoring coaching quality)  Expectations stated for all roles and responsibilities (e.g., PD participants, trainers, coaches, school & district administrators)  Data for each stage of PD (e.g., selection, training, implementation, coaching, outcomes)48

SPDG Initiatives and Evidence-based Professional Development  Each initiative you are reporting on should have its own worksheet.  You will only receive credit for work you have already done.  Just lay out the program measure target and data for the current year (do not provide multiple years’ targets for the same initiative).49

Grantee Benchmarks  1 st year of funding: baseline  2 nd yr: 50% of components will have a score of 3 or 4  3 rd yr: 70% of components will have a score of 3 or 4  4 th yr: 80% of components will have a score of 3 or 4  5 th yr: 80% of components will have a score of 3 or 4 (maintenance yr)50

Revisions to the Worksheet and Rubric  Expectations more clearly defined.  Should assist both reporting and evaluation of your reporting.  All of SIGnetwork was given an opportunity to comment on the Worksheet changes.  Please let John or Jennifer know if you have a recommended change to the rubric. 51

Why components received a score of 1 or 2  Activities had not been completed.  Activities described were in the planning stage (the description included information about activities that will take place in the future). 52

The Description was Incomplete  The description was vague and did not have enough detail to determine what activities had been completed.  Required element descriptions were superficial and lacked sufficient detail.  The description did not include information on all of the professional development component elements.  The description merely repeated the expectations in the rubric for the professional development component. 53

The description was not specific to the professional development component.  The description was detailed, but not appropriate for the professional development component (e.g., the state provided a detailed description that did not match the component and did not include required elements).  The description was unrelated to the component and required elements.  The grantee used the same narrative to describe activities related to multiple professional development components. 54

Please contact your OSEP Project Officer with any questions about your APR. 55