1 SUPPORT SERVICES. 2 Program planning and marketing occur during the initial stages of a successful operation, but the execution phase is equally as.

Slides:



Advertisements
Similar presentations
TFPAI Training: Technology Facilitators
Advertisements

ODOT- Office of Environmental Services. How to plan and implement effective Public Involvement Meetings.
Tips to a Successful Monitoring Visit
Low-Cost Private Schools Knowledge Framework Research methodology template.
More CMM Part Two : Details.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
Project Management.
Network Redesign and Palette 2.0. The Mission of GCIS* Provide all of our users optimal access to GCC’s technology resources. *(GCC Information Services:
PROVIDE ARRIVAL AND DEPARTURE ASSISTANCE
School Name Here 2010 NECAP Science Test Administrator Workshop.
Classroom Observation Training. Instructional Activities to be observed include but may not be limited to….. Classroom instruction Laboratory and clinical.
Network Redesign and Palette 2.0. The Mission of GCIS* Provide all of our users optimal access to GCC’s technology resources. *(GCC Information Services:
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Chapter 10 Training for Organizations Training Administration.
Technology Lab Management Strategies Who do I see? Staff Members – Sign up with the Media Specialist to use room. Community Members – Sign up the.
Lecture 11 Information Systems Training (Chapter 11)
© The Association of Independent Schools of NSW Preparing for the ASQA Audit.
Equal Access: Universal Design of Engineering Labs A checklist to guide faculty & administrators in making their engineering department and labs more welcoming.
Chapter 11 OFFICE MANAGEMENT.
TIPS FOR COMPLETING PERFORMANCE EVALUATIONS FOR HOURLY EMPLOYEES
Educational Activities Akinori Nishihara IEEE Region 10 EAC Chair.
GaCounts: Standard CEU Programs February 4 & 25, 2009 Marcie Simpson Accountability Coordinator.
Standard Toolkit for Learning Centers Hosting Guide – Managing Logistics of Visits MABS Learning Centers Training-Workshop.
Release & Deployment ITIL Version 3
May 29, 2002 BUSINESS SERVICES GOALS AND OBJECTIVES
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
© Copyright 2014 Milady, a part of Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible.
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Technology Access In Post-Secondary Education Ron Stewart Managing Consultant AltFormat Solutions LLC.
OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring and Reporting 2009 CSP Grant OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring.
CONDUCT A NIGHT AUDIT D1.HFO.CL2.06
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
111 © 2001, Cisco Systems, Inc. All rights reserved. Presentation_ID.
Classroom observation. Instructional Activities to be observed include but may not be limited to….. Classroom instruction Laboratory and clinical instruction.
CONFERENCE EVALUATION ADMINISTRATION OF SURVEYS & INTERVIEWS.
Design of Instructional Materials. Introduction Create a video of the program coordinator introducing the college program to non- traditional prospective.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
Accounting for a Service Business Unit 1.3 Transactions.
Principals Management Development Programme JET KZN PMDP - Progress Report: April 2013.
Informational Update Student Success Fee Funded Project Status Emerging Technologies & Instructional Technologies Committees IT Governance Executive Committee.
Classroom Technologies Transition Planning for IT Services and Media Services.
Welcome to the Freedom Park School Volunteer Training Workshop.
© The Scout Association Module 27 Page: 1 of 8 Cambridgeshire Module 27 Instructing Practical Skills Session 1.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
MAP TRAINER MEETING D&S DIVERSIFIED TECHNOLOGIES OCTOBER 2015.
Standard III Resources Effective Practices in Accreditation ASCCC Accreditation Institute, Feb , San Diego, CA Cheryl Aschenbach, ASCCC At-large.
ICT Facilities in State Secondary Schools. This Presentation Computer Labs Software Lab availability Network Login Internet Connectivity Filtering .
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
SOCCCD Collaborative CTE Grant Funded Externship Thu Nguyen Acting Project Director-TPP Counselor Irvine Valley College.
Delivering the Milestones Evaluation: Structuring Feedback & Comments from the CCC Dr. Eric Beachy, MD, Dr. Manju Thothala, MD, Dr. Nicole McGuire, DHSc.
Preparing a College Event for Career Technical Education With Executive Director Kathy Johnson “Vital Link” Elizabeth Weiss Irvine Valley College Acting.
Welcome to the Freedom Park School Volunteer Training Workshop
San Pedro High School Back - to - School Night Welcome to Room 228A
Accreditation of study program at the Faculty of Information Technologies Tempus SMGR BE ESABIH EU standards for accreditation of study.
San Pedro High School Back - to – School Night Welcome to Room 149
The NEW Distance Education Guidelines
DRAFT Standards for the Accreditation of e-Learning Programs
Clinical Engineering Lecture (3).
UNIT V QUALITY SYSTEMS.
San Pedro High School Back - to – School Night Welcome to Room B - 7
Training for New District Test Coordinators
Free Study Material Provide Dumps4download.co.in
Campus Resource Scheduling & Event Management
OPM Contracting Officer
Currituck County Schools
ISO 9001:2000 Management System Overview
GSA Task 7 Begin Guest check-in
Technology Maintenance
Presentation transcript:

1 SUPPORT SERVICES

2 Program planning and marketing occur during the initial stages of a successful operation, but the execution phase is equally as important.

3 The execution phase is heavily dependent on the support staff and well designed policies and procedures.

4 SUPPORT SERVICES INCLUDE Registration Customer Correspondence Purchasing Accounting Materials Preparation Customer Relations Record Keeping

5 Registration Providing additional information about the activity that supplements the descriptions in the brochure  Marketing related activities  Collecting data for current and future needs (Tracking)  Building relationships  Collecting names and vital information

6 Three important elements of the Continuing Education registration process are:  Method  Place  Time

7 Place  The CE Location  At the home/workplace  At the educational activity

8 Time  Any time  Office hours  Scheduled times

9 Another critical element of the registration process is feedback: Confirmation of:  Time  Location  Dates  Maps

10 The registration process is complete only after the participant is comfortably seated in the classroom.

11 The manner in which the participant is welcomed at the location and processed affects the participants readiness to learn.

12 What can you do to assure a positive experience upon participant’s arrival? Place signs in strategic locations Have someone greet the participants Provide adequate parking Provide a “safe” environment

13 Student Services  A toll free number  The purchase and delivery of books  An interactive web page  Customer-friendly policies and procedures

14 Faculty Services Copy service (reproduction of materials) Room set-up Media (i.e., projector, TV, VCR, computer, screen) Classroom management issues Training in new educational technologies Teaching methods

15 Records  CEU – The continuing education unit  The CEU is a measure of participation and satisfactory completion of a continuing education activity.  1 CEU represents 10 hours of instruction  1 Hour of training is.1 CEU

16 Criteria for establishing the CEU based on the International Association for Continuing Education and Training.

17 Other Support Services  Marketing  Financial  Materials  Production  Facility Set-Up  Maintenance