Slide 1 Flexibility for in-Space Propulsion Technology Investment Jonathan Battat ESD.71 Engineering Systems Analysis for Design Application Portfolio.

Slides:



Advertisements
Similar presentations
New Product & Service Development Process
Advertisements

Power Plant Development Options in Abu Dhabi Application Portfolio ESD.71 Engineering Systems Analysis for Design Kyle Frazier December 2007.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
6 The Manager as a Decision Maker.
Chapter 8: Strategy and Analysis Using NPV
Richard de Neufville © Michael Benouaich Slide 1 of 16 Massachusetts Institute of Technology Engineering System Analysis for Design Valuation with Simulation.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Chapter 5.2: Costs of production
Allocating Capital Appropriately - Use of a single-batch process.
Sul Kassicieh Anderson School of Management.   Focus your thinking  Establish realistic strategy – operating company on paper  Financing and other.
Tools used by Entrepreneurs for Venture Planning
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 19 Use of Simulation.
MARCH 2015 BUILDING A RISK-AWARE BOARD Aristides Protopapadakis, CEO Systemic Solutions.
Value of Flexibility an introduction using a spreadsheet analysis of a multi-story parking garage Tao Wang and Richard de Neufville.
UNDERSTANDING VALUE THROUGH VISUAL QUADRANT ANALYSIS BY ELIZABETH BOETTCHER, RED BRICK MARKETING, INC. An Exercise For Small Business Owners.
UTSA Colleges of Business and Engineering TAKE YOUR TECHNOLOGY TO THE LIMIT! Rudy W. De La Garza ENTREPRENEUR WEAPONS First Dominion FINANCIAL CITE BootCamp.
One Day Training Programme for Business Trainers and Mentors.
1 Portfolio Management – Agile How to plan like a VP Highsmith, Ch 12 CSSE579 Session 6 Part 2 One company’s software product portfolio.
Market Oriented Strategic Planning How do companies compete successfully in today’s market place? By creating and delivering superior value to target customers.
The Manager as a Decision Maker.
Decision Trees and Influence Diagrams Dr. Ayham Jaaron.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
4.08 Employ sales-promotion activities to inform or remind customers of business/product.
Monte Carlo Simulation and Personal Finance Jacob Foley.
SIMULATION USING CRYSTAL BALL. WHAT CRYSTAL BALL DOES? Crystal ball extends the forecasting capabilities of spreadsheet model and provide the information.
December 9, 2008 ESD.71 Engineering Systems Analysis for Design Term Project-- Real Option Analysis of Cape Wind Project in Massachusetts Prof. Richard.
Training Programme Innovation on SMEs. I NTRODUCTION TO THE D AY Registration/coffee Introduction Module 1: Your Inner Innovator
1 © 2006 Brandon Owens, Engineering Systems Division, Massachusetts Institute of Technology An Engineering Systems Analysis of Space Station Assembly &
The ISECG Global Exploration Roadmap Status update at Target NEO2 Workshop July 9, 2013 NASA/Kathy Laurini Human Exploration & Ops Mission Directorate.
1 Chapter 7 Applying Simulation to Decision Problems.
Navigating the Challenges Nancy Saracino Vice President, General Counsel & Chief Administrative Officer California Independent System Operator Independent.
Engineering Systems Analysis for Design Massachusetts Institute of Technology Richard de Neufville © Hybrid Approach to Valuation Slide 1 of 24 Hybrid.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
ESD.70J Engineering Economy Module - Session 21 ESD.70J Engineering Economy Fall 2009 Session Two Michel-Alexandre Cardin – Prof. Richard.
Example A Market Share Model | 12.2 | 12.3 | 12.4 | 12.5 | 12.6 |12.7 | 12.8 | 12.9 | | | | | | |
Information System Project Management Lecture three Chapter one
CTMS Annual Retreat 2009 “Making connections” Dalia Patino Echeverri, Assistant Professor of Energy Systems and Public Policy Nicholas School of the Environment.
The Augustine Committee Review of Human Spaceflight Plans Committee Briefing to COMSTAC October 29, 2009 Review of US Human Space Flight Plans Committee.
One Day Training Programme for Business Trainers and Mentors.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 17 Use of Simulation.
1 VISSIM Protocol ITE Oregon Traffic Simulation Roundtable May 31, 2012 Chi Mai.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Chapter 11 Principles PrinciplesofCorporateFinance Ninth Edition Project Analysis Slides by Matthew Will Copyright © 2008 by The McGraw-Hill Companies,
10 Project analysis McGraw-Hill/Irwin
Engineering Systems Analysis for Design Massachusetts Institute of Technology Richard de Neufville © Decision Analysis Basics Slide 1 of 21 Calculations.
Teaching slides Chapter 3
Training Programme Innovation on SMEs. I NTRODUCTION TO THE D AY Registration/coffee Introduction Module 1: Your Inner Innovator
1 Agribusiness Library LESSON L060037: DEVELOPING A MARKETING PLAN.
ESD.71 Engineering Systems for Analysis Real Options for Integrating Unmanned Aircraft into the National Airspace System Luke Cropsey 30 November 2007.
Richard de Neufville © Michael Benouaich Slide 1 of 16 Massachusetts Institute of Technology Engineering System Analysis for Design Valuation with Simulation.
Workshop in Financial Engineering “The Stock Game” Dr. J. René Villalobos, Joel Polanco and Marco A. Gutierrez Industrial Engineering Dept. Arizona State.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Entrepreneurial Strategies. A Major Shift... From financial capital to intellectual capital – Human – Structural – Customer.
Strategies for Mature and Declining Markets
Supplementary Chapter B Optimization Models with Uncertainty
NASA Human Exploration Community Workshop on the Global Exploration Roadmap Summary to the FISO Telecon November 30, 2011 NASA/K. Laurini
CSC350: Learning Management Systems
Optimal Learning in the Laboratory Sciences
Project Analysis Slides by Matthew Will.
The ISECG Global Exploration Roadmap Status update at Target NEO2 Workshop July 9, 2013 NASA/Kathy Laurini Human Exploration & Ops Mission Directorate.
Prepared by Katherine Dykes 12/04/2007 ESD 71 – Prof. de Neufville
Richard Blott, Space Enterprise Partnerships Limited
ESD.71 Application Portfolio: Flexibility in the Product Design Process Alison Olechowski 12/09/2010.
Application Portfolio: Fort Carson Solar Project
Mapping your way to Profitability
NASA Technology Roadmaps ATK Commentary
Hybrid Approach to Option Valuation
Presentation transcript:

Slide 1 Flexibility for in-Space Propulsion Technology Investment Jonathan Battat ESD.71 Engineering Systems Analysis for Design Application Portfolio

Slide 2 Background Problems in previous program led to review of human spaceflight. NASA human spaceflight revamped in April New technology required for new exploration goals. There is lots of turmoil and debate among industry and politicians. This leads to uncertainty in the way forward…

Slide 3 Scope of Project 2 in-space propulsion technolgies: Solar Electric Propulsion (SEP) Chemical Propulsion Stage (CPS) 2 exploration destinations: Near-Earth Asteroid (NEA)- current target Mars (NEA develops technology for Mars) 2 design alternatives: 1.A combination of SEP and CPS are used to transport crew and cargo to the NEA. (works for Mars or NEA) 2.Only CPS is used to transport crew and cargo to the NEA. (NEA only) SEP CPS

Slide 4 DRM from HEFT I Closeout Charts In-Space Propulsion Flights NEA Mission Flights This flight timeline was used to setup the simulation Along with the corresponding annual cost estimation

Slide 5 Simulation Setup Assumptions from HEFT I Closeout DRM Costs over time assumed to be correct Precursor flight manifest assumed to be correct (to develop technology readiness) My assumptions SEP is currently at TRL 6 CPS is currently at TRL 7 Each successful precursor flight raises the TRL by 1 There is a 50/50 chance (uncertainty) of each precursor flight being successful Technology Readiness Level (TRL)

Slide 6 Uncertainty of Mission Success According to the # of flights (and my assumption of 1 flight = 1 increase in TRL) both SEP and CPS reach TRL 9 before the NEA campaign in However with a 50/50 chance of each flight being successful this will not always be true. This is one sample simulation to show uncertainty is important (eventually a Monte Carlo sim with 10k iterations was executed).

Slide 7 Measure of Effectiveness Since there is no revenue or profit, I created a measure of effectiveness that is essentially This MoE is designed to maximize overall HSF capability. If only looking at cost for the NEA mission, there is no incentive to pursue SEP. (CPS dominates in cost alone). Look for an investment strategy that seeks to maximize overall increase in TRL per unit cost while ensuring that there is a feasible in-space propulsion alternative to execute the NEA mission. Maximizing technology readiness rather than minimizing cost can also be seen as a form of flexibility given the uncertainty of mission goals (which have already changed in the past).

Slide 8 Decision Rules Decision Rules give flexibility to abandon SEP. The idea is to maximize the MoE while not spending money on a system that CAN NOT be used for the mid term goal of the NEA Basically if there are not enough flights to increase the TRL of SEP to 8 to be ready for human spaceflight as time goes on (and some precursors fail) you can abandon the SEP research (not spend that money) with the intent that you would then reopen that research once the NEA mission is complete. Two decision rules were implemented: Decision rule #1: If the first SEP flight fails, shut down. If it succeeds, this brings SEP from TRL 6 to 7. One of the next 2 SEP flights must then succeed to proceed to the NEA mission including SEP (SEP reaching TRL 8), otherwise shutdown SEP and continue with CPS only. Decision rule #2: One of the first two SEP flights must succeed. Only one or the other may fail. This will make SEP at least a TRL 7 (could be 8). However the next flight must then succeed to achieve TRL 8 (or 9) before the NEA mission. If not, then shut down SEP and continue with CPS only.

Slide 9 Results Decision Rule #1 is the most interesting option. Upside of Cost Effectiveness is dramatically increased SEP is used less often w/ put option- but money is not spent on lacking capability

Slide 10 Next Steps Compare to NASA TRL roadmaps Define and include uncertainty on cost Include other technology alternatives Define uncertainty on probability of successful flights in more detail

Slide 11 Thank You! Thanks for listening. Special thanks to Prof. de Neufville and Michel for taking time to discuss my project.