TRILL Base Protocol Clarifications and Corrections November 20111TRILL: Clear Correct Donald E. Eastlake, 3 rd (Huawei) Mingui Zhang (Huawei) Anoop Ghanwani.

Slides:



Advertisements
Similar presentations
TRILL ESADI draft-hu-trill-rbridge-esadi-00 Hongjun Zhai (ZTE) Fangwei hu (ZTE) Radia Perlman (Intel Labs) Donald Eastlake 3 rd (Huawei) July 20111TRILL.
Advertisements

TRILL Header Extension Simplifications Donald Eastlake 3 rd Huawei Technologies 1July 2011.
Communication Networks Recitation 3 Bridges & Spanning trees.
Overview of TRILL Active-Active Goals, Challenges, and Proposed Solutions Radia Perlman 1November 2013.
July 2006IETF TRILL1 Multicast MAC Addresses for Standards Use Donald E. Eastlake 3 rd
TRILL issue: Using Pseudonode Nicknames for Ingress RBridge Radia Perlman Hongjun Zhai Fangwei Hu 1November 2011.
TRILL Cloudlet Radia Perlman Donald Eastlake 3 rd Fangwei Hu August 20121TRILL: Cloudlet.
Directory Assisted TRILL Encapsulation by non-TRILL nodes (Directory Reliant Smart End Node) Linda Dunbar Donald Eastlake Radia Perlman Igor Gashinsky.
Fine Grained Labeling draft-ietf-trill-fine labeling-01.txt Donald E. Eastlake 3 rd Huawei Technologies August 2012TRILL FGL1.
March 2007TRILL WG, IETF Prague1 TRILL issue: Multicast Input Link Filtering Radia Perlman
Single Area Border RBridge Nickname for TRILL Multilevel draft-zhang-trill-multilevel-single-nickname-00.txt Mingui Zhang, Donald Eastlake, Radia Perlman.
Centralized Replication for BUM traffic in active-active edge connection draft-hao-trill-centralized-replication-02 Weiguo Hao Huawei Yizhou Li Huawei.
TRILL: Traffic engineering draft-hu-trill-traffic-engineering-00.txt Fangwei Hu Jacni Qin
Internet Networking Spring 2002
1 Internet Networking Spring 2006 Tutorial 3 Ad-hoc networks TBRPF (based on IETF tutorials on TBRPF)
© 2002, Cisco Systems, Inc. All rights reserved..
Revision of the Appointed Forwarder RFC draft-eastlake-trill-rfc txt Donald E. Eastlake, 3 rd March 2015 Appointed.
TRILL Link Protocols Donald Eastlake Huawei Technologies July 20141Directory Assist.
TRILL over IP draft-ietf-trill-over-ip-01.txt IETF 91, Honolulu Margaret Wasserman Donald Eastlake, Dacheng Zhang.
TRILL OAM draft-eastlake-trill-rbridge-channel-00 draft-bond-trill-rbridge-oam-01 draft-manral-trill-bfd-encaps-01 Donald Eastlake 3 rd Huawei Technologies.
LSP Ping Relay Reply L. Jin J. Luo T. Nadeau G. Swallow.
IEEE 802.1q - VLANs Nick Poorman.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.1 Module 7 Spanning Tree Protocol.
Routing and Routing Protocols Dynamic Routing Overview.
TRansparent Interconnection of Lots of Links (TRILL) March 11 th 2010 David Bond University of New Hampshire: InterOperability.
VLAN Trunking Protocol (VTP)
November 2011IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list: Tools site:
Submission doc.: IEEE 11-12/0621r2 May 2012 Donald Eastlake 3rd, HuaweiSlide 1 Alternative Mesh Path Selection Date: Authors:
March 2008Protocol Draft Changes -06 to -071 TRILL Protocol Specification Changes from -06 to -07 Donald Eastlake 3 rd
March th IETF - Prague1 TRILL Working Group From draft 03 to draft 04 Dinesh Dutt, Cisco Silvano Gai, Nuova Radia Perlman, Sun.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Link-State Routing Protocols Routing Protocols and Concepts – Chapter 10.
Multicast Distribution Tree Extensions for IS-IS draft-yong-isis-ext-4-distribution-tree-02 Lucy Yong Donald Eastlake Andrew Qu July
Rfc7180bis: Further TRILL Clarifications, Corrections, and Updates Donald Eastlake Mingui Zhang, Radia Perlman, Ayan Banerjee, Anoop Ghanwani, Sujay Gupta.
July 2011IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list: Tools site:
1 Multilevel TRILL draft-perlman-trill-rbridge-multilevel-00.txt Radia Perlman Intel Labs March 2011.
November 2010Future TRILL Work1 Future TRILL Work 2 Donald Eastlake 3 rd 155 Beaver Street Milford, MA USA
Directory Assisted Edge Donald Eastlake, Linda Dunbar Huawei Technologies
TRILL OAM & BFD draft-eastlake-trill-rbridge-bfd-00.txt Donald E. Eastlake 3 rd 155 Beaver Street Milford, MA USA November 20101TRILL OAM & BFD Vishwas.
November 2010IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list: Tools site:
TRILL remaining issues Radia Perlman
TRILL OAM - Update, Status and Next Steps 84 th IETF, Vancouver, Canada.
November 2013TRILL Directory Assist Mechanisms1 TRILL Directory Assistance Mechanisms draft-dunbar-trill-scheme-for-directory-assist-06 draft-eastlake-trill-ia-appsubtlv-03.
Possible TRILL Use of GENAPP in draft-ietf-trill-rbridge-channel Donald E. Eastlake, 3 rd Huawei Technologies (USA) 24 July
6LoWPAN Ad Hoc On-Demand Distance Vector Routing Introduction Speaker: Wang Song-Ferng Advisor: Dr. Ho-Ting Wu Date: 2014/03/31.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Link-State Routing Protocols Routing Protocols and Concepts – Chapter 10.
RBridges: Operations, Administration, and Maintenance (OAM) Support David Bond, Vishwas Manral UNH-IOL, IP Infusion draft-bond-trill-rbridge-oam-00 1.
March 2012IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list: Tools site:
August 2012IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links NEW Mailing list address: Tools.
Draft-ietf-pce-stateful-pce-07 draft-crabbe-pce-pce-initated-lsp-03 Stateful PCE - update Ina Minei Ed Crabbe Jan Medved Robert Varga Siva Sivabalan.
March th IETF - Prague1 TRILL Working Group Changes from draft-trill-rbridge-protocol-02.txt to draft-trill-rbridge-protocol-03.txt Dinesh Dutt,
Submission doc.: IEEE 11-12/0621r6 November 2012 Donald Eastlake 3rd, HuaweiSlide 1 Alternative Mesh Path Selection Date: Authors:
March 2007RBridge Extensions1 RBridge Protocol Extensions and the Inner Q-tag Location Donald Eastlake 3rd
March 2015IETF TRILL WG1 TRILL Working Group TRansparent Interconnection of Lots of Links Mailing list address: Tools site:
CSE 421 Computer Networks. Network Layer 4-2 Chapter 4: Network Layer r 4. 1 Introduction r 4.2 Virtual circuit and datagram networks r 4.3 What’s inside.
March 2015 TRILL Link Security March 2015 TRILL Link Security
83rd IETF Paris by Tissa Senevirathne Les Ginsberg Ayan Banerjee
Future TRILL and TRILL Related Work
Internet Control Message Protocol (ICMP)
TRILL Working Group TRansparent Interconnection of Lots of Links
RBridge Channel Tunnel Protocol
TRILL Directory Assistance Mechanisms
Additional TRILL Work/Documents
GeneRic Autonomic Signaling Protocol draft-ietf-anima-grasp-08
Chapter 10 Link State Routing Protocols
Dynamic Routing Protocols part3 B
YANG Data Models for TE and RSVP draft-ietf-teas-yang-te-19 draft-ietf-teas-yang-rsvp-10 draft-ietf-teas-yang-rsvp-te-05 draft-ietf-teas-yang-te-mpls-01.
TRILL Adjacency Document Status
TRILL Header Extension Improvements
RFC 4601 Revision Prague, March 2011 Rishabh Parekh (Cisco)
TRILL Adjacency Document Status
Presentation transcript:

TRILL Base Protocol Clarifications and Corrections November 20111TRILL: Clear Correct Donald E. Eastlake, 3 rd (Huawei) Mingui Zhang (Huawei) Anoop Ghanwani (Dell) Ayan Banerjee (Cisco) Vishwas Manral (HP)

TRILL Clarifications and Corrections draft-eastlake-trill-rbridge-clear-correct-01 Covers an accumulation of clarifications that have come up since the TRILL protocol was approved as a standard in March Mostly updates RFC 6325 but also includes one clarification of RFC Corrects three Errata against RFC November 20112TRILL: Clear Correct

TRILL Clarifications and Corrections draft-eastlake-trill-rbridge-clear-correct-01 Topics in current draft: – Overloaded / Unreachable RBridges – Distribution Tree Updates – Nickname Selection – MTU – The CFI / DEI bit – When LSP synchronization starts November 20113TRILL: Clear Correct

Overloaded / Unreachable RBridges When an RBridge campus partitions, an RBridge determines tree roots and calculates distribution trees only within its partition, regardless of LSPs hanging around from Rbridges now unreachable by LSP flooding. Discusses receipt and origination of known unicast and multi-destination frames. – Adds an optional feature for Overloaded Rbridge Origination of Multi-destination Frames (OOMF). November 20114TRILL: Clear Correct

Overloaded RBridges OOMF Overloaded RBridges cannot be trusted to either correctly calculate distribution trees or perform the reserve path forwarding check (RPFC). Overloaded Origination of Multi-destination Frames (OOMF) feature: – If Rbridge RB1 is in overload but immediate neighbor RB2 is not and – RB2 can use a distribution tree on which RB1 is a leaf node from RB2 and – RB2 volunteers to offer this service, then – RB1 can send the frame to RB2 with a special egress nickname requesting this service. November 20115TRILL: Clear Correct

Overloaded RBridges OOMF November 20116TRILL: Clear Correct R1 R2 R3 R4

Distribution Tree Updates Recommends that, if nickname N1 ceases to be a tree root and there is enough room in local tables, forwarding and RPFC entries for N1 be retained in case there are frames in flight on that tree. November 20117TRILL: Clear Correct

Nickname Selection Fixes Errata in Section of RFC 6325 related to psuedonodes concerning priorities to hold nicknames. Discusses effects of partition on nickname selection. Explains effects in the very unlikely case of nickname exhaustion. November 20118TRILL: Clear Correct

MTU This section of the draft is intended to provide an exact explanation of what various MTU numbers mean on links of various technologies. November 20119TRILL: Clear Correct

The CFI / DEI Bit Update to RFC 6325 to accommodate the IEEE change of the CFI (Canonical Format Indicator) bit in C-VLAN tags to be a DEI (Drop Eligibility Indicator) bit in 802.1Q November TRILL: Clear Correct

When LSP Synchronization Starts Clarify RFC 6327 by adding a specification of when an RBridge starts to send LSPs on a link. It is when its state with regard to at least one neighbor out at port is in the Two-Way or Report state. November TRILL: Clear Correct

END November TRILL: Clear Correct Donald E. Eastlake, 3 rd (Huawei) Mingui Zhang (Huawei) Anoop Ghanwani (Dell) Ayan Banerjee (Cisco) Vishwas Manral (HP)