Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.

Slides:



Advertisements
Similar presentations
Ongoing discussions on the formulation of National Appropriate Mitigation Actions (NAMAs) and their possible inclusion as market mechanisms in a post-2012.
Advertisements

The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
PoA AFTER Cancun - READY TO TAKE OFF NOW
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
· © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
UNFCCC Secretariat SDM programme CDM‘s contribution to global climate action; its sucesses and further contribution Fatima-Zahra Taibi, UNFCCC secretariat.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
GHG PROTOCOL INITIATIVE Emerging Project Accounting Standards & Guidance Mahua Acharya, WBCSD World Resources Institute.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
T HE W ORLD B ANK C ARBON F INANCE U NIT Extension of simplified modalities for demonstration of additionality to EE and RE projects.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
Possible Development of CDM in the Post-2012 Regime DUAN Maosheng Tsinghua University Beijing, Nov. 19, 2007.
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
International Climate Change Regime n UNFCCC – “stabilization of greenhouse gas concentrations at a level that would prevent dangerous anthropogenic interference.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Pilot Project on the Use of Flexible Instruments for Climate Policy in Baden-Wuerttemberg: A Manual to Facilitate Companies Participation Fraunhofer Institute.
Simplified modalities for demostration additionality to EE and RE projects: Approach to demostrate additionality in micro scale projects in Peru Ministry.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Developing a Framework for Offset Use in RGGI Opportunities and Risks Dale Bryk, NRDC and Brian Jones, MJB&A – Northeast Regional GHG Coalition RGGI Stakeholder.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Forest Carbon Partnership Facility (FCPF) Readiness Procedures July 9, 2008.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
UNEP Collaborating Centre on Energy and Environment CDM developments Njeri Wamukonya Regional CD workshop, 3-4 March 2003, NBI.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
Review of CDM methodology development process Annual Meeting of the Host Country Committee on Carbon Finance Washington DC, 15 February 2005 Lasse Ringius.
International Climate Policy Hamburg Institute of International Economics International Climate Policy Options for making small scale CDM projects more.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
Expectations and requirements for A&R CDM projects: Points of view of some Latin American Countries. IUCN-UNEP-FAO Side Event. SUBSTA 18. Bonn
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Does project reduce, prevent or mitigate the release of 1 or more of the Kyoto gases [See appendix 3]? Does the project remove CO2 or other GHGs from the.
1 Market View of JI in the National Context Ben Feldman Managing Director Natsource LLC UNFCCC Technical Workshop on Joint Implementation Bonn, Germany.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Bundling small scale projects Principles of bundling Bundling Documentation Examples and their applications in Carbon Finance projects Bundling (& “de-bundling”)
The Prototype Carbon Fund: Project Portfolio Development Issues.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
JI Project Cycle Status and observations Morten Prehn Sorensen FIRST SDM JOINT COORDINATION WORKSHOP Maritim Hotel Bonn, Germany March 2012.
INTERNATIONAL ENERGY AGENCY AGENCE INTERNATIONALE DE L’ENERGIE Technology and Trading Systems A Comment Dolf Gielen Senior Analyst IEA.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Buyers' and Seller's Perspectives on JI : The Fund Perspective
German Emissions Trading Authority (DEHSt)
Joint Implementation A Parties and Buyers Perspective
Baseline setting and monitoring under JI compared to the CDM approach
Small Scale Projects – Learning from the CDM Paul Soffe
Small-Scale Projects Under JI
Presentation transcript:

Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March 2006 UNFCCC Technical Workshop on Joint Implementation

SSC Projects: Historical Background In the late 1990, global political consensus that small CDM projects are desirable. Key reasons: sustainability benefits environmentally benign and often inherently attractive by themselves the predominant option in rural areas and poor countries. Unlike regular-size CDM projects, small projects unable to absorb high transaction costs. Simplified rules needed. In 2001 agreement in Marrakesh reached to develop simplified modalities and procedures for SSC projects.

Three types of SSC Projects Three types of SSC Projects

Three Main Project Types

Envisioned Advantages of Simplification Lower development and transaction costs. Shortened project development time. Early delivery. Less regulatory uncertainty. Reduced risks. Simplified environmental impact assessment. Simplified baselines and additionality tests.

Experience with SSC projects to date Fewer SSC projects than expected -- and almost no energy savings projects (i.e. project category 2) -- have been developed. SSC projects have not lead to a more balanced regional distribution of projects. The simplified modalities and procedures have not resulted in significantly lower transaction costs, or a fast-track process, for small projects. Main reasons include: …

Reasons for difficulties with SSC … no significantly lower transaction costs and fast-track process. Main reasons include: The host country context for ssc project can be very complex (small enterprises, households, NGOs with very limited capacity and resources). Availability of required data is often limited at the project level. The concept of additionality is often difficult to grasp for project developers. Additionality: The barrier test is subjective and often contrary to project developers intuition. Little scope for aggregation (bundling) of projects consisting of a high number of small geographically and temporally dispersed components. Mismatch between real-world project conditions and methodologies is common and have resulted in a need for frequent revisions and clarifications of methodologies, and the development of new methodologies.

General observations There are important similarities between SSC projects under CDM and JI, but also differences, most importantly that they occur under the general emission cap of JI countries. There are significant SSC type mitigation opportunities in JI countries, which are unlikely to be accessible by JI without specific modalities. Small projects typically have a limited impact on emissions, are often community-based and can demonstrate climate-friendly activities to a large number of participants, thus setting examples, and contribute to the sustainable development of the host country. Small JI projects will not be able to absorb the high transaction costs experienced under CDM, in terms of money and time invested in project development, cost of monitoring and verification. Poor regions will only be able to significantly participate in JI through SSC projects. Thus, establishing SSC projects under JI as a separate project group with simplified modalities will be helpful, meaningful and justified.

Threshold and eligibility criteria The thresholds established under CDM should be reconsidered for JI projects: 15 MW nominal capacity for renewables projects seems workable. The threshold for energy savings projects under JI should be much higher, e.g. 150 GWh/yr (the 15GWh for CDM SSC are roughly equivalent with 1-3 MW generation capacity.) The threshold for “other projects” should be defined differently than under CDM (the link between project emissions and project size is questionable). It is not necessary the size of a project, that is relevant. There should be no limit to bundling of SSC projects, provided they meet the eligibility criteria for SSC JI projects.

Typical project types in JI countries Some types of small projects appear to be more important in JI countries, in particular energy efficiency on the supply and demand side. Programs to promote energy efficiency exist in many JI countries and often include relatively small activities. The definition of, and modalities for, SSC projects should be supportive of such programs.

Key lessons from the SSC projects experience to date Minor simplification benefits will not spur the development of SSC JI projects. The uncertainties are still great and the burden on project developers is too heavy. Lead-time advantages, economies-of-scale and simpler baseline scenarios and additionality tests favor large projects involving non- CO2 gases over SSC projects. Therefore: Simplification benefits need to be significant compared to large- scale projects. Simple but flexible rules are needed. The additionality test should be limited to a common practice test. Baselines should be predefined on the basis of business as usual scenarios and average emissions.

Further Suggestions The modalities for SSC JI should facilitate bundling of projects in particular regarding Project preparation / documentation (paper work reduction), Monitoring and verification (sampling across SSC projects), and Flexibility regarding start dates of SSC activities in a bundle. Host country policies and programs and programmatic activities implemented through non-government intermediaries should be supported by SSC JI modalities. In this context, methodologies should be developed that do not require attribution of emission reductions to specific SSC activities. An additionality test for SSC JI projects may be limited to a demonstration of emission reductions, provided that baselines are predefined at an appropriate level. Alternatively, additionality could be pre-determined on a project-type basis, e.g. for certain renewable energy projects. There is probably no need to consider leakage from SSC JI projects. Finally, project developer should be able to rely on established modalities and methodologies for SSC JI projects throughout 2012 to support capacity development in project intermediaries.