Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.

Slides:



Advertisements
Similar presentations
Low and Medium Voltage Test Facilities in Varennes' Scientific Park Workshop: DER Laboratories of Excellence, Testing, and Standards Napa, December 4th.
Advertisements

New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Submitted by: Name:Rajendra Kumar Choudhury Branch:Electrical Engg.
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
Distributed Intelligence Provides Self-Healing for the Grid
GENERATOR PROTECTION.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
RT3b – André Smit, Siemens USA
Smart Grid Protection RT 3 b
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
Chapter 7 SYSTEM PROTECTION
2015 World Forum on Energy Regulation May 25, 2015
Interconnect Protection of Dispersed Generators
Roger C. Dugan Fellow, IEEE Review of the Impacts of Distributed Generation on Distribution Protection 2015 IEEE Rural Electric Power Conference Asheville,
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
Area of Study 2: Electricity
Vidhyadeep Institute Of Management & Technology, Anita, Kim Electronics & Communication Department Guided by Mr. Vicky Paperwala.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Frankfurt (Germany), 6-9 June 2011 Power System Impacts from Large Scale Deployment of EV -The MERGE project – João A. Peças Lopes
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Frankfurt (Germany), 6-9 June 2011 ARCHITECTURE AND FUNCTIONAL SPECIFICATIONS OF DISTRIBUTION AND TRANSMISSION CONTROL SYSTEMS TO ENABLE AND EXPLOIT ACTIVE.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Electrical Distribution Training
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
CLEMSON UNIVERSITY DG CONFERENCE UPDATE ON THE CURRENT STATUS OF DG INTERCONNECTION PROTECTION WHAT IEEE 1547 DOESN’T TELL YOU ABOUT INTERCONNECTION PROTECTION.
Manjula Dewadasa Arindam Ghosh Gerard Ledwich
Frankfurt (Germany), 6-9 June 2011 Fabio Cazzato, Simone Botton, Marco Di Clerico – Enel Distribuzione SpA Simone Botton – Italy – Session 4 – Paper ID.
A low - cost high performance MV RMU with circuit breakers for use in remote controlled MV / LV substations Fabio GIAMMANCO Luca GIANSANTE 1 1.
Frankfurt (Germany), 6-9 June 2011  In the future, traditional fuse based over- current protection of LV networks will not be applicable for LV microgrids.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Frankfurt (Germany), 6-9 June 2011 Nuno Ferreira– Portugal – Session 3 – Paper ID:561 UTILITIES RESPONSE TO EXTREME CONDITION EVENTS EDP DISTRIBUIÇÃO CASE.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Doc.: IEEE /0121r1 Submission January 2010 Craig Rodine, Electric Power Research InstituteSlide 1 Some High-Level Smart Grid Requirements Date:
Power Quality Impacts of Distributed Generation Roger C. Dugan Sr. Consultant Electrotek Concepts, Inc. Tennessee Tech. February 9, 2004.
On-line Condition Monitoring of Distribution Network Assets – Making the Network Smarter Neil Davies Neil Davies – UK – Session 1: Network Components –
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Frankfurt (Germany), 6-9 June 2011  Manfred Wurm  EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE.
Frankfurt (Germany), 6-9 June 2011 Detailed Analysis of the Impact of Distributed Generation and Active Network Management on Network Protection Systems.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
1 Distributed Generation and Power Quality-Continued.
Steady State Analysis Of A Microgrid Connected To A Power System
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Submitted to: Submitted by:
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
Submitted To:- Submitted By:- Mr.
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Évora Demonstrator Site
EU-IPA12/CS02 Development of the Renewable Energy Sector
Interconnection of AES With The Grid
Sami Repo Tampere University of Technology FINLAND
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000 MW in 2007 and 2008  Operational experience: Islanding behaviour during network maintenance or faults Overvoltages in PV plants, causing damages (CIRED 2009)  Field tests in large PV plants connected to Iberdrola’s networks, to reproduce both cases. F.J. Pazos – Spain – Session 4 – Paper 0184 Operational experience and field tests on islanding events caused by large photovoltaic plants

Frankfurt (Germany), 6-9 June 2011  Experience: Dangerous work conditions Impossibility of network operation or maintenance Failure of network automation Damaged inverters F.J. Pazos – Spain – Session 4 – Paper 0184 Islanding events

Frankfurt (Germany), 6-9 June 2011  Failure of anti-islanding protections during maintenance of a MV/LV substation  Safety golden rules: 1. Isolate working area 2. Lock isolation 3. Voltage verification…  Increased risk: electric arc across a switch (2) not designed for load breaking. F.J. Pazos – Spain – Session 4 – Paper 0184 Dangerous work conditions

Frankfurt (Germany), 6-9 June 2011  Solution for dangerous work conditions: Additional voltage absence verification, before MV switching.  Consequence: Maintenance works could not be carried out  No access to switching devices within PV plants  Dispersed PV plants, several km away from the working area F.J. Pazos – Spain – Session 4 – Paper 0184 Impossibility of network operation or maintenance

Frankfurt (Germany), 6-9 June 2011  Breakers with synchronism or voltage absence verification cannot close Voltage in the islanding network looses synchronism with the network Normal service cannot be restored Further actions to identify and disconnect voltage source. F.J. Pazos – Spain – Session 4 – Paper 0184 Failure of network automation

Frankfurt (Germany), 6-9 June 2011  Breakers without voltage verification Breakers will close although PV is still generating Overcurrent, harmful for inverter IGBT. Some cases of fatal damages, affecting up to 100% of the inverters of a large PV plant.  Frequent case: Earth fault in MV feeder (difficult to detect in LV) Followed by fast reclosing (from 0.4 to a few sec.)  Solution: Extremely fast internal overcurrent protection in inverters. F.J. Pazos – Spain – Session 4 – Paper 0184 Damaged inverters

Frankfurt (Germany), 6-9 June 2011  Islanding events have to do with the interaction between inverters and loads. The system tends to find a stable point, mainly by voltage adjustment (not so much by frequency) Possible with some generation-consumption imbalance (10%) They can last long time. F.J. Pazos – Spain – Session 4 – Paper 0184 Field tests Voltage & frequency during islanding

Frankfurt (Germany), 6-9 June 2011  Failure of anti-islanding systems due to interaction between several inverters Actual field situation is not represented by laboratory tests. Failures with several inverters of the same brand Failures with several inverters of different brands 5 inverter brands tested  From several countries  With different anti-islanding methods (passive and active) F.J. Pazos – Spain – Session 4 – Paper 0184 Field tests

Frankfurt (Germany), 6-9 June 2011  Coordination between protections: Included in the inverters (active or passive methods) Protections of the point of coupling (relays) Communication based protections  Fast: intertripping  Slow: based on telecontrol  New developments  Coordination of requirements from Transmission and Distribution System Operators TSO: delayed or insensitive trip to prevent instability DSO: fast and certain trip, to prevent damages or affecting power quality F.J. Pazos – Spain – Session 4 – Paper 0184 Solution: COORDINATION

Frankfurt (Germany), 6-9 June 2011  Coordination between inverter manufacturers (standards) Improve anti-islanding tests In more real conditions (several inverters in parallel) F.J. Pazos – Spain – Session 4 – Paper 0184 Solution: COORDINATION

Frankfurt (Germany), 6-9 June 2011  DER connected to MV/HV, give priority to system stability FRT capabilities Passive protections (internal or at the point of coupling) Communication based protections.  In general, telecontrol for safe maintenance works  Occasionally: intertripping.  DER connected to LV: give priority to safety and lower communication requirements Telecontrol by means of smart meters with internal switch  With FRT Fast active and multi-inverter methods when telecontrol is not available.  Without FRT F.J. Pazos – Spain – Session 4 – Paper 0184 Proposal: Segmentation

Frankfurt (Germany), 6-9 June 2011 F.J. Pazos – Spain – Session 4 – Paper 0184 Thank you for your attention