Building Commissioning/Energy Performance Contracting.

Slides:



Advertisements
Similar presentations
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
Advertisements

Acme Industrial Mechanical, Inc. Capabilities Presentation Performance-Based Planned Maintenance Providing Leadership Quality Service for the HVAC Industry.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
Next Century Power: Energy Efficiency Opportunities in Newer K-12 Schools Senate Energy, Utilities and Communications Committee February 19, 2013 David.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President
Retrocommissioning Trends HPBCCC Steve Wiggins NEBB Immediate Past-President.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
Campus Energy Efficiency Fund PERC Fall Conference and Annual Meeting Climate Change Panel Joyce Ferris October 29, 2013.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
DATA-BASED COMMISSIONING BUILDING-WIDE FUME HOOD FACE VELOCITY REDUCTION MIT Laboratory Energy Efficiency Case Studies.
Motivating Facilities Staff Towards Improved Operational Efficiency Motivating Facilities Staff Towards Improved Operating Efficiency Peter H. Herzog,
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
Building Commissioning
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Department of Facilities Management Maintenance & Operations.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
You can achieve 100% Energy Saving WHEN YOU TURN OFF THE LIGHTS.
Now it is fixed. BILL ANALYSIS. RETRO-COMMISSIONING BENCHMARKING Note, this case is extreme but it’s not alone. It’s roughly 2.5 times the average use.
Commissioning for High Performance Commissioning for High Performance Ken Meline, Principal Command Commissioning, LLC.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
ENERGY ASSESSMENTS, RETRO-COMMISSIONING AND TECHNICAL SUPPORT Eileen Westervelt | PE | CEM SEDAC, Program Director, Retro-Commissioning.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Introduction to Integrated Chiller Retrofits Dr. Lisa Gartland (510) ,
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Program Overview Public Buildings Enhanced Energy Efficiency Program (PBEEEP) This program was made possible with funding from the U.S. Department of Energy.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
5 EXISTING BUILDINGS. Slide header copy In This Chapter >Sustainable existing buildings >Planning green projects for existing buildings >Measures to improve.
Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
How to Have a Successful Retrocommissioning Project Karl Stum, PE Portland Energy Conservation Inc. (PECI) Successful Retrocommissioning.
Week 12 Overview of equipment and building envelope as part of the energy audit.
Week 10 Common Industrial Building energy efficiency measures (Energy Management Opportunities)
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Buildings & Grounds State of the Schools. The role of the custodial staff for Foley Public Schools is to provide a safe, comfortable and clean environment.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE.
Overview What is commissioning (short version)
Sean Weber Energy Engineer
Energy Savings Performance Contracts & Energy Service Companies
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Implementing Effective Energy O&M Strategies on a Limited Budget
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Energy Savings Performance Contracting (ESPC)
Who Benefits? Building Owners
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

Building Commissioning/Energy Performance Contracting

What is building commissioning? Building Commissioning is - a systematic and documented process of ensuring that the owner's operational needs are met, building systems perform efficiently, and building operators are properly trained.

Types of building commissioning New Building Commissioning: is used on new building or major renovations of existing buildings. Re-Commissioning: is used on buildings that have been previously commissioned. Retro-Commissioning: is performed on buildings that have never been commissioned.

What is new building commissioning? New building commissioning – ideally starts in the pre-design or design phase of a project and goes through construction. The focus is typically on the heating ventilating and air conditioning. Other systems to consider include the building envelope, emergency power, and any other system that has been a problem for the building owner on previous construction projects.

What is re-commissioning? Re-commissioning is - to commission a building that has been commissioned before. This commissioning is done to ensure that the building is operating optimally and all systems are functioning as intended. Studies have suggested that buildings should be re-commissioned every three to five years.

What is retro-commissioning? Retro-Commissioning is - Assurance that the building operates to original design intent. A systematic process for improving and optimizing a building’s operations and maintenance. Usually focused on energy-using equipment such as mechanical equipment, related controls, and lighting.

What is the goal of retro-commissioning? To identify and fix existing problems, such as indoor air quality and to improve the energy efficiency of the building. To provide a facility that meets the current needs of the building owner and occupants. To provide training for facility operators on the operation and maintenance of the existing building systems.

What does retro-commissioning involve? Verifying and documenting existing building systems’ performance. Testing HVAC systems’ performance to ensure that they meet the current needs. Identifying and recommending solutions to existing building problems.

When to retro-commission If the building has never been commissioned. If the original usage of the building has changed. If the building is experiencing: –occupant comfort complaints. –indoor air quality problems. –higher energy costs. –numerous operation and maintenance problems.

Developing the retro-commissioning scope of work Before meeting with the commissioning agent develop a draft retro-commissioning scope of work. Ask the facility owner and operator what problems they are encountering. Interview building staff to find out what problems they are experiencing.

What should be budgeted for retro- commissioning? $0.40 to $1.20 per square foot depending on the complexity, size and location of the building. General housekeeping done before commissioning is started can help reduce costs. Assigning maintenance staff to assist the commissioning agent can also help reduce the cost and it provides a good training opportunity.

Cost savings for retro-commissioning 5% - 20% reduction in operating costs for a building that is retro-commissioned. 1.5 – 7.5 year simple payback on retro- commissioning projects is typical. This is based on: –lower energy usage. –reduced operational problems. –improved occupant comfort.

Enterprise Services Commissioning Program Provides assistance and guidance throughout the commissioning process. Provides direct access to qualified commissioning agents. You select the most qualified commissioning agent for your project.

Enterprise Services Commissioning Program Helps negotiate the scope of work and commissioning cost. Writes and manages the contract with the commissioning agent for you.

Retro-commissioning projects Bellingham Technical College, Administration Building (indoor air quality) Riverside School District, Riverside High School (indoor air quality) North Thurston School District, North Thurston High School (energy usage and indoor air quality)

Retro-commissioning projects Clover Park School District, Park Lodge Elementary (occupant comfort) Clover Park School District, Idlewild and Oakbrook Elementary Schools (energy usage) Yelm School District, Prairie Elementary (occupant comfort and energy usage)

Retro-commissioning projects North Mason School District, Sand Hill Elementary (energy savings and occupant comfort) Department of Ecology, Headquarters Building Olympia (indoor air quality) Capital Campus, Office Building 2 (occupant comfort and energy usage)

Building commissioning resources DES’s Building Commissioning Program: nergy/Pages/default.aspx nergy/Pages/default.aspx Building Commissioning Association:

Thank You Doug Kilpatrick, P.E. Department of Enterprise Services (360)