AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

AGS/Booster Issues Feb. 25, 2014 Time Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Maintenance and Accelerator Support RHIC Start Up 12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Haixin Huang AGS Cold Snake: Status and Plans.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Accelerator Support and Maintenance Startup for Run 13.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Injector Status Jan. 19, 2016 Time Meeting Haixin Huang.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Possibility for polarized beam at J-PARC Summary of Satellite Workshop on Polarized Proton Beam at J-PARC Satellite Workshop Program: Overview of the status.
Multiple Partial Siberian Snakes
Update on MEIC Ion Polarization Work
Multiple Partial Siberian Snakes
Presentation transcript:

AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang

2 Status l Power Dip on Saturday around 3pm. Initially, outstanding issues were Booster cavities B3 and A6, AGS cold snake. We get reasonable polarization (>70%) with low intensity. Working on extraction. l AMS run lost Sunday operation and is making up today. NSRL operation starts tomorrow. l No plan to have Au beam for RHIC in the near future. l No resource to work on AGS polarimeter vertical motion, we can use it with slower speed (no slippery). l We worked on AGS user2 with faster ramp. We will work on JQ timing next. l The intensity for RHIC fill is increased gradually, to 2.2* l We varied the scraping ratio in the Booster to see what is the optimized settings for 2.2E11 intensity. The original settings are still the best. The AGS early tune was modified to reduce the vertical emittance at flattop is reduced by about 4%.

Haixin Huang 3 Horizontal Vertical Emittance by IPM at Flattop with RF off RF off