Coordination Matt Wiesenfeld Darcy Bullock Purdue University.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

Fixed Time Signal Coordination
Lecture 1 Traffic Signal Coordination. Lecture 1 Why? When the traffic signals are placed close enough, it is often seen that the cars waiting in a queue.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Current Practices in Traffic Signal Coordination
Hardware-In-the-loop Traffic Simulation in Florida Ken Courage Seokjoo Lee University of Florida Transportation Research Center.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
CEE 764 – Fall 2010 Topic 7 Special Issues on Signal Coordination.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
REVISION. Sample Question The sample questions for this year. Describe briefly the classic transport model, explaining the four stages of the model. [10]
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
Introduction to Transport
PASSER II SOFTWARE.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Lecture #15 Actuated Signals: Chapter 19. Objectives Understand the benefits of actuated signals Understand the basic parameters Application in a coordinated.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
CEE – Spring 2005 Lectures 16, 17 (Handouts, Chapter 24) Signal Timing and Coordination.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic Programming Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic.
Lec 22, Ch.18, pp : Capacity & LOS (Objectives) Understand how critical lane groups and the sum of critical lane v/s rations are determined Learn.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
Lecture 2 Basics of Traffic Control Signals Any power-operated traffic control device other than a barricade warning light or steady burning electric lamp,
Transportation Engineering
Adaptive Traffic Light Control For Traffic Network.
Peter Koonce TRB Annual Meeting January 9, 2005 Best Practices for Signal Operations Best Practices for Signal Operations – Lessons Learned from the Portland.
2015 Traffic Signals 101 Topic 7 Field Operations.
Transportation Engineering
Source: NHI course on Travel Demand Forecasting (152054A) Session 10 Traffic (Trip) Assignment Trip Generation Trip Distribution Transit Estimation & Mode.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
Chapter 20: Actuated Signal Control and Detection
Introduction to Traffic Signals Adam Kirk. Identify 1 part of the traffic signal.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
TRB Signal Timing Best Practices Workshop 2005 Isolated Actuation, plus The Dilemma Zone Dilemma Rick Denney Iteris.
The Comparison of PARAMICS ( MODELLER ), GETRAM( TEDI ), CORSIM, and VISSIM Roundabout Construction Interchange Construction Workzone Construction Data.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Introduction to Transport
CEE 764 – Fall 2010 Topic 3 Basic Signal Timing and Coordination Principles.
Bernhard Friedrich Hanover, May 2001 Strategic Control in Metropolitan Areas Bernhard Friedrich Institute of Transport Engineering and Planning Hanover.
 Links the optimized settings to VISSIM, the operational analysis results is: Synchronization of Intersections This study employs the core logic of MAXBAND.
Behavior Control of Virtual Vehicle
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Signal timing CTC-340. Key Elements Development of safe and effective phase plan and sequence Determination of vehicle signal needs –Timing of yellow.
Mission Street Voyage Advanced Features Test Facility Mission street is a major arterial corridor that was re-timed 10 years prior to our project. Our.
City of Portland - Isolated Timing Operations January 9, 2005 Isolated Timing Operations - Workshop on Best Practices for Signal Timing Bill Kloos Signals.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Thinking Inside the Box
MOVA Traffic Signal Control Trial
GREEN WAVE TRAFFIC OPTIMIZATION
Signalized Intersections
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
* Topic 7 Field Operations
Signalized Intersections
Maryland Unconventional Intersection Design Analysis Tool
Highway capacity and Level of Service Analysis
School of Civil Engineering
Integrated System of Traffic Software
Presentation transcript:

Coordination Matt Wiesenfeld Darcy Bullock Purdue University

Sections 1.Introduction and Learning Objectives 2.Terminology 3.Becoming Familiar with Coordinator Status Screens 4.Detector Mapping and Pitfalls 5.Extension Time Adjustments Pitfalls 6.Adjusting Splits on Minor Lefts 7.Balancing Split Times Across Barriers 8.Reallocated Slack Green Time 9.Changing Cycle Length and Observing Impacts 10.Offset Adjustment 11.Leading and Lagging Left turns with Coordinator 12.Estimating Volume to Capacity Ratios 13.Integrating Synchro Outputs into VISSIM ASC/3 Database

1. Learning Objectives The goal of this laboratory exercise is to explain critical coordinated system timing parameters and their effects on capacity allocation and platoon progression. When you have completed this laboratory, you should be able to: – Experiment with and explain how the three fundamental parameter sets, cycle, offset, and split, are used to define coordination. – Experiment with and explain how split times vary in a coordinated-actuated system, and how they operate in comparison to a fixed time system. – Experiment with and explain how the start of green in a coordinated-actuated system varies stochastically. – Experiment with and control the reallocation of unused green time by selecting appropriate operating parameters.

2. Network Terminology (Base Case)

2. Network Terminology (User Changes)

2. Left/Right Screens

2. Laboratory Intersections

2. MOST Interface Database Editor

2. Detector Mapping/Ring & Barrier

3. Coordination Status Network

3. Coordination Status Any changes made on the Front Panel will only affect the current running of the simulation and can only be made while the simulation is running. Changes in the database editor can only occur between runs but will remain until manually changed.

3. Coordination Status Questions to Consider What defines Coordinated Operations? How is green time allocated to different phases in a coordinated operation? How do the front screen and the database differ? What role do the virtual controller and the database serve in Laboratory 6.

3. Coordination Status Discussion How do the virtual controller and the database editor differ? Why is this important in this laboratory? What is the difference between ‘Free’ and ‘Coordinated’ Operation? What defines Coordinated Operations? How is green time allocated to different phases in a coordinated operation? How is a split different then a max time?

4. Detector Mapping

Mapping Detectors to Phases provides a valuable link between the presence of vehicles and the allocation of green time. A missed call on a detector can leave a vehicle sitting at a signal from more than one cycle. Detector Calls assigned the wrong phases can provide unused green at intersections. Simple checks using the controller can be made to insure that each detector is mapped to the appropriate phase.

4. Detector Mapping Questions How would a detector become mis-mapped into a signal controller? Why are missed calls particularly dangerous relative to a detector always making a call? Beside mis-mapping, what can lead to poor detector operation? Pause at 350

4. Detector Mapping Discussion How would a detector become mis-mapped into a signal controller? Why are missed calls particularly dangerous relative to a detector always making a call? Discuss design/documentation procedures that can be used to minimize the likelihood of mismapped detectors. Beside mis-mapping, what can lead to poor detector operation?

5. Extension Times (1)

5. Extension Times (2)

5. Extension Times Extension time allows the presence of a vehicle to extend green time through the allotted split. Long extension times allow a single vehicle to extend green well beyond the time needed to move through the stop bar. Short extension times lead to queue discharge being truncated midway through due to natural vehicle spacing. Extension time, passage time, or vehicle extension time can be added either into the individual detector or the phase in the time plan. Placement in both will lead to double counting thus twice the time anticipated.

5. Extension Times Questions Why would a signal engineer wish to design short extension times? Why would a signal field engineer or technician desire longer extension times? Where and why would placement of extension time be most useful considering all of the functions of detectors and timing plans? Pause at 460

5. Extension Times Discussion Why would a signal design engineer wish to design short extension times? Why would a signal field engineer or technician desire longer extension times? Where and why would placement of extension time be most useful considering all of the functions of detectors and timing plans? Where and when would ‘snappier’ operations be best and least well received?

6. Adjusting Splits on Minor Lefts

Minor street movements in a coordinated operation can only increase green time by taking green time from another minor or major movement. Giving more of the split percentage to a minor left turn can be used to address a split failure. These changes may affect other movements at the intersection, particularly those that must give up split time.

6. Splits

6. Adjusting Splits on Minor Lefts Questions When it is reasonable to effectively move green time from a more heavily travelled movement to a less travelled movement? Considering the barrier locations, what complications might have occurred if reallocate time had come from a major street movement instead of a minor street one? Pause at 350; 450; 550 Only Edits Phase 3 and 4 Splits in Step 5

6. Adjusting Splits on Minor Lefts Discussion When it is reasonable to move green time from a more heavily travelled movement to a less travelled movement? Considering the barrier locations, what complications might have occurred if reallocate time had come from a major street movement instead of a minor street one? What are potential complications of moving green time around a controller?

7. Balancing Split Times Across Barriers

Ring and Barrier structure allow two phases to operate simultaneously as long as these phases are in different rings and between the same barriers. An example would be phases 1 and 5 or 1 and 6 can run simultaneously in this structure. Within a Barrier pair split can be moved easily between phases on the same ring. For example, 5% of the cycle could be transferred from 2 to 1 without any complication. However, split cannot jump a barrier in one ring alone. If split is needed for phase 3 and the donor is phase 2, time from either 5 or 6 must be moved to either 7 or 8 in the example structure. This is important as often the need for green to be transferred across a barrier will only exist in one ring but must be accommodated in both.

7. Balancing Split Times Across Barriers Questions What are the advantages of ring and barrier structure? How is green time transferred within a barrier in a fixed force-off operation? What is the consequence of not transferring time across the barrier in both rings? How might time in a actuated coordinated operation move from phases 4 and 8 to 1 and 5 given fixed force-offs and extra green on the initial phases? Pause at 200 Edits to Table 9

7. Balancing Split Times Across Barriers Discussion What are the advantages of ring and barrier structure? How is green time transferred within a barrier in a fixed force-off operation? What is the consequence of not transferring time across the barrier in both rings? How might time in a actuated coordinated operation move from phases 4 and 8 to 1 and 5 given fixed force-offs and extra green on the initial phases? What is the natural progression of a cycle if too little time is provided for the coordinated phase and too much for the other phases?

8. Allocation of Slack Time

8. Reallocated Slack Green Time(2)

8. Reallocated Slack Green Time The two main styles of green time reallocation are floating and fixed operation. Floating Force-Offs ‘floats’ the initial Force-Off points effectively pushing all the extra green time to the coordinate movements whose barriers remain fixed in the same point of the cycle. Fixed Force-Offs ‘fixes’ the phase Force-Off points allowing each phase to remain green until a time at which it would interfere with the originally allotted time for the next phase, or gaps out due to insufficient demand.

8. Slack Reallocatoin: Float/Fixed FO

8. Reallocated Slack Green Time Questions When it is reasonable to reallocate all available time to the coordinated movement? If each phase in a fixed force-offs requires less green than its original allotment, would a field observer outside of the cabinet be able to distinguish it from floating operation? Pause at 150 Note Change in Figure 21

8. Reallocated Slack Green Time Discussion When it is reasonable to reallocate all available time to the coordinated movement? If each phase in a fixed force-offs requires less green than its original allotment, would a field observer outside of the cabinet be able to distinguish it from floating operation? What are the advantages and disadvantages of floating and fixed force-offs. Discuss the limitations of employing fixed force-offs everywhere and what caveats should be considered before making this transition.

9. Changing Cycle Length (1)

9. Changing Cycle Length (2)

9. Changing Cycle Length Cycle length corresponds closely with queue length. Short cycle lengths provide quicker servicing of each movement but also produce more lost time. Longer cycle lengths provide more overall green time, but produce longer wait times for servicing of each movement. Careful consideration of objectives, volumes, detection and coordination should be made before a cycle length type is defined.

9. Cycle Length

9. Changing Cycle Length Questions When would a shorter cycle length be appropriate? When would a longer cycle length be appropriate? Why in a coordination pattern would a long cycle length be used at a low volume intersection? Pause at 360

9. Changing Cycle Length Discussion When would a shorter cycle length be appropriate? When would a longer cycle length be appropriate? Why in a coordination pattern would a long cycle length be used at a low volume intersection? How does cycle length effect queuing? At signals in or near interchanges, how would cycle length effect operations? List factors which would affect cycle length decisions?

9: Cycle Lost Time/Efficiency/Reality Lost Time 5s per phase 20s per cycle Efficiency 60 s cycle – (60-20)/60=67% 120 s cycle (84%) 240 s cycle ( 92%) – Quadruple Delay, – Gain 8% theoretical capacity

Section 9 Offset Adjustment Offsets allow a coordinated system to return green to a coordinated movement at a predictable point in the signals operation. A good offset will facilitate continuous movement for a platoon of vehicles along the coordinated route. Good offsets are difficult to achieve in both directions. Compromising is often necessary between the coordinated directions. Stochastic variation in start of green for the coordinated movement at an actuated intersection can cause some complication. The approach used in this example is empirical and can be explained more thoroughly in quantitative and graphical methods.

10. Offset Adjustment (1)

10. Offset Adjustment (2)

10. Offset Adjustment How in the field could a poor offset be detected? Why is planning a good offset in both directions along a standard arterial roadway difficult? How does actuation cause stochastic variation in green start times? Pause at 200

10. Which has better progression

10. Offset Concept Time-SpaceSpace-Time

10. Offset Adjustment Discussion How in the field could a poor offset be detected? Why is planning a good offset in both directions along a standard arterial roadway difficult? How does actuation cause stochastic variation in green start times? What are some strategies for overcoming stochastic variation?

11. Leading and Lagging Left Turns

Phase sequencing controls which phases occur after each other in the cycle. Two common types are leading and lagging in reference to left turning movements. Leading is phase sequencing that provides green to the left turn phase on a roadway and then afterwards, the opposite adjacent through movement phase will be provided green. Lagging is phase sequencing in which the through movement receives green first and the turn movement opposite adjacent receives green after the through movement. Changing sequencing from Leading to Lagging can advance the start of green on the through movement by at most the entire left turning split. This change effect both the “Early Return to Green” and the nature of “Offsets”

11. Coordination is a Two Way Problem Lead-Lag can help fit windows

11. Leading and Lagging Left Turns Questions How would lead/lag changes affect left turn delay? What is a possible queuing pitfall of lagging left turns? Why would phase sequencing be used as a tool when offset is available? Why is it not advised to change phase sequencing often along a continuous arterial? Pause at 220

11. Lead/Lag Phase Sequencing Leading (1-5) Sequence 1Lagging (1-5) Sequence 6

11. Leading and Lagging Left Turns Discussion How would lead/lag changes affect left turn delay? What are the ramifications of lagging left turns? Why would phase sequencing be used as a tool when offset is available? Why is it not advised to change phase sequencing often along a continuous arterial?

12. Volume to Capacity Volume to Capacity Ratio (v/c) refers to the actual number of vehicles passing through an intersection in comparison to the number that could have. Conventional wisdom indicates the lower the v/c the better the operation. Capacity at a signalized intersection for a specific lane of a specific movement is a product of the green provided. The calculations in the experiment are simplified to illustrate principles of volume to capacity ratios. Pause at 480 Table 11 Discussion

12. Volume to Capacity Questions How is v/c related delay? How is v/c related to queuing? Why would a properly functioning actuated intersection not have a low v/c even when volumes are low? How is v/c different at an actuated traffic signal compared to a stop controlled intersection?

12. Volume to Capacity Discussion How is v/c related to delay? How is v/c related to queuing? Why would a properly functioning actuated intersection not have a low v/c even when volumes are low? How is v/c different at an actuated traffic signal compared to a stop controlled intersection? How does v/c at an actuated intersection related to intersection utilization?

12. Example 8 phases/24 hours

13. Integrating Synchro with NTCIP Opportunities and challenges Engineering Judgment Engineering Analysis Weekday Saturday Sunday a) Typical 24-hr Flow Pattern Morning Timing Plan Evening Timing Plan Mid-day Timing Plan c) Morning Synchro Analysis Timing Report d) Controller and Intersection Weekday Saturday Free Morning Plan Mid-day Plan Evening Plan Free Sunday b) Discrete Design Volumes 74

13. Synchro Deployment Process 75 Morning Timing Plan Evening Timing Plan Mid-day Timing Plan Good Default Signal Timing DB

13. Idealized Synchro Deployment Engineering Judgment Engineering Analysis Weekday Saturday Sunday a) Typical 24-hr Flow Pattern Morning Timing Plan Evening Timing Plan Mid-day Timing Plan c) Morning Synchro Analysis Timing Report f) Controller and Intersection Weekday Saturday Free Morning Plan Mid-day Plan Evening Plan Free Sunday b) Discrete Design Volumes d) Relevant UTDF Parameters for Morning Plan RECORDNAMEINTIDDATA Cycle Length680 Referenced To61 Reference Phase6206 Offset645 e) UTDF to NTCIP UTDFNTCIPASC Cycle Length patternCycleTime = 80 Reference To asc3crdOffsetRef = Yell Reference Phase splitCoordPhase.3.(2 / 6) = 1 Offset patternOffsetTime = 45 76

13. Synchro Design Volumes 77

13: Synchro Output Synchro Software – Actuated Coordinated – Cycle Length Defined – Splits Optimized 78

13. Deployment of Synchro 79

13. Synchro Data Structures 80

13. Synchro  NTCIP 81

13. Deploying Synchro Timings is More Complicated than Simple 1:1 Conversion i) Direct Mapping Walk = 4 sec ii) Mapping with Translation All Red = 1.5 sec Red Clear = 15 tenth of sec iii) Mapping with Engineering Judgment Max Green + Yellow + All Red = 30seconds Split Time = 30 sec iv) Missing Design Elements ???’s Force-off Mode Lowest Risk Highest Risk UTDF Example Parameter NTCIP Example Parameter 82

13 (i) Walk: Mapping Directly 83 i) Direct Mapping Walk = 4 sec ii) Mapping with Translation All Red = 1.5 sec Red Clear = 15 tenth of sec iii) Mapping with Engineering Judgment Max Green + Yellow + All Red = 30seconds Split Time = 30 sec iv) Missing Design Elements ???’s Force-off Mode Lowest Risk Highest Risk UTDF Example Parameter NTCIP Example Parameter

13 (ii) Red Clear: Mapping with Transition 84 i) Direct Mapping Walk = 4 sec ii) Mapping with Translation All Red = 1.5 sec Red Clear = 15 tenth of sec iii) Mapping with Engineering Judgment Max Green + Yellow + All Red = 30seconds Split Time = 30 sec iv) Missing Design Elements ???’s Force-off Mode Lowest Risk Highest Risk UTDF Example Parameter NTCIP Example Parameter

13 (iii) Split Time: Mapping with Engineering Judgment 85 i) Direct Mapping Walk = 4 sec ii) Mapping with Translation All Red = 1.5 sec Red Clear = 15 tenth of sec iii) Mapping with Engineering Judgment Max Green + Yellow + All Red = 30seconds Split Time = 30 sec iv) Missing Design Elements ???’s Force-off Mode Lowest Risk Highest Risk UTDF Example Parameter NTCIP Example Parameter

13 (iv) Force off Mode: Missing Design Element 86 i) Direct Mapping Walk = 4 sec ii) Mapping with Translation All Red = 1.5 sec Red Clear = 15 tenth of sec iii) Mapping with Engineering Judgment Max Green + Yellow + All Red = 30seconds Split Time = 30 sec iv) Missing Design Elements ???’s Force-off Mode Lowest Risk Highest Risk UTDF Example Parameter NTCIP Example Parameter

13. Syncrho  NTCIP Mapping Overview 87