Systems Analysis & Design (Sixth Edition) 1 Chapter 5 Development Strategies PHASE 2: SYSTEMS ANALYSIS.

Slides:



Advertisements
Similar presentations
System Analysis and Design
Advertisements

Systems Analysis and Design 8th Edition
Systems Analysis and Design in a Changing World
Chapter 8: Evaluating Alternatives for Requirements, Environment, and Implementation.
System Analysis and Design
Data and Process Modeling
Copyright © 2014 Pearson Education, Inc. 1 Managers from across organizations are involved in developing and acquiring information systems Chapter 5 -
Data and Process Modeling
Acquiring Information Systems and Applications
Systems Analysis and Design 9th Edition
Chapter 2.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Effective systems development requires a team effort from stakeholders, users, managers, systems development specialists, and various support personnel,
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Systems Analysis and Design 9th Edition
Chapter 5.
Fundamentals of Information Systems, Second Edition
Development Strategies
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
Management Information Systems, 4 th Edition 1 Chapter 16 Alternative Avenues for Systems Acquisitions.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Investigation and Analysis Chapter 12.
Introduction to Systems Analysis and Design
Acquiring Information Systems and Applications
Acquiring Information Systems and Applications
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
Systems Analysis & Design 5 th Edition Systems Analysis & Design 5 th Edition Chapter 1 Introduction to Systems Analysis and Design.
Com 3kd3 Midterm Exam Time: 3:30 -5:30 pm Monday Oct. 25
PHASE 3: SYSTEMS DESIGN Chapter 8 System Architecture.
Chapter Objectives Describe software trends, including the concept of software as a service Explain software acquisition alternatives, including traditional.
Chapter 5 DEVELOPMENT STRATEGIES
Chapter 6 Home Page – Welcome! To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
Prof. Mohammad Moizuddin
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Systems Analysis & Design 7 th Edition Chapter 6.
11.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
Information Systems Technology Ross Malaga "Part III - Building and Managing Information Systems" III 11 Copyright © 2005 Prentice Hall, Inc MANAGING.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Acquiring Information Systems and Applications
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Acquiring Information Systems and Applications
Systems Analysis and Design 8 th Edition Chapter 7 Development Strategies.
SYSTEMS ANALYSIS AND DESIGN 8 TH EDITION Chapter 7 Development Strategies.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Accounting Information System By Rizwan Waheed M.Com 710.
CHAPTER 13 Acquiring Information Systems and Applications.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
System Implementation
Systems Analysis and Design 10th Edition
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Topic 5 Development Strategies.  Describe the concept of Software as a Service  Define Web 2.0 and cloud computing  Explain software acquisition alternatives,
CHAPTER 13 Acquiring Information Systems and Applications.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 8 Moving from Analysis to Design Design Strategies.
Systems Analysis and Design in a Changing World, Fifth Edition
Development Strategies
Development Strategies
Fundamentals of Information Systems, Sixth Edition
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Building Information Systems
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Presentation transcript:

Systems Analysis & Design (Sixth Edition) 1 Chapter 5 Development Strategies PHASE 2: SYSTEMS ANALYSIS

2 Chapter Objectives Describe software trends, including the concept of software as a service Explain software acquisition alternatives, including traditional versus Web-based software development strategies Describe software outsourcing options, including offshore outsourcing and the role of service providers

3 Chapter Objectives Explain advantages and disadvantages of developing software in-house versus other alternatives Explain cost-benefit analysis and financial analysis tools Explain the differences between a request for proposal (RFP) and a request for quotation (RFQ)

4 Chapter Objectives Describe the contents of the system requirements document Explain the transition from systems analysis to systems design, and the difference between logical and physical design Explain the transition to systems design and the importance of prototyping Discuss guidelines for systems design

5 Introduction Chapter 5 describes the remaining activities in the systems analysis phase The chapter also describes the transition to systems design, prototyping, and systems design guidelines

6 Development Strategies Overview Selecting the best development path is a key decision Requires consideration of three key topics Impact of Internet Software outsourcing options In-house software development alternatives

7 The Impact of the Internet Software as a Service Software and Information Industry Association (SIIA) - an industry group focusing on digital economy Software as a service - redefining the way companies develop and deploy information systems How do you think software as a service is different from software as a product? How might the concept of software as a service impact the software industry?

8 The Impact of the Internet The Changing Software Marketplace Traditional  S/W vendors develop and sell application packages to customers New  Marketplace traditional plus many forms of outsourcing Application service providers Internet business services

9 The Impact of the Internet On Systems Development As an analyst, consider: Traditional Environment Web-based Development Development IBM’s WebSphere Microsoft’s.NET

10 The Impact of the Internet On Systems Development Traditional development Compatibility issues Networks Web-based features are treated as enhancements Security less complex than Web

11 The Impact of the Internet On Systems Development Web-based development Internet-based framework.NET or WebSphere Treats Web as platform Requires middleware Limited in-house involvement, if desired Can prevent illegal copying

12 Outsourcing Transfer of IS services for a fee Performed on a temporary or LT basis Services Development Operation Maintenance

13 Outsourcing The Growth of Outsourcing Traditionally to control costs dealing with rapid technological change Today Traditional reasons still valid Part of overall IT strategy On Demand

14 Outsourcing The Growth of Outsourcing A firm that offers outsourcing solutions is called a service provider Application service providers (ASP) Internet business services (IBS) Also called managed hosting

15 Outsourcing Outsourcing Fees Fixed Fee model A subscription model A usage model or transaction model

16 Outsourcing Outsourcing Issues and Concerns Mission-critical IT systems Day-to-day company operations Company whose volume fluctuates widely

17 Outsourcing In considering Outsourcing Check ASP’s History Advantages of Outsourcing Potential Risks of Outsourcing

18 Outsourcing Offshore Outsourcing Firms send IT work overseas at increasing rate Gartner predicts that by 2005 (in U.S.) … 1 in 10 IT jobs at IT companies will move offshore 1 in 20 IT jobs at non-IT companies will move offshore

19 In-House Software Development Options Make/Buy (Build/Buy) Decision Most important consideration is total cost of ownership (TCO) Commercial software packages

20 In-House Software Development Options Make or Buy Decision Companies that develop software for sale are called software vendors Value-added reseller (VAR) Horizontal application Vertical application

21 In-House Software Development Options Developing Software In-House Satisfy unique business requirements Minimize changes in business procedures and policies Meet constraints of existing systems Meet constraints of existing technology Develop internal resources and capabilities

22 In-House Software Development Options Purchasing a Software Package Lower costs Requires less time to implement Proven reliability and performance benchmarks Requires less technical development staff Future upgrades provided by the vendor Input from other companies

23 In-House Software Development Options

24 In-House Software Development Options Customizing a Software Package – 3 Ways Purchase and have vendor(s) customize Negotiate directly with software vendor to make changes Purchase and make your own modifications

25 In-House Software Development Options Creating User Applications A user application utilizes standard business software User interface Help desk or information center (IC) Screen generators Report generators Read-only properties

26 Role of the Systems Analyst Evaluation and Selection team Primary objective Eliminate system alternatives that will not work Rank system alternatives that will work Present viable alternatives to management for final decision

27 Analyzing Cost and Benefits Financial Analysis Tools Payback Analysis Return on investment (ROI) Net present value (NPV)

28 Analyzing Cost and Benefits Cost-Benefit Analysis Checklist List each development strategy being considered Identify all costs and benefits for each alternative Indicate when costs will be incurred and benefits realized Consider future growth and the need for scalability Include support costs for hardware and software Apply the financial analysis tools to each alternative Study the results and prepare a report to management

29 The Software Acquisition Process Step 1: Evaluate the Information System Requirements Prepare a request for proposal or quotation Request for proposal (RFP) Evaluation model Request for quotation (RFQ)

30 The Software Acquisition Process Step 2: Identify Potential Vendors or Outsourcing Options The Internet is a primary marketplace Another approach is to work with a consulting firm Another resource is the Internet bulletin board system that contains thousands of forums, called newsgroups

31 The Software Acquisition Process Step 3: Evaluate the Alternatives Existing users Application testing Benchmarking - benchmark Match each package against the RFP features and rank the choices

32 The Software Acquisition Process Step 4: Perform Cost-Benefit Analysis Identify and calculate TCO for each option you are considering When you purchase software, what you are buying is a software license If you purchase a software package, consider a supplemental maintenance agreement

33 The Software Acquisition Process Step 5: Prepare a Recommendation You should prepare a recommendation that evaluates and describes the alternatives, together with the costs, benefits, advantages, and disadvantages of each option At this point, you may be required to submit a formal system requirements document and deliver a presentation

34 The Software Acquisition Process Step 6: Implement the Solution Implementation tasks will depend on the solution selected Before the new software becomes operational, you must complete all implementation steps, including loading, configuring, and testing the software; training users; and converting data files to the new system’s format

35 Completion of Systems Analysis Tasks System Requirements Document The system requirements document, or software requirements specification, contains the requirements for the new system, describes the alternatives that were considered, and makes a specific recommendation to management Like a contract Format and organize it so it is easy to read and use

36 Completion of Systems Analysis Tasks Presentation to Management Begin your presentation with a brief overview of the purpose and primary objectives of the system project, the objectives of this presentation, and what decisions need to made Summarize the primary viable alternatives. For each alternative, describe the costs, advantages, and disadvantages

37 Completion of Systems Analysis Tasks Presentation to Management Explain why the evaluation and selection team chose the recommended alternative Allow time for discussion and for questions and answers Obtain a final decision from management or agree on a timetable for the next step in the process

38 Completion of Systems Analysis Tasks Presentation to Management Based on their decision, your next task will be one of the following Implement an outsourcing alternative Develop an in-house system Purchase or customize a software package Perform additional systems analysis work Stop all further work

39 The Transition to Systems Design If management decides to develop the system in-house, then the transition to the systems design phase begins Preparing for Systems Design Tasks It is essential to have an accurate and understandable system requirements document

40 The Transition to Systems Design The Relationship between Logical and Physical Design The logical design defines the functions and features of the system and the relationships among its components The physical design of an information system is a plan for the actual implementation of the system

41 Systems Design Guidelines The systems analyst must understand the logical design of the system before beginning the physical design of any one component Data design User interface Systems design specification

42 Systems Design Guidelines Systems Design Objectives The goal of systems design is to build a system that is effective, reliable, and maintainable

43 Systems Design Guidelines System Design Objectives User Considerations Data Considerations Data should be entered into the system where and when it occurs because delays cause data errors Data should be verified when entered to catch errors immediately Automated methods of data entry should be used whenever possible Access for data entry should be controlled and all entries or changes to critical data values should be reported – audit trails

44 Systems Design Guidelines System Design Objectives Data Considerations Data should be entered into a system only once Data duplication should be avoided Architecture considerations Use a modular design Design modules that perform a single function are easier to understand, implement, and maintain

45 Systems Design Guidelines Design Trade-Offs Design goals often conflict with each other Most design trade-off decisions that you will face come down to the basic conflict of quality versus cost Avoid decisions that achieve short-term savings but might mean higher costs later

46 Prototyping Prototyping produces an early, rapidly constructed working version of the proposed information system, called a prototype Prototyping Methods System prototyping Design prototyping Throwaway prototyping

47 Prototyping Prototyping Methods Prototyping offers many benefits Users and systems developers can avoid misunderstandings Managers can evaluate a working model more effectively than a paper specification Consider potential problems The rapid pace of development can create quality problems In very complex systems, the prototype becomes unwieldy and difficult to manage

48 Prototyping Prototyping Tools Systems analysts can use powerful tools to develop prototypes CASE tools Application generators Report generators Screen generators Fourth-generation language (4GL) Fourth-generation environment

49 Prototyping Limitations of Prototypes A prototype is a functioning system, but it is less efficient than a fully developed system Systems developers can upgrade the prototype into the final information system by adding the necessary capability Otherwise, the prototype is discarded Other Modeling Tools Systems flowchart American National Standards Institute (ANSI)

50 Chapter Summary This chapter describes system development strategies, the preparation and presentation of the system requirements document, and the transition to the systems design phase of the SDLC An important trend that views software as a service, rather than a product, has created new software acquisition options Systems analysts must consider Web-based development environments

51 Chapter Summary The systems analyst’s role in the software development process depends on the specific development strategy The most important factor in choosing a development strategy is total cost of ownership (TCO) The process of acquiring software involves a series of steps Any questions?