Regression with Time Series Data

Slides:



Advertisements
Similar presentations
FINANCIAL TIME-SERIES ECONOMETRICS SUN LIJIAN Feb 23,2001.
Advertisements

Cointegration and Error Correction Models
Autocorrelation Functions and ARIMA Modelling
Functional Form and Dynamic Models
Time-series analysis.
Autoregressive Integrated Moving Average (ARIMA) models
Stationary Time Series
Time Series Analysis -- An Introduction -- AMS 586 Week 2: 2/4,6/2014.
Part 25: Time Series 25-1/25 Econometrics I Professor William Greene Stern School of Business Department of Economics.
Review of Unit Root Testing D. A. Dickey North Carolina State University.
Copyright(© MTS-2002GG): You are free to use and modify these slides for educational purposes, but please if you improve this material send us your new.
Nonstationary Time Series Data and Cointegration
DSCI 5340: Predictive Modeling and Business Forecasting Spring 2013 – Dr. Nick Evangelopoulos Exam 1 review: Quizzes 1-6.
Long run models in economics Professor Bill Mitchell Director, Centre of Full Employment and Equity School of Economics University of Newcastle Australia.
Economics 20 - Prof. Anderson1 Stationary Stochastic Process A stochastic process is stationary if for every collection of time indices 1 ≤ t 1 < …< t.
Using SAS for Time Series Data
STATIONARY AND NONSTATIONARY TIME SERIES
Nonstationary Time Series Data and Cointegration Prepared by Vera Tabakova, East Carolina University.
Unit Root Tests: Methods and Problems
Nonstationary Time Series Data and Cointegration ECON 6002 Econometrics Memorial University of Newfoundland Adapted from Vera Tabakova’s notes.
Non-stationary data series
Lecture 24 Univariate Time Series
Economics 20 - Prof. Anderson1 Testing for Unit Roots Consider an AR(1): y t =  +  y t-1 + e t Let H 0 :  = 1, (assume there is a unit root) Define.
Economics 20 - Prof. Anderson1 Time Series Data y t =  0 +  1 x t  k x tk + u t 2. Further Issues.
1 MF-852 Financial Econometrics Lecture 11 Distributed Lags and Unit Roots Roy J. Epstein Fall 2003.
1 CHAPTER 10 FORECASTING THE LONG TERM: DETERMINISTIC AND STOCHASTIC TRENDS Figure 10.1 Economic Time Series with Trends González-Rivera: Forecasting for.
Financial Econometrics
Unit Roots & Forecasting
Slide 1 DSCI 5340: Predictive Modeling and Business Forecasting Spring 2013 – Dr. Nick Evangelopoulos Lecture 7: Box-Jenkins Models – Part II (Ch. 9) Material.
Regression with Time-Series Data: Nonstationary Variables
Time Series Building 1. Model Identification
10 Further Time Series OLS Issues Chapter 10 covered OLS properties for finite (small) sample time series data -If our Chapter 10 assumptions fail, we.
Stationary Stochastic Process
1Prof. Dr. Rainer Stachuletz Testing for Unit Roots Consider an AR(1): y t =  +  y t-1 + e t Let H 0 :  = 1, (assume there is a unit root) Define 
Prediction and model selection
Chapter 11 Multiple Regression.
Economics 20 - Prof. Anderson
14 Vector Autoregressions, Unit Roots, and Cointegration.
1 Econometrics 1 Lecture 12 Checking Stationarity:Dealing with Numbers.
BOX JENKINS METHODOLOGY
STAT 497 LECTURE NOTES 2.
Cointegration in Single Equations: Lecture 6 Statistical Tests for Cointegration Thomas 15.2 Testing for cointegration between two variables Cointegration.
FAME Time Series Econometrics Daniel V. Gordon Department of Economics University of Calgary.
The Properties of Time Series: Lecture 4 Previously introduced AR(1) model X t = φX t-1 + u t (1) (a) White Noise (stationary/no unit root) X t = u t i.e.
Week 21 Stochastic Process - Introduction Stochastic processes are processes that proceed randomly in time. Rather than consider fixed random variables.
How do we identify non-stationary processes? (A) Informal methods Thomas 14.1 Plot time series Correlogram (B) Formal Methods Statistical test for stationarity.
Dynamic Models, Autocorrelation and Forecasting ECON 6002 Econometrics Memorial University of Newfoundland Adapted from Vera Tabakova’s notes.
Chap 9 Regression with Time Series Data: Stationary Variables
Review and Summary Box-Jenkins models Stationary Time series AR(p), MA(q), ARMA(p,q)
Previously Definition of a stationary process (A) Constant mean (B) Constant variance (C) Constant covariance White Noise Process:Example of Stationary.
MODELS FOR NONSTATIONARY TIME SERIES By Eni Sumarminingsih, SSi, MM.
Module 4 Forecasting Multiple Variables from their own Histories EC 827.
Cointegration in Single Equations: Lecture 5
Components of Time Series Su, Chapter 2, section II.
Stationarity and Unit Root Testing Dr. Thomas Kigabo RUSUHUZWA.
1 Lecture Plan : Statistical trading models for energy futures.: Stochastic Processes and Market Efficiency Trading Models Long/Short one.
Stochastic Process - Introduction
Nonstationary Time Series Data and Cointegration
Financial Econometrics Lecture Notes 2
Chapter 6: Autoregressive Integrated Moving Average (ARIMA) Models
Applied Econometric Time-Series Data Analysis
CHAPTER 16 ECONOMIC FORECASTING Damodar Gujarati
STATIONARY AND NONSTATIONARY TIME SERIES
Unit Roots 31/12/2018.
Unit Root & Augmented Dickey-Fuller (ADF) Test
Econometrics I Professor William Greene Stern School of Business
Econometrics Chengyuan Yin School of Mathematics.
CH2 Time series.
BOX JENKINS (ARIMA) METHODOLOGY
Stationary Stochastic Process
Presentation transcript:

Regression with Time Series Data Judge et al Chapter 15 and 16

Distributed Lag

Polynomial distributed lag

Estimating a polynomial distributed lag

Geometric Lag Impact Multiplier: change in yt when xt changes by one unit: If change in xt is sustained for another period: Long-run multiplier:

The Koyck Transformation

Autoregressive distributed lag ARDL(1,1) ARDL(p,q) Represents an infinite distributed lag with weights: Approximates an infinite lag of any shape when p and q are large.

Stationarity The usual properties of the least squares estimator in a regression using time series data depend on the assumption that the variables involved are stationary stochastic processes. A series is stationary if its mean and variance are constant over time, and the covariance between two values depends only on the length of time separating the two values

Stationary Processes

Non-stationary processes

Non-stationary processes with drift

Summary of time series processes Random walk Random walk with drift Deterministic trend

Trends Stochastic trend Deterministic trend Random walk Series has a unit root Series is integrated I(1) Can be made stationary only by first differencing Deterministic trend Series can be made stationary either by first differencing or by subtracting a deterministic trend.

Real data

Spurious correlation Two random walks we observed earlier.

Spurious regression R2 0.7495 D-W 0.0305 Variable DF B Value Std Error T ratio Approx prob Intercept 1 14.204040 0.5429 26.162 0.0001 RW2 -0.526263 0.00963 -54.667 R2 0.7495 D-W 0.0305

Checking/testing for stationarity Correlogram Shows partial correlation observations at increasing intervals. If stationary these die away. Box-Pierce Ljung-Box Unit root tests

Unit root test If || < 1, then the AR(1) process is stationary. We can test for nonstationarity by testing the null hypothesis that  = 1 against the alternative that , or simply  < 1.

Dickey Fuller Tests Allow for a number of possible models Drift Deterministic trend Account for serial correlation Drift Drift against deterministic trend Adjusting for serial correlation (ADF)

Critical values Table 16.4 Critical Values for the Dickey-Fuller Test Model 1% 5% 10% 2.56 1.94 1.62 3.43 2.86 2.57 3.96 3.41 3.13 Standard critical values 2.33 1.65 1.28

Example of a Dickey Fuller Test

Cointegration In general non-stationary variables should not be used in regression. In general a linear combination of I(1) series, eg: is I(1). If et is I(0) xt and yt are cointegrated and the regression is not spurious et can be interpreted as the error in a long-run equilibrium.

Example of a cointegration test Model 1% 5% 10% 3.90 3.34 3.04