N.Solyak, RTML IntroductionILC LET workshop, CERN, June 23-25, 2009 1 ILC RTML Introduction Nikolay Solyak Fermilab RTML function and RDR design Minimum.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

ILC Accelerator School Kyungpook National University
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Issues in ILC Main Linac and Bunch Compressor from Beam dynamics N. Solyak, A. Latina, K.Kubo.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Global Design Effort Dubna, 5 June 2008 Part I of Summary for WG C/D Conveners: Ewan Paterson (SLAC), Nikolay Solyak (FNAL), Andrei Seryi (SLAC), Masao.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
Simulations Group Summary K. Kubo, D. Schulte, N. Solyak for the beam dynamics working group.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
16 August 2005PT for US BC Task Force1 Two Stage Bunch Compressor Proposal Snowmass WG1 “It’s the latest wave That you’ve been craving for The old ideal.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
RTML Kick-Off Meeting Global Design Effort 1 Reference Design of the ILC RTML PT SLAC.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
RTML Kick-Off Meeting Global Design Effort 1 RTML N.Solyak Outline RTML RDR Design Technical Systems Cost breakdown and Risks Summary from RTML KOM Proposal.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 ILC RTML overview Nikolay Solyak Fermilab RTML Lattice update in TDR Emittance preservation overview Other effects Conclusion ECFA Linear Collider Workshop.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
N.Solyak, RTMLILC AD&I meeting, DESY, May 28-29, Single-stage Bunch Compressor Nikolay Solyak Fermilab.
Ring to Main Linac (RTML): Status and Plans ILC January Meeting (KEK) Peter Tenenbaum 19-Jan-2006.
GDE Main Linac and RTML Beam Dynamics Conveners: Nikolay Solyak, Cris Adolphsen, Kyioshi Kubo April 20, Room 303, 14:30 – 18:00.
Status of RTML design in TDR configuration A.Vivoli, N. Solyak, V. Kapin Fermilab.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Emittance preservation in the RTML of ILC and CLIC Andrea Latina (CERN) Nikolay Solyak (FNAL) LCWS University of Texas at Arlington - Oct
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
N.Solyak, RTMLCLIC 08, CERN, Oct , RTML Design and Rational for ILC Nikolay Solyak Fermilab CLIC 08 workshop, CERN, Oct , 2008.
Wakefield effect in ATF2 Kiyoshi Kubo
N.Solyak, RTML OverviewBTW review, DESY, Oct , ILC RTML overview Nikolay Solyak Fermilab RTML functions, RDR and SB2009 designs Beamlines.
N.Solyak, RTMLLCWS’08, Chicago Nov.16-20, RTML progress 2008 Nikolay Solyak.
N.Solyak, RTMLLCWS'11, Sept.26-30, Granada 1 Nikolay Solyak, Valery Kapin FERMILAB * CERN RTML upgrade New design of ILC RTML in central integration region.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
ILC Main Linac Beam Dynamics Review K. Kubo.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Third ILC Damping Rings R&D Mini-Workshop KEK, Tsukuba, Japan December 2007 Choosing the Baseline Lattice for the Engineering Design Phase Andy Wolski.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
ILC Z-pole Calibration Runs Main Linac performance
SC Quadrupole Magnets in ILC Cryomodules
CLIC Damping ring beam transfer systems
Large Booster and Collider Ring
Status and Plan of GDE Design Work (Including Road Map for RDR)
RTML Design and Cost reduction Nikolay Solyak Fermilab
AD & I : BDS Lattice Design Changes
RTML and Main Linac Design (2.6.1 and 2.7.1)
AAP Review, Tsukuba April.17-21, 2009
Electron Source Configuration
ILC - Global Design Effort
Kicker and RF systems for Damping Rings
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Presentation transcript:

N.Solyak, RTML IntroductionILC LET workshop, CERN, June 23-25, ILC RTML Introduction Nikolay Solyak Fermilab RTML function and RDR design Minimum machine and Single-stage BC Emittance preservation in RTML Stray magnetic fields studies Slow ground motion Studies at FNAL Summary

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Note: e- and e+ RTMLs have minor differences in Return line (undulator in e- linac side), they are otherwise identical. BDS RTML/Source tunnel Areas, where tunnel length saving is possible Same curved tunnel ~12 km (RTML/ML) 1254 m 1208 m RTML Schematic (RDR) RTML Laser Straight tunnel

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, RTML Functions Transport Beam from DR to ML –Match Geometry/Optics Collimate Halo Rotate Spin Compress Bunch Preserve Emittance –vertical norm. emittance < 4nm Protect Machine –3 Tune-up / MPS abort dumps Additional constraint: –Share the tunnel with e-,e+injectors –Need to keep geometries synchronized

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, RTML Optics Design (RDR) DRX connection Vertical plane Horizontal plane Horizontal Arc out of DR ~1.1 km straight –In injector tunnel “Escalator” ~0.6 km vertical dogleg down to linac tunnel Return line ( weak FODO lattice ) ~13km –In linac tunnel –Vertically curved Vertical and horizontal doglegs Turnaround 8° arc in spin rotators BCs are net straight ML launch DR-RTML hand-off point defined extraction point where η,η’  0 RTML mostly defined by need to follow LTR geometry Stay in same tunnel Design is OK at conceptual level DRX+ arc

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, DR connection (RDR) Both sides have CMs for sources e + side also have KAS and e + transfer line from undulator

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, DRX Connection Current design is entirely planar (horizontal plane) DRs are in different planes Sources need cryomodules and SC solenoids –Big heavy objects which want to sit on the floor Working agreement between sources, DR, RTML, CFS: –CMs and SC solenoids always sit on floor –RTML hangs from source tunnel ceiling at same location as in linac tunnel DR Tunnel – 1.44 m Vertical separation ML Tunnel m Vertical beam separation e+e+ e-e- DR tunnel e- e+ e - src e+ RTML e - RTML e + src

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, “Getaway” Straight (or “DR Stretch”) About 1.1 km long Has two parts –“Low-beta” region with decoupling and emittance measurement –“High-beta” region with collimation system Includes PPS stoppers –For segmentation Good conceptual design –Need to match exact required system lengths –Need to consider conflicts with source beamlines in this area –Beta match between low- and high-beta optics not great Beam collimation Energy collimation Diagnostics: Emittance meas

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Escalator Vertical dogleg –Descends 7.85 meters over ~590 m –Uses 2 vertical arcs separated by weak FODO lattice Good conceptual design –Escalator-linac tunnel connection does not match CFS design –Uses Keil-style eta matching –Beta match between “strong” and “weak” lattices not great –Positron return line confilicts? Need to make match according CFS (new?) design

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Return Line Weak FODO lattice at ML ceiling elevation (1Q/~36m) Vertically curved tunnel thru ML area –Dispersion matching via dipole correctors Laser-straight tunnel thru BC area Electron line 1.2 km longer than positron –Goes thru undulator area System lengths probably not exactly right Electron Return line and positron transfer line need to be exchanged e- ML Undulator400 MeV e+ e- Return

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Turnaround Actually does 3 jobs –Turns the beam around Note: need to bend away from service tunnel –Brings beam down from ceiling to linac elevation (near floor) Vertical dogleg –Adjusts x position to meet linac line Horizontal dogleg –Order: H dogleg, V dogleg, turnaround –Packing area, ~90% magnets Spin Rotator

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Spin Rotation Design based on Emma’s from NLC ZDR –2 solenoids with Emma rotator between them Rotate spin 90° in xy plane while cancelling coupling –8° arc Rotate spin 90° in xz plane –Another 2 solenoids + Emma rotator Basic design seems sound –Very small loss in polarization from vertical bending in linac tunnel Important issue = bandwidth –Off-energy particles don’t get perfect cancellation of dispersion and coupling

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, ILC Baseline 2-stage Bunch Compressor Longitudinal emittance out of DR: –6mm (or 9 mm) RMS length –0.15% RMS energy spread Want to go down to mm Need some adjustability Use 2-stage BC to limit max energy spread –1 st : Compress to 1 mm at 5 GeV –2 nd : Accelerate to 15 GeV and Compress to final bunch length Both stages use 6-cell lattice with quads and bends to achieve momentum compaction (wiggler) –Magnet aperture ~ 40cm Total Length ~1100 m (incl. matching and beam extraction lines) Minimum design is possible if assume compression 6  0.3 mm only Shorter 2-stage BC Or short single-stage BC Cheaper magnets RF system BC1: 3 CMs with quads/each (+spare kly) BC2: 14 RFunits (3CM’s each)+1spare Total 48 CM’s per side One wiggler cell RF1 RF2 Wiggler 1 Wiggler 2

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Cost and its Distribution CFS + BC RF system = 68% of costs –Correlated – much of CFS cost is housing for BC cryomodules Remainder dominated by RT beam transport –Quads, correctors, BPMs, vacuum system Small amount of “exotica” –Non-BPM instrumentation, controls, dumps, collimators

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, RTML Risk Analysis (2007) (1) Packing fraction to tight (Turn-around)Q*Med12 (2) Beam Motion at end of RTML Too LargeLow2 (3) Optical Effects in RTMLLow5 (4) Space charge tune shift in RTMLMed5 (5) Ion Instability in e- lineLow5 (6) Collimator WakefieldsLow5 (7) Emittance Dilution : MagnetostaticsHigh10 (8) Emittance Dilution Pitched RF CavitiesHigh20 (9) Bunch Compressor Phase StabilityMed60 (10) Performance of Feed-forward Med? Risk Cost *Q - CONCERNS REQUIRING SIGNIFICANT CF&S MODIFICATIONS AND DECISIONS EITHER DURING EDR OR SHORTLY THEREAFTER

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Minimum Machine configuration Cost-reduction strategy (2009) Major changes vs. Baseline configuration –ML removal of the underground service tunnel (single underground tunnel housing the accelerator); klystron cluster concept (RF power distribution alternative); processed water cooling specifications (higher ΔT solutions). –DR Shorter DR for Low power option (1320 bunches vs. 1625) –RTML Single stage BC, Remove one Extraction Line with dump –Source and BDS Integration (Central Region) Move undulator to 250 GeV 10% KAS Sources, undulator and 5 GeV e+/e- Linacs in BDS tunnel Shorter BDS

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, RTML changes in Minimum Machine Configuration The RTML two-stage Bunch Compressor (top) and a possible short single-stage compressor (bottom). Lengths compared for 15 GeV. ~ m G=31 MV/m Phase = -5 deg 14+1 RF Units (45CMs) 14 RF Units (42 CMs) 4.6 GeV Main Linac Single-stage BC is possible, if not support flexibility of parameter set Changes from RDR: 9(6)mm  0.3(0.2)mm to 6mm  0.3mm (x20 co mpression )  Reduction in beamline and associated tunnel length by an equivalent of ~ m (including some in SCRF linac)  Removal of the second 220 kW dump and dump line components  Shortening of the diagnostics sections (lower energy) 12 RF (36 CMs) 2 RF 1 RF

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Single-Stage BC Lattice Bunch Length: - 6 mm → 0.3 mm Total length = 423 m - RF Section - Wiggler - Diagnostics & EL - Matching section Final energy 4.3 GeV Pre-Linac: 4.3 GeV  15 GeV Based on the original design, proposed by PT et al. in April 2005: PT lattice is modified to improve performances: CM-3  CM-4 Wiggler  wiggler 2007 PT/Seletskyi (see: A.Latina talk)

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Design Characteristics 423 m E N GeV

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, ELBC2 length ~25 m (longest one) 6 septum+6 bends+12 quads, two collimators: 5.2 kW (protect quads) and 14.1 kW (dump window) 10 fast kickers and pulsed bend in the main beamline to extract beam Beam dump GeV 0.15% (green) and 1.8% (red) energy spread 2 coll1 collNo coll Final quads 1T 45mm 2T 80mm Collimat5.2 kW 14.1kW 5.2kWNo coll Dump window 12.5 cm30 cm 100 cm Defocus Removing of ELBC2 and dump

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, ~220kW Aluminum Ball Dumps Cost (~$1M each) is dominated by: –3-loop radioactive water processing system –The CFS infrastructure, shielding, etc. Similar dumps in use at SLAC 50cm Diameter x 2m long Aluminum Ball Dump with Local Shielding RW 50kW 3-loop 2006 Rad Water Cooling for ISIS Neutron Spallation Targets Remove 2 Dumps after BC2

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Re-design of the ELBC1 Motivation: Accommodation of larger energy spread (3.6 % vs. 2.5% in previous design) –For the beam with high energy spread, there is a substantial blowup in the beam size from chromaticity and nonlinear dispersion at the end of the beamline. Few options were studied (TILC09, S.Seletskiy) –No collimation, sextupoles at the beginning/end –No collimation, sextupoles at the end –Weak collimation and Sextupole –Strong collimation with 2 collimators Needs more studies with experts to choose final design. Decision for the final design must be taken through cost optimization process. See more details in S.Seletskyi talk

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, ILC New Damping Ring New ILC DR lattice is shorter. Bunch length = 6 mm; Energy spread = 0.13 % In old RDR design: 9 mm (easy) 6 mm (more challenge) New DR increases the length of the RTML linac in each side (e + and e -) of ~300 m, but not CFS Need redesign/adjust DRX lattice to accommodate changes in DR Compact DR (S.Guiducci, DESY AD&I) - SB 2009 (DSB) – 3.2 km (half- number of bunches) Injection Extraction Injection 300 m Layout of the ILC Damping Ring blue - RDR (2007); red - new DCO (Feb.2008)

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Estimated Cost impact CFS: reduction of tunnels: –210 m of regular tunnel –No service tunnel –No alcoves for 2 extraction lines and dumps (radiation area) –Possible more saving in tunnel in central area Cost reduction due to reduction of hardware components (~30-40 M$) –12 CMs –8 klystrons/modulator/PDS –2 extraction lines with 2 beam dumps –Magnets, fast kickers, septums, PS –Diagnostics: LOLA cavities, BPMs, etc.. –Vacuum components

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, RTML in Central Area New configuration of the Central Area and DR design will require changes in RTML design –Need to complete configuration ASAP. It will be basis for RTML lattice design work and cost estimation Expected incremental cost due to this changes will be small Biggest impact on CFS (tunnel)

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Emittance Growth in RTML Region BBA methodDispersive or chromatic mean emittance growth Coupling mean emittance growth Return LineKM and FF to remove beam jitter 0.15 nm 2 nm (with correction) Turn around Spin rotator KM and Skew coupling correction 1.52 nm (mostly chromatic) 0.4 nm (after correction) Bunch Compressor KM or DFS and Dispersion bumps >5 nm (KM+bumps) 2.7 nm (DFS+bumps) 0.6 nm (w/o correction) Total~5 nm almost all from BC3nm (w/o complete correction) Effect of coupler RF kick & wakes is not included Dynamic effects are not included Emittance growth is large (pre-RDR budget 4nm, might be ≤10nm) Need further studies to reach goal for emittance growth Cross-checking with different codes (important) Summary of Studies before MM (LET meeting, Dec.2007 SLAC)

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Simulations of Coupler Kick and Wakes W x (s)-solid,,W y (s)-dashed for σ z = 300 μm. On-axis kick factor vs. σ z bunch shape The couplers break the RF field symmetry and cause transverse RF kick and Wakes DESY,2007. Simulations DESY/FNAL/SLAC The profiles of the 3 couplers, as seen from the downstream end. Upstream HOM coupler Downstream HOM coupler Main coupler RF cavity ~20% Total RF KICK FNAL Q=3.5  10 6 HFSS DESY Q=2.5  10 6 MAFIA SLAC Q=3.5  10 6 OMEGA3P 10 6 · (V x /V z ) i i i* 10 6 · (V y /V z ) i i i Coupler Transverse Wakefield Effect of couplers on emittance growth see in V.Yakovlev talk

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Coupler and Misalignments in BC1S BC1S (incl. diagnistics+matching+Pre-linac (5  15 GeV)) Standard misalignments (300 um/300urad); ISR +coupler RF kick/wake 1-to-1, DFS and bumps, girder optimization 10 nm 5 nm 2.6 nm 2.2 nm from coupler only Girder Pitch optimization Y- micromover: - Range 300 um - Step size 10 um #N of adjustable CM’s RF section of BC1S - 1 every 2 (total 3) Pre-linac: 1 every 12 CM’s (total 3) New proposal !!!

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Emittance Growth in Bunch Compressor Emittance growth due to misalignments and couplers seems to compensated both for BS1S and BC1+BC2 Girder pitch optimization is very effective to counteract coupler kicks, both for BS1S and BC1+BC2 In BC1S, Crab Cavity seems to be similar effective, but it would require a new hardware and slight redesign of the cryomoodule A.Latina, TILC09

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Stray magnetic fields (2) RTML requirement for high frequency stray magnetic fields: B < 2 nT (K.Kubo, 2006) Magnetic field examples –Commercial SC solenoid – 10 Tesla (1 e+1) –Earth magnetic field – 50 micro-Tesla (5 e-5) –Cell phone– 100 nano-Tesla (1 e-7) –Beating human heart – ~ 10 pico-Tesla (1 e-11) Frequency dependence –< 0.1 Hz (can be compensated by control system) –> 100 kHz (attenuated in the structure) Classification (following F.R.T.) –60 Hz and its harmonics (near-coherent with 5-Hz pulsing) –Fields from RF systems (coherent with 5-Hz pulsing) –Others (non-RF technical sources) (uncorrelated with pulses) Previous work - “Sensitivity to Nano-Tesla Scale Stray Magnetic Fields”, SLAC LCC Note-0140 (June 7, 2004)  Data from SLC End station B. Conclusion (for NLC): we are mostly OK - DESY (TESLA TDR study)

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Stray Magnetic Field studies 2007 plans RTML needs to transport low-emittance 5 GeV beam over ~15 km from DR to ML. RDR requirement on stray magnetic fields in the RTML is less than 2 nT. Proposal summary: Evaluate possible sources of the stray fields; consider effects of correlated and uncorrelated (with the beam cycle) sources. Survey the existing sites to verify assumptions in that analysis. If the result of this study would require, propose shielding approach for the beam pipe. Develop a stray field model suitable for incorporation into linac simulation frameworks. Implementation plan (2007): Anticipated duration of this work is two years. The scope of the work can be subdivided in the following interleaving parts: 1. Evaluate the expected magnetic field from multiple sources in the RTML environment: 1.1 Correlated sources: RF systems. 1.2 Power-line (60 Hz) and its harmonics. 1.3 Miscellaneous random noise 2. Survey multiple sites in existing installations (Fermilab, CERN, SLAC, etc..) to verify assumptions in stray field model. To accurately measure magnetic field in a wide range of frequencies and amplitudes from 10 microtesla (Earth magnetic field) to below nT is a challenge. We will need to develop a system that can perform this task.

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Magnetic Stray Fields Studies Hardware: 3-axis fluxgate magnetometer 0.1mT full scale DC to 3 kHz 20 pT/sqrt(Hz) Measurement: Near klystron In shielded cave (20m from kly) Klystron On/Off Fermilab A0 experimental area with cryogenic and 5 MW klystron/modulator RTML requirement for stray fields in Return Line 1Hz) SLAC measurements (at Station A) are promising (~2nT) Need more studies for different sites. Stability of 60Hz is an issue

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Total integrated field ~9 nT ( >1Hz ) Only 60/180/300 Hz peaks are removed 15, 30 and 45 Hz (Linac & Booster) ~ 5nT Other harmonics 120/180 /240Hz)~ 2nT All the rest ~ 2 nT Spectrogram and Integrated spectrum 5MW Klystron Modulator Transformer Cryogenic Pumps Power Supplies Tevatron shaft Etc… Stray magnetic fields measurements at A0: A0 - Noisy place More details in D.Sergatskov talk Mu-metal shielding will help to reduce fields !

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Vacuum system for RTML Return line Tight vacuum req. in Return Line (<10nTorr) - Passivated SS, ID=35mm, in magnet ID=16mm - 86 curved strings followed by 8 straight strings; - 1 bellow/1 quad magnet - If one string uses vacuum breaker, the next string uses gate valve. Final Report with Cost estimation (Xiao Qiong, IHEP/China)

N.Solyak, RTML IntroductionILC LET workshop, CERN, June 23-25, Slow Ground Motion and Vibration Studies at Fermilab Goal: Collect data and Study long term stability (different scales: day, month season, years) of the surface and deep tunnel. Analyze sources of ground motion including technical noise.

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, HLS systems at FNAL MINOS near detector –4 BINP sensors –30 meters apart, 100 meters deep –11 months of data North Aurora Mine with 6 sensors –6 BINP sensors –30 meters apart, 100 meter deep –10 months of data with 2 sensor 2 months of data with 6 sensors B0 and D0 interaction regions –8 BINP sensors each interaction region –On low beta quads and central detector –5 months of data A-F sectors –204 Balluff sensors one on each SC quad around the Tevatron –30 meters apart –5 months of data All are two pipe systems BINP sensor (parts) Fermilab Balluff sensor

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Difference in two sensors150 meters apart 18 months of data J T Volk Fermilab Dec 2008 Major Rain Event and Flooding in Mine

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Horizontal measurements Vertical measurements Seismometer measurements MINOS hall Vertical MINOS hall No LCW or fans A large spike at 10 and 20 Hz is apparent in the vertical it is assumed that this is due to vacuum and LCW systems in the decay tunnel. Seismic measurements made in the MINOS hall at depth of 100 meters.

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Ground Motion Summary There are several HLS system taking data at Fermilab –Aurora mine; MINOS hall; NML hall. They are accurate and reliable can run for several years. They are useful for determining ground motion and tilt. The data are available at; There are natural sources of motion: tides, rain fall, earth quakes both large and small. There are cultural sources such as sump pumps. Plans for new systems in the works. J.T. Volk, Fermilab

N.Solyak, RTML Introduction ILC LET Workshop CERN, June 23-25, Summary Single stage Bunch Compressor is designed and studied. Design looks feasible. Emittance growth in bunch compressor can be effectively controlled, by using movers to adjust tilt of the cryomodules. (only few CM’s with this features are needed). R&D is required. Extraction line is redesigned to accommodate bunch with a larger energy spread after BC Magnetic Stray Fields measurements under way. Results are promising (mu-metal shielding is helpful) Slow ground motion data are available for analysis of their effect on emittance growth.