BCF-262 EVMS Validation and Surveillance. BCF-262 DAU Catalog Description EVMS Validation and Surveillance The earned value management system (EVMS) validation.

Slides:



Advertisements
Similar presentations
1 NDIA Earned Value Management Application Guide Status Report May 3, 2005.
Advertisements

ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
1 EVM Policy July 2013 NAVY CEVM 2 Outline DoDI DFARS DFARS DFARS June 2012 AT&L Policy Letter.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
NASA Johnson Space Center Contracting Officer and Contracting Officer’s Technical Representative.
PROJECT MANAGEMENT FUNDAMENTALS. Nowadays, Project Management is not just for technical people or for people who handle technical projects. Executives.
Project Management Lecture 5+6 MS Saba Sahar.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
1 Navy Center for Earned Value Management (CEVM) January 2007.
Human Resources Management Course Objectives The purpose of this course is to learn the Project Management Institute (PMI) processes required to make.
PMP® Exam Preparation Course
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Dave Bachman DAU / CDSC September 9, 2004
Department’s Implementation of Supplier Earned Value Management System (EVMS) for Weapon System Acquisitions Presented To: NDIA Presented By: Mr Robert.
Presented to: NDIA PMSC By: Keith A. Kratzert Date: August 17, 2005 Federal Aviation Administration EVM at the FAA.
Presented to: NDIA PMSC By: Keith Kratzert Date: August 7, 2007 Federal Aviation Administration Improving Program Performance at FAA.
Revised Department of Defense Earned Value Management Policy Deborah A. Tomsic Senior Program Analyst Office of the Under Secretary of Defense (Acquisition,
OSD Earned Value Management Activities Update Larry L. Axtell Senior Program Analyst Office of the Under Secretary of Defense (Acquisition, Technology.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
1 Low Income Energy Efficiency Workforce Education & Training Project Workshop 5: Workforce Education & Training October 31, 2011 San Francisco.
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Surveillance Guide Overview May
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
NDIA Program Management Systems Committee APM Reciprocity Agreement GEIA Engineering Bulletin Progress Report August 21, 2004 Walt Berkey, Lockheed Martin.
Presented to: NDIA By: Keith Kratzert Date: August 16, 2006 Federal Aviation Administration Improving Program Performance at FAA.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
0 Office of Performance Assessments and Root Cause Analyses (PARCA) PARCA EVM Update Presenter: Phone:
Presented to: NDIA PMSC By: Keith Kratzert Date: May 21, 2009 Federal Aviation Administration Improving Program Performance at FAA.
Earned Value Management Presented By: Steve Krivokopich May , 2006.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Continuous Learning Module (CLM) Status Update Defense Acquisition University.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
Business, Cost Estimating, and Financial Management Presented by Ms. Sharon Jackson September 14, 2007.
Reviewer Training Welcome & Introductions Co-Chairs.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Validate Scope What we have: Requirement Traceability Matrix Verified Deliverables What we do: Inspection What we get: Accepted Deliverables.
Brookhaven Science Associates U.S. Department of Energy Facility Managers Meeting DOE-OECM Certification of Earned Value Management Systems April 27-28,
Department of Energy EVM Update NDIA Program Management Systems Committee August 17, 2005 Mike Donnelly Office of Engineering and Construction Management.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
EVM UPDATE JANUARY 31/FEBRUARY 2, EVM REQUIREMENTS NASA PROCEDURAL REQUIREMENTS (NPR) D - NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
Lab-Wide Earned Value Management System Project Core Team Meeting September 17, 2008 Dean A. Hoffer/Elaine McCluskey.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Supplier Management Can’t live with them, Can’t live without them!
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Presented to: NDIA PMSC By: Keith Kratzert Date: April 26, 2007 Federal Aviation Administration Improving Program Performance at FAA (and DOT)
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Today’s Summary Tab 4 Tab 6 Tab 2 Tabs 3 and 5 Defense Acquisition
Requirements Executive Overview Workshop Requirements Management Certification Training Mr. Matt Ghormley.
CME 250 – Course Introduction
Subcontracting SBP 210 Lesson 1: Introduction
Requirements and Acquisition Management
EVM 202—Lesson 5 EVMS Surveillance
EVM 202—Lesson 3 EVMS Guidelines and Compliance
Introduction to Internal Audits
CIS12-3 IT Project Management
Overview of Compliance, Surveillance, and Integrated Baseline Reviews
Project Integration Management
Project Integration Management
Presentation transcript:

BCF-262 EVMS Validation and Surveillance

BCF-262 DAU Catalog Description EVMS Validation and Surveillance The earned value management system (EVMS) validation and surveillance course provides knowledge needed to review integrated management systems and to determine their compliance with the American National Standards Institute / Electronic Industries Alliance EVMS (ANSI/EIA 748A) standard. Course material, individual exercises, and group exercises review in-depth the 32 ANSI/SIA 748 EVMS guidelines and the processes associated with validation and surveillance of contractor and government integrated management systems.

Objectives Students who successfully complete the course will be able to: –Interpret the management value, the intent, and the typical attributes for each of the thirty-two ANSI/EIA 748A EVMS guidelines –Understand the interrelationship of the guidelines, EVMS integrated management control systems and the nine EVM business processes –Understand validation and surveillance processes to be able to perform routine surveillance of existing EVM systems and to participate in EVMS validation reviews –Describe the progressive steps that should be taken to deal with EVMS non-compliance situations –Demonstrate interview techniques needed to conduct EVMS validation reviews and targeted surveillance –Understand DOD EVM Policy, method for implementing contractual requirements, and tailoring of contractual requirements for individual project risk.

Who Should Attend This assignment specific course is for personnel responsible for EVMS surveillance, EVMS validation, EVMS data analysts and project management personnel, contract administration, and contract auditing –Prerequisite: BCF 102 –Length: 9 class days –Class Size: 24 Students

Course Development Team

Current Status Modules have been developed Exercise documentation in final development –System Description, SOW, Contract SF 30, WBS & Dictionary, Org Charts, Schedule, RAM, Budget Logs, WADs, BCRs CAPs, CPRs, Internal Performance Reports, wInsight data, VARs, Validation Team Handbook Pilot Course scheduled April at DAU Formal offerings planned for FY07 and beyond will be based on demand