1/18 CMMI Risk Management Jense Seurynck Daan Van Britsom Risk Management.

Slides:



Advertisements
Similar presentations
Integrated Project Management IPM (Without IPPD) Intermediate Concepts of CMMI Project meets the organization Author: Kiril Karaatanasov
Advertisements

Process and Product Quality Assurance (PPQA)
For internal use Project Management at a glance - the ‘what’ and the ‘how’ Jørgen Nygaard Nielsen Dan Bandsholm Erensø PMD –
Copyright 2005 CMMI and ITIL Alison Adams & Kieran Doyle.
Copyright 2003 CMMI: Executive Briefing Presented by Kieran Doyle
Issue Tracking John D. McGregor Module 10 Session 1 Issue Tracking and Risk.
CMMI PMC Group Members Inam ul Haq Sajjad Raza Nabeel Azam
Capability Maturity Model Integration (CMMI). CMMI Enterprise-wide process improvement framework Focuses on processes for improved product Process areas:
200209–CSSA0001 – 16/27/ :25 PM CSSA Cepeda Systems & Software Analysis, Inc. GENERIC.
Process Area : Requirement Management (REQM) By: Amna Rehmat Maria Habib Sana Ahmed.
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
ESC/EN Engineering Process Compliance Procedures August 2002.
Release & Deployment ITIL Version 3
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Process: A Generic View
Capability Maturity Model Integrated
CMMI Course Summary CMMI course Module 9..
Capability Maturity Model Integration
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
Capability Maturity Model® Integration (CMMISM) Personal Prof. Dr. ir J. De Man CMMI (personal)
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 The Continuous Representation. 2 UNIT 2 Topics covered in this unit include Additional terminology Practices – The fundamental building blocks Process.
CMMi What is CMMi? Basic terms Levels Common Features Assessment process List of KPAs for each level.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Project Monitoring and Control 指導教授:李健興老師 學生:黃麟凱同學 學號: R 學號: R
1 / x Project Planning CMMI Project Planning Jean-Luc Deprez Robin Leblon.
『华东师范大学』 课程名称: 软件开发实践 Software Development Practice 课程类型: 实践课 第二讲: 项目管理 Lect_02: Manage the Project 主讲 : 软件学院 周勇 副 教授 日期 :
Project Planning Author : Software Engineering Institute Carnegie Mellon University 學生 : 吳與倫 老師:李健興 教授.
1 / x Verification CMMI Verification Hendrik van den Berge Kevin Mets.
Team Assignment 15 Team 04 Class K15T2. Agenda 1. Introduction 2. Measurement process 3. GQM 4. Strength Weakness of metrics.
Software Project Management
10/16/2015Bahill1 Organizational Innovation and Deployment Causal Analysis and Resolution 5 Optimizing 4 Quantitatively Managed 3 Defined 2 Managed Continuous.
Software process improvement Framework for SPI SPI support groups, maturity and immaturity models Assessment and gap analysis Education and training Selection.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Adaptive Processes Overview Adaptive Processes©. Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better2 Objective To provide an over view of.
Managing CMMI® as a Project
CMMI: PROCESS AND PRODUCT QUALITY ASSURANCE Lieven Lemiengre Thomas Spranghers.
Georgia Institute of Technology CS 4320 Fall 2003.
1 通信软件开发与管理 Course OD601 学时: 32 学分: 2 讲师:罗文彬. 2 Communication Overview System Architecture Overview Performance and Reliability Operation, Administration,
1 1 Major Changes in CMMI v1.3 Configuration Management Working Group April 12, 2011.
Everything You Ever Wanted to Know About CMMI in 30 Minutes or LESS CCS TECHNICAL SERVICES (484) CCS TECHNICAL SERVICES (484) William.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
FSA - The Financial Supervision Authority Nele Piir, Marge Laan, Kadri Toks.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
1 / x CMMI Measurement & Analysis Pieter Cailliau Stijn De Vos Measurement & Analysis.
Requirements Development in CMMI
1 Agenda for measurement r1. CMMI r2. Other thrusts.
1 / 25 IPM CMMI Integrated Project Management (IPM) Dieter De Paepe & Sarah Bourgeois.
1 / x CMMI Technical Solution Rob Vanden Meersche Dieter Van den Bulcke.
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
需求管理 Capability Maturity Model Integrated Author : Softare Engineering Institute Carnegie Mellon University.
Copyright © | Trade secret and confidential Page 1 Innovative, Professional, Fact Based and Eustressed© Maruthi Quality Management Services Ptv. Ltd..,
Advanced Project Management Project Planning Phase Ghazala Amin.
Pittsburgh, PA CMMI Acquisition Module - Page M5-1 CMMI ® Sponsored by the U.S. Department of Defense © 2005 by Carnegie Mellon University This.
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
CMMI1 Capability Maturity Model Integration Eyal Ben-Ari 8/2006.
MSA Orientation – v203a 1 What’s RIGHT with the CMMI?!? Pat O’Toole
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
CMMI Model overview Practical experience. Copyright © 2014 Accenture All rights reserved. 2 Education 2004 graduated LU, Faculty of Physics and Mathematics,
© 2004 Tangram Hi-Tech Solutions Project Management According to the CMMI1 Project Management according to the Capability Maturity Model (CMMI)
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
Issue Tracking and Risk Management John D. McGregor Module 10 Session 1 Issue Tracking and Risk.
A Comparison of CMMI & SPICE
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
CMMI – Staged Representation
Configuration Management
Requirements Development in CMMI
Presentation transcript:

1/18 CMMI Risk Management Jense Seurynck Daan Van Britsom Risk Management

2/18 Risk Management Purpose  At least be ready for the problems you can anticipate, so you’ll be able to handle the one’s you can’t. Risk Management

3/18 Risk Management Specific Goals  SG 1 Prepare for Risk Management n SP1.1 Determine Risk Sources and Categories One team has decided to divide the risks based on the components. n SP1.2 Define Risk Parameters All the teams use the same (mandatory) categorization for their risks, namely: Very Major, Major… n SP1.3 Establish a Risk Management Strategy Mandatory minimal Risk Management effort. Off the record it is commonly accepted that when a Very Major risk occurs, at least half the team ought to be working on it. Risk Management [1] Trac Risk List [2] Technology Innovation Risk Levels

4/18 Risk Management Specific Goals  SG 2 Identify and Analyze Risks n SP2.1 Identify Risks Risks are identified through brainstorming and individual suggestions. n SP2.2 Evaluate, Categorize, and Prioritize Risks Categorization by team knowhow. Prioritization by project impact. Risks are evaluated before and during review sessions. Risk Management [1] Trac Risk List [3] Review Meeting Risk Overview [1] Trac Risk List

5/18 Risk Management Specific Goals  SG 3 Mitigate Risks n SP3.1 Develop Risk Mitigation Plans Mitigation plans are developed through brainstorming. People are assigned responsibility for a risk. No contingency plans were found. n SP3.2 Implement Risk Mitigation Plans Every two weeks (review session) the risk status is updated. Risk Management [4] Risk Mitigation Plan [3] Review Meeting Risk Overview

6/18 Risk Management Generic Practices GG 2  GP2.1 Establish an Organizational Policy n The organizational policy had been suggested during the introduction lesson.  GP2.2 Plan the Process n One team uses Trac tickets for risks as well as standard tasks.  GP2.3 Provide Resources n Powerpoint (all teams) + Trac (1 team) -> “Risk database” Risk Management [2] Technology Innovation Risk Levels [6] Risk Trac Ticket [3] Review Meeting Risk Overview [5] Risk List Template [1] Trac Risk List

7/18 Risk Management Generic Practices GG 2 (2)  GP2.4 Assign Responsibility n During the team meetings people are assigned to the different risks.  GP2.5 Train People n Some training was provided during the introduction session and Softwaremanagement classes.  GP2.6 Manage Configurations n Trac / Powerpoint overview Risk Management [1] Trac Risk List [3] Review Meeting Risk Overview [5] Risk List Template [1] Trac Risk List [3] Review Meeting Risk Overview

8/18 Risk Management Generic Practices GG 2 (3)  GP2.7 Identify and Involve Relevant Stakeholders n Professor Gielen = “Quality assurance team” n Project Supervisor(s) = “Customer(s)”  GP2.8 Monitor and Control the Process n One team monitors risk mitigation effort.  GP2.9 Objectively Evaluate Adherence n Professor Gielen  GP2.10 Review Status with Higher Level Management n Review meetings Risk Management [3] Review Meeting Risk Overview [6] Risk Trac Ticket [3] Review Meeting Risk Overview

9/18 Risk Management Generic Practices GG 3  GP3.1 Establish a Defined Process n Introduction lesson.  GP3.2 Collect Improvement Information n Thanks to this exercise all projects receive feedback and are capable of improving the Risk Management activities in their project. Risk Management [this] [5] Risk List Template

10/18 Risk Management Process Assets Risk Management [1] Trac Risk List

11/18 Risk Management Process Assets Risk Management [2] Technology Innovation Risk Levels

12/18 Risk Management Process Assets Risk Management [3] Review Meeting Risk Overview

13/18 Risk Management Process Assets Risk Management [4] Risk Mitigation Plan

14/18 Risk Management Process Assets Risk Management [5] Risk List Template

15/18 Risk Management Process Assets Risk Management [6] Risk Trac Ticket

16/18 Risk Management Findings  Strengths n Organisational Risk Management Strategy: Continuously monitoring of risks.  Opportunities for Improvement n Automated risk management and alerts.  Proposed Actions n Trac risk tickets for effort monitoring + automatically generated warnings if too much effort is being spent. (i.e. The risk is getting out of control.) Risk Management

17/18 Risk Management Glossary  CMMICapability Maturity Model Integration  RSKMRisk Management Risk Management

18/18 Risk Management References  CMMI for Development version  Portal for the Software Development Project of Group 1  Portal for the Software Development Project of Group  Portal for the Software Development Project of Group  Portal for the Software Development Project of Group Risk Management