Managing Risk in Higher Education Adjusting a major flood claim - a university case study Maggie Cowing BSc(Hons) ACII FCILA.

Slides:



Advertisements
Similar presentations
CGU Padlock An innovative insurance solution for the Commercial Property Owner.
Advertisements

What every Adjuster needs to know
1 Beth McKillop, The British Library Library contacts with Korea.
Heriot-Watt University Emergency & Business Continuity Planning
Summer Projects 2010 Town of Beech Mountain Utilities Department (Click to Advance Slides)
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Let’s watch a DVD… DVD Instructor Notes
91 st Annual Meeting & Exposition April 1 – 4, 2012 Anaheim, California Are You Prepared for a Disaster? Nancy Brooks, Iowa State University Cory Harms,
Service Delivery 3 Salvage. Aim To introduce students to salvage considerations within the Fire Service.
Windsor Park & Ride (Overview & Scrutiny Panel – 29 th October 2007)
NPMA YANKEE CHAPTER PRESENTATION September 26, 2013.
Checking & Corrective Action
Flooding: BI Issues SIG BI Conference 29 October 2007 Damian Glynn BA(Hons) FCA FCILA FUEDI ELAE.
What do you do when the lights go out? – The value of forward planning for disaster recovery and business continuity. ATEM New Zealand Conference - July.
Christopher A. Welde Director – ParenteBeard Preparing, Supporting, and Settling.
Resilience of SMEs against extreme weather Bingunath Ingirige, Keith Jones, Gayan Wedawatta and Fuad Ali CREW Final Conference, RICS, London 25 th November.
2010 Draft Municipal Budget
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Environmental Auditing on the Yellow River Basin Liu Huibo from CNAO 5/7/2015 Penang, Malaysia.
Business Interruption Insurance We’re a church, not a business, so what’s this got to do with us??? We’ll always find a space to carry on teaching our.
Aon Risk Solutions | Aon Global Risk Consulting | Claims Preparation, Advocacy and Valuations 0 P I C G Conference | The Value of Claims Preparation in.
Paul Dunne Assistant Chief Executive Officer Local Government Management Agency Transforming Local Government: the HR Agenda Dublin Castle, 14th October,
Periodical Purchasing Julie V. Rivera. Brownsville ISD Procurement Guidelines Following established policies and administrative guidelines, the following.
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Construction Category Management Planning Version 1.1 (May 2015)
Property Risks – The Surveyor’s Perspective Stuart Blackie UK Risk Engineering - Property Snakes & Ladders Managing Risk in Higher Education 23 April 2008.
WHATCHA GONNA DO? SOURCES OF WATER FLOOD- SURFACE WATER ROOF DAMAGE FROM WIND/HAIL FIRE- SPRINKLER/FIRE DEPARTMENT PLUMBING - WATER LINE/SPRINKLER.
Managing property losses, from the first report of a loss until the completed Certificate of Occupancy and final payment to our client (insured). Professional.
Office of Risk Management Annual Conference. AGENDA  Remembering 2009  Types of Claims Handled by the Property Unit  What to do after a loss  How.
EPMA. Overview of Servpro Large loss capability Emergency Ready Profile.
Energy surveying qualifications and procedures West Midlands Housing and Energy Conference 2007.
BUSINESS INTERRUPTION RISK FEATURES PETE HOLMES BUSINESS RESILIENCE FORUM APRIL 2015.
Constructionsite Roles in Construction Ron Gatepain.
The adjuster’s casebook What does this look like in practice - some cases to highlight the claims issues but from a perspective of commercial claims.
Getting Climate Change Adaptation on the Agenda 7 December 2010 Gill Fenna - Quantum Strategy & Technology.
Presentation on Preventive Maintenance
Developing Plans and Procedures
Listed Building Fire – a case study 7 th October 2015 Chris Buesnel FCII, FCILA.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
 Is the process of conducting an exhaustive physical examination and thorough inspection of all operational systems and procedures of a facility.
Renaissance On Turtle Creek Annual Meeting January 20, 2009.
Flood Prevention Measures The first six months of 2013 have seen a significant increase in flooding of both tertiary and machine installation. The following.
After the Fire A Major Loss Case Study for the Insurance Institute of Plymouth Paul Thomas ACII, FCILA, FUEDI-ELAE Major Loss Director, QuestGates.
Bayshore Regional Sewerage Authority 24 acre plant flooded 3 to 4 feet deep Water levels recorded above 13.8 feet (NGVD 29) app 12.3 (NAVD 88) Entry at.
Pittsburgh Alliance for Response Risk Management, Loss Control & Insurance February 2009.
The Charity Self Insurance Journey Arran Gray Platinum SponsorMedia PartnerPlatinum Sponsor Association & Membership | Compliance | Event Management |
BUSINESS INTERRUPTION A PROBLEM? …………. 1.Know the Policyholder’s Business.
1 Disaster Planning and Recovery Prepared for: Presented by: Scott McGinness, CIC, CRM Terry Ford, JD, CRM October 28-30, 2013.
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Chapter 10: Package Policies – An Overview 1. C72 – Intro to Risk Mgmt and Comm. Insurance – Chapter 9 Objectives » Discuss the advantages and disadvantages.
ON BEHALF OF THE GIO Property Claims Management Coverable Risks Public Sector Risk Managers Association (PSRMA) - 27 June 2012 Trevor Brown – TMF Property.
1 Regulatory Reform (Fire Safety) Order 2005: An Insurer’s View Mark Newton Property Technical Manager Royal & Sunalliance Insurance.
Risk and Business Continuity Manager
The Policy, Loss Mitigation & Business Recovery
FEMA PUBLIC ASSISTANCE - A PRIMER
New York City Housing Authority Sandy Recovery Program
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Insurance Econ 10/23.
CENTRAL 1 O.C.S.C.C. No. 903 Information Session
Pre-Contract Cost Control
Insurance: A Crucial Financial Safety Net
Pre-contract Planning and Practice
(With anticipated expenses over the $25,000 property deductible)
Business Income Coverage and Extra Expenses
Introduction to Construction Insurance
iNED FORUM ‘HOW WOULD YOUR BOARD RESPOND TO A CATASTROPHE EVENT?’
PROJECT REPORT PREPARATION
Dennis Li - HKCIC Lecturer
Construction Insurance
2011 Flood Quick Buy Program Storm Water Services September 7, 2011
Presentation transcript:

Managing Risk in Higher Education Adjusting a major flood claim - a university case study Maggie Cowing BSc(Hons) ACII FCILA

Adjusting a major flood claim Cause Material damage aspects Business interruption aspects Claim management Recovery Lessons learned

University of Hull Established 1928 Circa 16-17,000 students Circa 2,300 employees Revenue approx £130m Property/BI cover No previous experience of flooding

June 2007 Floods Torrential, prolonged rainfall Surface drains & sewers couldnt cope 1 in 150 year event Tens of thousands of claims

Cause Flood 1 – 15 June 07 Flood 2 – 25 June 07

Material damage aspects - Buildings

Strip out, dry and clean Prepare scope of works Procurement – pre tendered rates or by competitive tender Adjuster checks and approves scope and cost Have work carried out…..

Material damage aspects - Buildings ….but rarely go back exactly as was Compliance with public authority requirements Flood resilient repairs More convenient/economical layouts Speed of repairs (business interruption) Work on notional reinstatement costs

Material damage aspects - Contents

Dry and clean Examine possibility of repair or replacement Obtain estimates for repair or replacement Adjuster checks and approves scope and cost Have work carried out…..

Material damage aspects - Contents ….but rarely go back exactly as was Racking no longer available Better machines now available Non-replacement of all small items Speed of repairs (business interruption) Work on notional reinstatement costs

Business Interruption aspects M & E loss to library Loss of Hall of Residence heating & hot water Damage to Hall of Residence and social centre Shortage of accommodation in area due to flood New academic year starts 17 Sep Students choices made in July Halls - £500K pa at risk, tuition fees - £600K pa

Business Interruption aspects Temporary transformer for library

Business Interruption aspects

Temporary transformer for library Temporary boiler plant for hall

Business Interruption aspects

Temporary transformer for library Temporary boiler plant for hall Temporary floor coverings for hall Costs of expediting work Thanks to a great effort on the part of university staff in all areas, all work was completed to time Unavoidable small loss of GP from café Otherwise all revenue secured

Claim management Series of meetings Actions/minutes agreed Used as agenda for next meeting Development of spreadsheets detailing loss Live system with version control Prompt interim payments Early settlement once quantum agreed

Recovery Extreme weather event – 1 in 150 Yorkshire Water reduced capacity of drainage system pumping station reduced capacity of sewerage system Need to tie in to damage or extent Extensive flood modelling required

Lessons learned Claim management and communication Pre-appointment of contractors no flood inflation prompt attendance OJEU requirements avoided Use of external professionals Flood resilient repairs Business interruption cover