Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.

Slides:



Advertisements
Similar presentations
City of Eugene: (1) Meadow View School (2) Prairie Mountain School (3) Malabon Elementary School (4) Arts & Technology Academy
Advertisements

Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Titusville to Edgewater Bike Loop PD&E Study
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
DIVISION OF TRANSPORTATION IRTBA General Membership Meeting October 27, 2011.
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Slide 1. Slide 2 Introduction How did you get to school as a child?
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Intergovernmental Agreements Lands for Matanzas Woods Parkway 4-laning City Council Workshop November 12, 2013.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
PORT OF MIAMI TUNNEL PROJECT 1 FDOT& MAT Presentation FDOT & MAT Presentation.
Utility Extension Project
From Island Estates Parkway to St. Johns County Line.
Public Works EVANSTON ILLINOIS September 29, 2014 Dodge Avenue/ETHS /Mason Park Bike Improvements Project Sat Nagar, P.E. Assistant Director of Engineering.
Alachua County Mobility Plan Transportation Improvement District Overview Jonathan B. Paul, AICP, MA 2 Jeffery L. Hays.
Budget Committee April 28 th, What is Local Budget Law? Establishes Standard Procedures Outlines Programs & Fiscal Policies Requires Estimates of.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Building a New Electric World Annual Shareholders’ Meeting Vote of resolution results Paris. May
Board of County Commissioners September 25, 2012.
Community Development Department Construction Phase.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
S PECIAL A SSESSMENT D ISTRICTS F IRST P UBLIC H EARING * P RESENTATION TO THE B OARD OF C OUNTY C OMMISSIONERS F EBRUARY 23, 2010.
Phase 2: 30% Design Plans September 4 th, 2012.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
Right of Way License Agreement Policy August 25, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners November 4, 2015.
2013 RETREAT VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) FEBRUARY 8, 2013 Craig Coffey, County Administrator 1.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Orange County Public Works Board of County Commissioners Presentation June 16, 2015 Board of County Commissioners Presentation June 16, 2015 Roadway Median.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
IMPACT FEE GRANT PROGRAM FOR NFPs Discussion Item March 6, 2012 Board of County Commissioners.
Amended IGA/JPA Agreements CBI Grant Cochise County Board of Supervisors August 28, 2012.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
PEACHTREE HILLS ROAD WAIVER REQUEST  2.34 ± acres  Currently zoned R-1a  Proposes to create 2nd lot (Mesa Village Tracts No. 2, Replat No. 1)  Applicant.
MetroPlan Orlando Board Meeting Agenda Briefing Board of County Commissioners February 10, 2016.
USDOT TIGER Grant Program Tower Road Complete Street Reconstruction.
Orange County Public Works Board of County Commissioners Presentation June 21, 2011 Board of County Commissioners Presentation June 21, 2011 Landscaping.
The Gainesville Area Chamber Infrastructure Investment Initiative
City Council Meeting November 7, 2016
City of Gresham – Hauton B
Center City Connector 101.
CITY OF LA PUENTE VALINDA COMMUNITY BIKEWAY PROJECT
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
Transportation Projects
Transportation CIP Update
Trail Projects. Trail Projects US 1 (SR 5) From Kennedy Parkway to Dale Avenue FM No.: Work Mix: Bike Path / Trail Phase: Design / Construction.
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
PLUM CREEK PARKWAY WIDENING AND PLUM CREEK PARKWAY/GILBERT STREET ROUNDABOUT PROJECT DESIGN APRIL 3, 2018.
Central Avenue Rapid Transit
Dakota County Board Of Commissioners August 6, 2019
Presentation transcript:

Agreement with Town of Tioga, LLC

Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of Cost Remainder reimbursed through SW Impact Fee Fund FDOT CIGP Grant: $2,400,000 Total Project: Extension of SW 8 th Ave between SW 122 nd St and SW 143 rd St. Two travel lanes, bike lanes, sidewalk, multiuse path, street trees This Agreement: Design and Construction of the portion between SW 122 nd and SW 133 rd Way

The Board of County Commissioners approve the agreement with Town of Tioga, LLC to design and construct the SW 8th Avenue extension between SW 122 nd St and SW 133 rd Way and authorize the Chair's signature.