LOCKED LOGS (LL). THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)

Slides:



Advertisements
Similar presentations
Riparian Zone Habitat Assessment Vegetation and More.
Advertisements

Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
GRADE CONTROL. STABILIZE HEADCUTS FIRST, THEN WORRY ABOUT BANK INSTABILITY SECOND.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
Sulphur Dunnigan Burn Dump, Yolo County, CA. (30 miles north of Sacramento, CA.) BUILT 1998.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
STONES IN COMPRESSION – BOTH NATURALLY & MACHINE PLACED by Dave Derrick.
MISSOURI RIVER INNOVATIVE BANK STABILIZATION & AQUATIC & RIPARIAN HABITAT LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.
Flowing water.  vitally important geologically, biologically, historically and culturally.  contain only 0.001% of the total amount of the worlds water.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
SINGLE STONE BENDWAY WEIRS
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
BW - CHAPTER 14: CASE STUDY- NEOSHO RIVER, ALLEN COUNTY, (MIKE GEFFERT’S PROPERTY) SOUTHEAST KANSAS Constructed May-July 2000 Using Bendway Weirs for thalweg.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Hydraulic Cover Stones (HCS)
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II CONSTRUCTED JUNE 18-20,
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
GRADE CONTROL.
GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT PHASE I CONSTRUCTED AUG-SEPT 2003 PHASE II.
WAYNE KINNEY’S REALLY TALL ENGINEERED ROCKED RIFFLES (ERR) CASE STUDY: ERR #12, WHICH IS A 4.7 FT TALL STRUCTURE.
ONONDAGA CREEK, NEAR SYRACUSE, NY
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
When should you fix a stream????
SINGLE STONE BENDWAY WEIRS
Anthony Keene Kristin LaForge CIVE 717 Spring 2018
When should you fix a stream????
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
In-Stream Structures & Grade Control
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

LOCKED LOGS (LL)

THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)

The "Locked Limb/Locked Log" Concept Consists of entire trees large or small, and/or Small Woody Debris (SWD) consisting of limbs, limbs with leaves, sections of small tree trunks, tree tops, etc. anchored within or placed under structures, with limbs/logs protruding into deeper scoured areas to provide in-stream cover, vertical and horizontal structure, hydraulic roughness, & areas of refugia. Can be either hand- or machine-placed Locked Limbs are typically less than 2” inches in diameter, Locked Logs are greater than 2 inches in diameter

Courtesy of Ecology and Environment, Inc.

Analysis of existing downed logs in the stream system should be undertaken, & the LOCKED LOGS placed at similar angles (typical angles are from 15 to 35 degrees downstream relative to the bank). The root wad is positioned upstream. Study nature!!

MILL BROOK, SALISBURY, NEW HAMPSHIRE PROJECT CONSTRUCTED July 7-16, 2010

Trees were angled downstream 30 degrees from the bank with the root wads upstream against the eroding bank Road Locked Logs

Stone is then loaded on the Locked Logs which “locks” the log in place. Best to have a root wad attached to the log which acts as a spread anchor. Road Locked Logs LOCKED LOG provides hydraulic roughness & aquatic habitat

HIGH WATER-Site #2-Looking 13 Locked Logs providing chaotic structure habitat & in-stream refugia. Thalweg bubbles near inside of bend. HIGH WATER-MILL BROOK, NH-PIX BY DAVE DERRICK

Flow Locked Logs Stone toe protection Place logs on bed of stream, angle log downstream at the appropriate angle, then place stone on the Locked Logs which “locks” the log in place. Root wad acts as a spread anchor.

GOAL & FUNCTION-BASED DESIGN FOR RIPARIAN & STREAM SYSTEMS THE EIGHTEENMILE CREEK PROJECT CONSTRUCTED AUG-SEPT 2003 by Dave Derrick

EIGHTEENMILE CREEK IS A SUBURBAN, GRAVEL-COBBLE BED, POOL-RIFFLE-POOL REGIME STREAM IN A DEEP V-SHAPED VALLEY

A downstream reference wood jam for Locked Limbs/Locked Logs. Always try to imitate nature & natural functions Pix by Derrick

Floating the “footer” log in place

Pix by Derrick “Footer” log in place with Locked Logs placed perpendicular & over top of footer log.

Locked Logs now “locked” in place with stone Pix by Derrick

Row of Locked Logs Pix by Derrick

Locked Logs Pix by Derrick

Locked Limbs & Locked Logs one year later, June 24, 2004 Pix by Derrick

THE IMPORTANCE OF SMALL WOODY DEBRIS, LEAF LITTER & LEAF PACKS Dead things are good things, and these are typically present in nature and reference reaches, but sometimes completely forgotten during “restoration” projects Can be extremely important in starting the food web, for cover (horizontal and vertical structure) for juvenile fishes, and substrate for benthic macro invertebrates Should be added to the stream during restoration in appropriate amounts and spacing based on analysis of similar reference reaches After appropriate analysis, downed trees and/or brush piles might also be placed in riparian areas BEWARE: Large debris piles at bridges or other constrictions can lead to maintenance nightmares & carbon-starved downstream reaches

Locked Logs for McKinstry Creek, Delevan, NY This a gravel-cobble bed stream, with a constant slope of 1% in the project area, rural, first order headwater stream, with a pool-riffle-pool regime.

McKinstry Creek, Delevan, NY This was a complete stream and floodway realignment. Constructed June-July The stream had been straightened prior to 1939 (probably to accommodate the construction of Gooseneck Road)

McKinstry Creek near Delevan, NY, , flow left to right Existing planform (red line)

In the 1939 aerial photos the stream had already been straightened & was parallel with the road. Where had it been?? How long was it?? No one knows. Existing planform (red line)

The stream needs to be longer and/or rougher but we are hemmed in by the road & the hill. Green line is toe of hill We will have to increase the amplitude of the vertical sine wave (extreme verticality)! Gooseneck Road McKinstry Road

McKinstry Creek near Delevan, NY, , flow left to right New channel planform (blue line)

The “Shadow Wall” Pool with Locked Logs and a large transplanted multi- trunk Alder for shade

Channel dug to invert depth, 5 ft below surrounding land

Not as easy to build as it looks

“Shadow Wall” stones, A-axis of stone placed perpendicular to flow

Half-Dense Riprap with Shadow Wall Toe Stone with Vertical face The toe stone is designed to cast a shadow into the deepest section of the channel

Half-Dense Riprap with Shadow Wall Toe Stone with Vertical face Shadow area

Half-Dense Riprap with Shadow Wall Toe Bottom of stone placed deeper than maximum scour in pool Neither the shadow wall or the half-dense riprap is self-adjusting, both are foundation dependent Stone for half-dense riprap should be embedded 50% and cover less than 50% of the bank area Plantings (including vines) should be integrated into the half-dense riprap

Locked Logs placed in 3 ft deep pool

Locked Log locked down with “Shadow Wall” stones

Hand rolling a stone to lock down a Locked Log

All aquatic habitat features are designed to be submerged during base flow conditions

Looking US at pre-dug pool with Shadow Wall & Locked Logs (everyone’s fav pool)

CASE STUDY: GROUNDBREAKING BANK PROTECTION MISSOURI LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.

MISSOURI LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD. Very large river Congressionally designated as a Wild & Scenic River in This is a recreational reach. Can flood for months at a time Ice and ice damage are issues 5,120 ft of protection on the left descending bank US of the Highway 19 bridge, Vermillion, SD. Banks 25 ft tall, very fine grained sand, almost fluff Pool-riffle-pool regime, slope one ft per mile

FUZZY EXTREME LOCKED LOG Cedar tree with lots of branches

Looking US. A cedar Fuzzy Extreme Locked Log CONSTRUCTION-MISSOURI L & C-DERRICK-NOV 15, 2007

Looking US. Placing the Fuzzy Extreme Locked Log in trench CONSTRUCTION-MISSOURI L & C-DERRICK-NOV 15, 2007

Looking US. Fuzzy Extreme Locked Log is locked in place with toe stone. Crest width on toe stone is 10 ft wide. 113 trees spaced 50ft apart were placed. Trees were 65 to140 ft long, with 15 ft of trunk & the root wad buried under the stone toe. Angle downstream varied from 70 to 30 degrees. CONSTRUCTION-MISSOURI L & C-DERRICK-NOV 15, 2007

Looking US. Smoothing choke soil on the 10 ft wide toe stone crest with the Bobcat. CONSTRUCTION-MISSOURI L & C-TERRY STOLTENOW-12/5/07

THE ENVIRONMENTAL AND HYDRAULIC ATTRIBUTES GO HAND-IN-HAND ON THIS PROJECT

Looking self-adjusting toe stone & Extreme Locked Logs, natural bank US. CONSTRUCTION-MISSOURI L & C-DERRICK-NOV 15, 2007

EXTREME LOCKED LOGS WITH ICE

ICE MANAGEMENT FOR STABILIZATION/RESTORATION PROJECTS Increase roughness of the bank and near-bank aquatic area!!! Ice will form first in slow water Ice will be thickest in the slower water Next the entire stream has an ice cover Then the spring ice-out occurs The thickest ice near the bank will stay put so that plants are not sheared & smaller stones are not plucked

Ice surrounding LL fends off moving ice floes. Thickness of ice shows flow velocity differentials CONSTRUCTION-MISSOURI L & C-DERRICK-DEC 11, 2007

Looking DS at ice buildup around the Locked Logs. CONSTRUCTION-MISSOURI L & C-DERRICK-DEC 11, 2007

Looking DS at toe stone & Extreme Locked Logs. CONSTRUCTION-MISSOURI L & C-DERRICK-NOV 14, 2007

THE POWER OF LOCKED LOGS ON THE MISSOURI RIVER DURING THE GREAT FLOOD OF 2011.

39-40 Months After Project Completion GREAT FLOOD OF 2011 AERIAL PHOTOGRAPHS Different dates

GREAT FLOOD OF 2011-Looking DS. Clearly visible foam line indicates the influence of the Locked Logs, (slower water nearer bank). Logs are submerged at least 8 to 10 ft. 38 MONTHS LATER- MISSOURI & C-FROM TED HALL

40Months After Project Completion GREAT FLOOD OF 2011 PIX TAKEN TWO FOOT BELOW FLOOD CREST Photos by Derrick JULY 30, 2011

2 FT BELOW GREAT FLOOD OF 2011 foam line approx. 100 ft. into channel caused by the reduction in flow velocity due to the Locked Logs. Logs 8-10 ft under water. 40 MONTHS LATER- MISSOURI & C-PIX BY DERRICK

2 FT BELOW GREAT FLOOD OF 2011 CREST-Looking foam line delineating the outermost effect of the Locked Logs in reducing flow velocity. Logs 8-10 ft under water. 40 MONTHS LATER- MISSOURI & C-PIX BY DERRICK

2 FT BELOW GREAT FLOOD OF 2011 CREST-Looking debris on bank. All 4 rows of willows under water. No erosion! 40 MONTHS LATER- MISSOURI & C-PIX BY DERRICK

HIGH-LOW LOCKED LOGS After watching them perform during the flood, the contractor, Tom Powell, is a big Locked Log fan, so he staggered them high & low to better slow water than if all logs were placed at the same elevation.

Looking left bank 4.25 YEARS LATER-Looking a Locked Log (LL) high in water column. After watching them perform during the flood, the contractor staggered the LL high & low to better slow water than if all logs were placed at the same elevation YEARS LATER- MISSOURI & C-FROM DERRICK

Looking left bank 4.25 YEARS LATER-Looking Locked Log installed lower in the water column. High & low logs slow more water & are more effective than all logs at the same elevation YEARS LATER- MISSOURI & C-FROM DERRICK

This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal , or Enjoy the information!!