Site report GSI Darmstadt FAIR project Overview IT at GSI

Slides:



Advertisements
Similar presentations
Presented by Ben Serebin Tue, June 15, Every 2 nd Tuesday of the Month. Same Time and Place Visit for Presentation.
Advertisements

Rick Claus IT Pro Advisor Microsoft Canada Rodney Buike IT Pro Advisor Microsoft Canada
Heavy Ion Cancer Therapy
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
PAUL SCHERRER INSTITUT Paul Scherrer Institut 5232 Villigen PSI HEPIX_Edinb / / Juergen Baschnagel Site Report: PSI
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Liverpool HEP – Site Report May 2007 John Bland, Robert Fay.
LAL Site Report Michel Jouvin LAL / IN2P3
UCL HEP Computing Status HEPSYSMAN, RAL,
24-Apr-03UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS SECURITY SOFTWARE MAINTENANCE BACKUP.
RAL Particle Physics Dept. Site Report. Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental.
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Service Data Challenge Meeting, Karlsruhe, Dec 2, 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Plans and outlook at GridKa Forschungszentrum.
1 Media-X eWalk Walkthrough Install Training Office of Institutional Education Programs.
Clemens Rossell (clrossel) UCBU Unity Connection 8.0(2) Virtualization TOI.
Virtualization & Disaster Recovery
ITT NETWORK SOLUTIONS. Quick Network Facts Constant 100 Mbps operation for users Infrastructure ready for 1000 Mbps operation to the user Cisco routing.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
OFFICE OF SUPERINTENDENT OF PUBLIC INSTRUCTION Division of Assessment and Student Information Online MSP Testing In-Depth Technology Training January 13,
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 World Meteorological Organization Working together in weather, climate and water Sixteenth World Meteorological Congress Information Technology Support.
Addition 1’s to 20.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
CPP Staff - 30 CPP Staff - 30 FCIPT Staff - 35 IPR Staff IPR Staff ITER-India Staff ITER-India Staff Research Areas: 1.Studies.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Edinburgh Site Report 1 July 2004 Steve Thorn Particle Physics Experiments Group.
ENAM ENAM - INFRA Project 2013.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Status Report Walter F. Henning.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt A Status Report Hans H. Gutbrod CBM collaboration meeting 7. July.2003.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
Nov 1, 2000Site report DESY1 DESY Site Report Wolfgang Friebel DESY Nov 1, 2000 HEPiX Fall
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
GStore: GSI Mass Storage ITEE-Palaver GSI Horst Göringer, Matthias Feyerabend, Sergei Sedykh
Site Report GSI ● GSI ● GSI ● Linux-Farm Walter Schön, GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
CERN Computer Centre Tier SC4 Planning FZK October 20 th 2005 CERN.ch.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
STAR IT Environment Update All Hands Meeting June 2, 2006.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
ESR Slow highly charged ions and antiprotons
FAIR – the Universe in the labororatory
Presentation transcript:

Site report GSI Darmstadt FAIR project Overview IT at GSI Helmut Kreiser

Facility for Antiproton and Ion Research Das FAIR Projekt Facility for Antiproton and Ion Research Jürgen Eschke Vortrag Wissenschaft für Alle, GSI, 12.5.2004

FAIR Verbesserung gegenüber heute: SIS100/SIS300 GSI Accelerator Primärstrahlintensität 100 – 1000 x Sekundärstrahlintensitäten für radioaktive Kerne: bis 10 000x Ionenenergie: 20 x Neu: schnell gepulste supraleitende Magnete „gekühlte“ Antiprotonenstrahlen bis 15 GeV Speziell: intensive „gekühlte“ Strahlen radioaktiver ‚exotischer‘ Kerne effizienter Parallelbetrieb für mehrerer Experimente SIS100/SIS300 GSI Accelerator Facilities HESR ESR CBM UNILAC Super- FRS Plasma Physics PANDA Atomic Physics FLAIR CR NESR

Structure of the FAIR project FAIR Council (Representatives of Countries and/or Institutions)  Finance Committee, Project Oversight Committee Scientific Advisory Com. Project Management Project Director, Deputy Research Coordinator, Accelerator Coordinator, Civil Construction Coordinator, Integration Coordinator, Administrative Coordinator Safety Quality Controlling Advisory Committees PACs, TAC, EMAC,.. Project Office Accelerator Coordinator (Technical Boards) Research Coordinator (Technical Boards ) Civil Construction Coordinator (TB) Integration Coordinator(TB) SIS18 Upgrade 1. P-Linac 2. SIS100 3. SIS200 6T 4. Acc. System Physics 5. CR System 6. HESR 7. NESR 8. PANDA 9. CBM 10. Super-FRS 11. Plasma Phys. Exp. 12. Atomic Phys. Exp. 13. Buildings + Infrastructure 14. Integration 15. 1.1. 2.1. 3.1. 4.1. Simulat. 5.1. 6.1. 7.1. 8.1. 9.1. 10.1. 11.1. 12.1. 13.1. 14.1. Installations 2-4,6-13, 15.1. 1.2. Beam lines 5..2. 14.2. cryogenics 15.2. 1.3. 14.3. alignement/ surveillance 15.3. 1.4. 14.4. IT media con. 15.4. 1.5. controls 15.5. Working packages

IT Linux (Debian) ~ 350 Windows ~ 800 AIX (reducing) ~ 10 VMS ~ 15 (SUSE) ~ few Windows ~ 800 AIX (reducing) ~ 10 plus bio physics ~ 20 VMS ~ 15 plus Accelerator controls (~30) Notebooks Windows (XP) Linux (SUSE) Mass storage (3 libraries, TSM, TSM-API access) 2 SAN based (Storage Tek with LTO-2 tapes drives)

What is new Firewall (Cisco PIXS) Linux MTA (2-3) (migrate from AIX) Spam filtering (tagging) (Spamassassin) Virus checking (Sophos, ClamAV) Problems: Siesta (~20 min) enforce GSI e-mail naming convention (H.Kreiser@gsi.de) DNS Service migration to Linux (from AIX) connection timeouts on AIX

What is new new Fileservers with Serial ATA disc raids 3 U boxes with up to 15 discs Data Scratch Problems with old IDE disc raids new batchsystems (1 U boxes, Dual Xeon, 3.2 GHz) Windows migrate to XP, Server 2000/2003 phase out WinNT (this year)

Systems

What is new Debian 3.0 r2 non interactive daily security updates with „out of the box“ debian tools monitoring system (mon) processes disc status log host (syslog-ng) perhaps box status GRID, LCG -> need systems and support

What is to be done separate discussion forum (FUD forum, open source) Migration of services from AIX to Linux radius listserv NIS (sign on, LDAP based) ….. Groupware (mailserver) discussion Microsoft Exchange 2003 OCS (Oracle collaboration suite) separate discussion forum (FUD forum, open source) Discussion: new Batch queueing system LSF production (money) SGE OpenPBS if money is available replace old batchfarm boxes new and much more storage systems (user, data, scratch) SAN/FC ? ~ 10 TByte is too small good Linux desktop support -> manpower ??