Vertex detector optimisation: status and strategies

Slides:



Advertisements
Similar presentations
Radiation damage in silicon sensors
Advertisements

Konstantin Stefanov, Rutherford Appleton Laboratory4 th ECFA-DESY Workshop, 1-4 April 2003p. 1 CCD-based Vertex Detector - LCFI status report Konstantin.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Status Report: Sensors for the ILC Konstantin Stefanov CCLRC Rutherford Appleton Laboratory.
The Status of the LCFI Project Snowmass 2005 Joel Goldstein CCLRC Rutherford Appleton Laboratory For the LCFI Collaboration.
Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
Konstantin Stefanov, Rutherford Appleton Laboratory UTA LC Workshop, 8 Jan Report from the LCFI collaboration Konstantin Stefanov RAL Introduction:
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 26 September 2006 LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
January US LC Workshop SLAC – Chris Damerell 1 Strategies for pickup and noise suppression with different vertex detector technologies Chris Damerell.
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
ISIS and SPiDeR Zhige ZHANG STFC Rutherford Appleton Laboratory.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
Recent developments with LCFI ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development and testing.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
LCFI A Vertex Detector for the International Linear Collider  International Linear Collider (ILC): consensus that ILC will be next major particle accelerator.
Linear Collider Flavour Identification Collaboration: Case for Support ■ Introduction to the ILC and LCFI: ♦Physics at the ILC ♦LCFI physics studies ♦Sensor.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 Instrumentation DepartmentMicroelectronics Design GroupR. Turchetta 3 April 2003 International ECFA/DESY Workshop Amsterdam, 1-4 April 2003 CMOS Monolithic.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
A new idea of the vertex detector for ILC Y. Sugimoto Nov
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
R&D Status of FPCCD Vertex Detector Dec.1, 2006 Yasuhiro Sugimoto KEK.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Hamburg, Marcel Trimpl, Bonn University A DEPFET pixel-based Vertexdetector for TESLA 55. PRC -MeetingHamburg, Mai 2003 M. Trimpl University.
Nicolo de Groot, Rutherford Appleton LaboratoryDESY PRC, 7/8 May 2003p. 1 CCD-based Vertex Detector - LCFI status report Nicolo de Groot RAL/Bristol Conceptual.
Fine Pixel CCD Option for the ILC Vertex Detector
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 ECFA 2006, Valencia LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
Radiation hardness of Monolithic Active Pixel Sensors (MAPS)
M. Deveaux, CBM-Collaboration-Meeting, 25 – 28. Feb 2008, GSI-Darmstadt Considerations on the material budget of the CBM Micro Vertex Detector. Outline:
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Report to LCFI Oversight Committee, January 2007 ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development.
20/12/2011Christina Anna Dritsa1 Design of the Micro Vertex Detector of the CBM experiment: Development of a detector response model and feasibility studies.
CMOS Sensors WP1-3 PPRP meeting 29 Oct 2008, Armagh.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.
1 Konstantin Stefanov, Rutherford Appleton Laboratory 1 LCWS2007 Progress with the CPCCD and the ISIS Konstantin Stefanov Rutherford Appleton Laboratory.
1 Konstantin Stefanov, STFC Rutherford Appleton Laboratory 1 Vertex 2007, Lake Placid A CCD Based Vertex Detector Konstantin Stefanov STFC Rutherford Appleton.
TRACKING AND VERTEXING SUMMARY Suyong Choi Korea University.
6/19/06 Su DongSiD Advisory: VXD DOD Summary II1 VXD DOD Summary (II) Sensors & Other system Issues.
Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 0 Recent results from R&D towards a vertex detector at the international.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration LCWS2008, 17 November 2008 Column Parallel CCD and Raw Charge Storage.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford Ringberg Workshop, 8 April 2008 Pixels with Internal Storage: ISIS by LCFI.
First Testbeam results
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
LCFI Status Report: Sensors for the ILC
Rita De Masi IPHC-Strasbourg on behalf of the IPHC-IRFU collaboration
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
FPCCD Vertex Detector for ILC
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
FPCCD Vertex Detector for ILC
The LHCb VErtex LOcator
Status of CCD Vertex Detector R&D for GLC
Presentation transcript:

Vertex detector optimisation: status and strategies Introduction. Performance goals. Constraints due to machine and detector. Conceptual detector design. Sensors. Mechanical structure. Physics performance. Summary.

Introduction An example of what we want to do: Higgs boson is found, is it evidence for supersymmetry? Measure the branching ratios for decays to b, c and t. Are BRs compatible with the SM... ...or are “d-type” couplings enhanced and “u-type” suppressed as predicted by SUSY? Given expected cross sections and luminosity, measurements require high efficiency b and c identification. Large backgrounds imply high purity needed. If SUSY found, studies often benefit from flavour identification. E.g. scalar top production: followed by Identify b jets plus W decay products (inc. c and b quarks).

Introduction Physics studies can also benefit from separation of E.g. reduce combinatorial background. Also aids study of possible anomalies in gauge boson couplings. Can be observed in angular distributions of W production and decay Favoured process W charge determined from that of m. ID of b and c charges would increase number of channels that could be used in measurement. Charge ID can also make possible measurement of parity of Higgs boson, CP asymmetries in SUSY processes... e+ e- m- W+ c W-

Performance goals Average impact parameter of B decay products ~ 300 mm, of charmed particles less than 100 mm. Impact parameter resolution is given by convolution of point precision, multiple scattering effects, lever arm, and mechanical stability. Multiple scattering significant despite large √s at ILC as average charged track momentum 1...2 GeV. Resolve all tracks in dense jets. Cover largest possible solid angle: forward/backward events are of particular significance for studies with polarised beams. Stand-alone reconstruction desirable. In terms of impact parameter, require resolution in rf and rz: Implies typically: Pixels ~ 20 x 20 mm2. First measurement at r ~ 15 mm. Five layers out to radius of about 60 mm, i.e. total ~ 109 pixels Material ~ 0.1% X0 per layer. Detector covers |cos q| < 0.96.

Constraints due to machine and detector Minimum beam pipe radius 14 mm. Pair background at this radius in ~ 4T field causes 0.03 (0.05) hits per BC and mm2 at √s = 500 (800) GeV. Bunch train structure: For pixels of size 20 x 20 mm2, implies readout or storage of signals ~ 20 times during bunch train to obtain occupancy less than ~ 0.3 (0.9) %. Must withstand: Radiation dose due to pair background of ~ 20 krad p.a. Annual dose of neutrons from beam and beamstrahlung dumps ~ 1 x 109 1 MeV equiv. n/cm2. Must cope with operation in 4T field. Beam-related RF pickup and noise from other detectors may be an issue. 337 (189) ns 2820 (4500) 0.2 s 0.95 ms

Constraints due to machine and detector ILC may be more hostile environment than storage ring. Nanometre beam spots and single pass operation mean invasive diagnostic tools essential, e.g. BPMs, with possible imperfections in shielding of cables, optical ports... Vertex detector is more vulnerable to pickup than other detectors due to: Proximity to beampipe – Faraday cage ideals tend to be compromised. Signals typically only ~ 1000 e-, must be amplified electronically and read out. SLD vertex detector observed massive pickup and optical transmission was disrupted by every bunch: tens of ms needed for recovery. SLD CCD readout strategy: During bunch train, signal charge is stored safely in buried channel. When pickup has died down, charge transferred to output node and sensed as voltage on gate of output transistor. SLD still needed filter which suppressed noise by factor ~ 100. EMI tests later this year at SLAC.

Conceptual detector design Example using CCDs: Surrounded by ~ 2 mm thick Be support cylinder. Allows Be beam pipe to be of thickness of ~ 0.25 mm. Pixel size 20 x 20 mm2, 8 x 108 pixels in total. 50 MHz readout of inner layer. Standalone tracking using outer 4 layers. Hits in first layer improve extrapolation of tracks to IP. Sensor operation at 180 K, gas cooling, additional evaporative cooling for electronics if needed. Readout and drive connections routed along BP. Important that access to vertex detector possible, “roll” outer tracker along BP as done at SLD.

Conceptual detector design Amount of material in active region minimized by locating electronics only at ends of ladders if possible. Resulting material budget, assuming unsupported silicon sensors of thickness ~ 50 mm: Material of: beam pipe five CCD layers cryostat support shell

Sensors – CPCCD (LCFI) Column parallel charge coupled device. First of these, CPCCD1, manufactured by e2v. Two phase, 400 (V)  750 (H) pixels of size 20  20 μm2. Metal strapping of clock gates. Two different gate shapes. Two different implant levels. Wire/bump bond connections to readout chip and external electronics. Direct connections and 2-stage source followers: Direct connections and single stage source followers (20 mm pitch):

Sensors – CPCCD Standalone CPCCD1 tests: Noise ~ 100 e- (60 e- after filter). Minimum clock potential ~1.9 V. Max clock frequency above 25 MHz (design 1 MHz). Limitation caused by asymm. clock signals due to single metal design. Marry with CPCCD readout ASIC, CPR1 (RAL): IBM 0.25 μm process. 250 parallel channels, 20μm pitch. Designed for 50 MHz.

Sensors – CPCCD Wire bonded CPCCD1 – CPR1 assembly. Total noise ~130 electrons. Bump bonding done at VTT: First time e2v CCDs have been bump bonded.

Sensors – CPCCD CPR1 bump bonded to CPCCD1, charge channels: Observe ~ 70 mV signal, expected 80 mV, good agreement. Some teething problems with CPR1. Resolved in CPR2 design which also includes cluster finding logic and sparsified readout. o/p spars. clust. bin. 5-bit ADC pre-amp MPX find conv.

Sensors – CPCCD Next generation, CPCCD2, now being manufactured. Stripline clock bus Main clock wire bonds Extra pads for clock connection CPR-1 CPR-2 Temperature diode Charge injection Four 1-stage and 2-stage SF in adjacent columns Four 2-stage SF in adjacent columns Standard Field-enhanced Clock monitoring and extra pads every 5 mm No connections this side Image area Next generation, CPCCD2, now being manufactured. Compatible with CPR1 and CPR2. Two charge transport sections. Choice of epitaxial layers for varying depletion depth. Three chip sizes, includes: Large scale stitched devices, area 9.2 x 1.5 cm2, close to ILC size, operate at few MHz. Smaller devices for tests to 50 MHz.

Sensors – CPCCD High-speed clock propagation, “busline free” CCD. Whole image area serves as distributed bus. Highest speed potential, 50 MHz achievable with suitable driver. Expect robust against pickup as signals “in silicon” until very short paths through bump bonds to CPR. Φ1 Φ2 Level 1 metal Polyimide Level 2 metal Φ2 Φ1 To multiple wire bonds 1 mm

Sensors – DEPFET (Bonn, Mannheim, HLL Munich) Depleted field effect transistor. High resistivity silicon substrate, sensitive over full volume. Electrons collected on internal gate, modulate transistor current. First amplification “in pixel”. 14V

Sensors – DEPFET Low noise operation possible at room temperature. Double metal structures produced in August 2004, make possible large area sensors. Pixel size 20 x 25 mm2, resolution 9.5 mm. Sensors can be thinned: Sensor ~ 50 mm Frame ~ 300 mm

Sensors – DEPFET Fast steering chip developed (Switcher II) 2 x 64 channels. Sequencer and RAM tested to up to 80 MHz. “Analogue” section (reset signal): Power consumption 1 mW per channel at 30 MHz. 4.8 mm 4.6 mm

Sensors –DEPFET Current Readout (CURO II) chip, 128 channels. Features automatic pedestal subtraction (fast CDS). “On chip“ hit detection and zero suppression. Analogue hit readout works to 50 MHz. Digital processing runs at 110 MHz. Power 2.8 mW per channel. Next steps. Detailed measurements with prototype system: Noise performance. Spatial resolution. Test beam beginning 2005. Improve steering chip, Switcher III: Less static power consumption (power down feature). Analogue operation up to 50MHz. New readout, CURO III, with power down feature. Larger DEPFET matrix (512 x 512 pixels with double metal).

Sensors – MAPS (Strasbourg, DESY and UK groups) Monolithic active pixel sensors. Charge collection by diffusion, no field in epitaxial layer. Strasbourg group has developed MIMOSA 1...9, UK group also investigating several designs. MIMOSA 9: 20 m thick epitaxial layer. Cells with 20, 30, 40 m pitch. “Edge” electronics

Sensors – MAPS Tested at CERN SPS 120 GeV pions: S/N peak ~ 24 (40 x 40 mm2 pixels). Excellent spatial resolution achieved: Efficiency > 99.8% with 20 x 20 and 30 x 30 mm2 pixels.

Sensors – MAPS Demonstrated that detectors thinned to 15 mm function (MIMOSA 5): Tests suggest MAPS will withstand 0.5...1.0 Mrad, work ongoing. Simulation and measurements of power consumption and cooling underway, e.g. for inner and outer ladders: Thinned Standard

Sensors – MAPS Charge collection time simulated by UK groups. Standard APS2, charge collected from ~ 6 mm layer in about 30 ns. Long compared to readout speeds needed for inner layer of vertex detector, particularly if use thicker epitaxial layer? Solution, deep n well: Allows charge collection in few nanoseconds. Possible decrease in S/N. APS2 in DESY test beam beginning February. APS4 (with deep n well) available from about April.

Sensors – FPCCD Fine pixel CCD. Get acceptable occupancy by increasing number of pixels by factor ~ 20 w.r.t. “standard” vertex detector. Pixel size ~ 5 x 5 mm2. Must keep diffusion to minimum so no cluster confusion – deplete full epitaxial layer. Tilt sensors to compensate for spread due to Lorentz angle: Signals “in silicon” during bunch train, readout between bunch trains. Use two CCD sandwich with foam filling to build vertex detector. Hit “doublets” may help in separation of signal from background.

Sensors – FAPS (UK groups) Flexible active pixel sensors. Add in pixel storage capacitors to MAPS. Present design “proof of principle”. Pixels 20 x 20 mm2, 3 metal layers, 10 storage cells. Pixel not completely full, reducing feature sizes and/or moving to larger pixels will allow more storage cells.

Sensors – ISIS (LCFI) In-situ storage image sensor. Signal always in buried in silicon until bunch train passed. Test device being built by e2v. “Revolver” variant of ISIS reduces number of charge transfers needed, increases radiation hardness and also flexibility of readout. 20 μm

Sensors – ISIS Charge generation Transfer Storage Readback from gate 6 4 5 Storage gate 3 6 Storage gate 2 RSEL OD RD RG 1 7 8 OS Output node to column load Output gate Photogate Transfer gate 8 20 19 Charge generation Transfer Storage 18 17 Readback from gate 6

Mechanical considerations (LCFI) Thin ladder design. Unsupported CCD option foundered due to stresses introduced when silicon is processed. Supporting CCD on Be... ...complicated by requirement that operate at low temperature: Now investigating substrates with thermal expansion close to that of silicon, e.g. carbon fibre and various foams. Studies of ladder end support structures ongoing. Beryllium substrate (250 μm) Adhesive 0.2mm

Physics performance (LCFI) Optimising the physics performance of the vertex detector. Here look again at CCD based system. Study impact parameter resolution in rf, s(d0). Increasing material budget has moderate effect. Performance suffers strongly when beam pipe radius increased from 15 to 25 mm.

Summary Many possible sensor technologies are being investigated. Goal of all groups it to demonstrate that these can be operated at the ILC, i.e. that they can achieve the necessary readout speed, that they are insensitive to RF pickup, etc. Tests of full scale ladders required to demonstrate this – progress being made towards this goal. Vertex detectors must be designed around these ladders, providing all necessary services, precision mechanical support, etc. with minimum possible material budget. The physics performance of these “real” detectors must then be evaluated. Simulations should aim to include all possible relevant effects, e.g. fluctuations in deposited charge in thin silicon layers, Lorentz angle, background hits, nuclear counter effect, effects of temperature fluctuations due to power cycling... It should be kept in mind that overall detector considerations (as well as increasing size of silicon wafers!) may lead to changes in the vertex detector design, e.g. an increase in length and/or the addition of a further layer.