Public Hearings on the Electricity Distribution Industry: Portfolio Committee on Energy For an Equitable Sharing of National Revenue 25 July 2012.

Slides:



Advertisements
Similar presentations
Electricity theft and non-payment: Impact and action plan by Chris Yelland CEng Managing editor EE Publishers.
Advertisements

1 Alignment to the Local Government Turn Around Strategy (LGTAS)
Analysis of Public Submissions Presidential SOE Review Committee Democracy, Governance and Service Delivery Date: 29 November 2011 Democracy, Governance.
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Financial Contestability
Chairpersons for Finance Portfolio committees The role of Council in Supply Chain Management (SCM) 29 May
Sustainability and Total Cost of Ownership Strategies for Higher Education.
MFMA ASSET MANAGEMENT WORKSHOP ZANELE MNCWANGO National Treasury 24 November 2010 Infrastructure Maintenance.
 Local government is a constitutional sphere of government. The legal framework for local government is contained in Chapter 7 of the Constitution of.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
Funding Local Economic Development Malijeng Ngqaleni National Treasury 17 March 2009 Kwazulu-Natal Local Economic Development Conference 08/09.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
COMMENTS ON THE APPROPRIATION BILL 2011 STANDING COMMITTEE OF APPROPRIATIONS 13 A PRIL 2011 For an Equitable Sharing of National Revenue.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
The strategy for improved electricity distribution maintenance 9 June 2008.
The Institute for Municipal Finance Excellence NERSA HEARINGS 20 JANUARY 2010 Eskom’s Revised Revenue Application MYPD 2010/11 – 2012/13.
NERSA MUNICIPAL DETERMINATION ON THE FINANCES OF MUNICIPALITIES PORTFOLIO COMMITTEE ON ENERGY Presenter: | National Treasury | 30 July 2013.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Electricity Distribution Industry (EDI) South Africa Presentation to the Joint Parliamentary Portfolio Committees of ENERGY and COOPERATIVE GOVERNANCE.
IPASA presentation to Portfolio Committee on Health 31 October 2014 Abeda Williams.
Response to FFC submission for Division of Revenue 2011/12 Dept of Basic Education presentation to Select Committee on Finance 17 August 2010 Dept. of.
1 Presentation to Select Committee on Appropriation regarding sector analysis JULY 2014 BY MONGANA TAU.
Financial and Fiscal Commission Review of the Local Government Fiscal Framework Presentation to the Select Committee of Appropriations 22 May 2013.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Financial and Fiscal Commission Submission on the 2011 Division of Revenue Bill Select Committee on Appropriations 22 March 2011.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
FFC Framework for assessing Conditional Grants 16 March 2010 Financial and Fiscal Commission 1.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
Comments on FFC Annual Submission for 2006/07. COMMENTS ON RECOMMENDATIONS –Local Government Equitable Share Allocation –Infrastructure Grants –Health.
The Association of Municipal Electricity Undertakings (Southern Africa) Experiences and views of the AMEU on the EDI and related issues Michael J Rhode.
PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS MAHOMED VAWDA Acting Chief Director: Institutional Oversight Dept of Water Affairs Dept of Water.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
Presentation to the Portfolio Committee on Energy
ELECTRICITY DISTRIBUTION INDUSTRY DECISION
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
For an Equitable Sharing of National Revenue
ELECTRICITY REGULATION AMENDMENT BILL
Parliament and the National Budget Process
Content Overview of the Regulatory Environment Regarding The Electricity Distribution Industry in South Africa Who is NERSA? Regulatory Principles The.
NERSA presentation at the PPC meeting held on 24 May 2006
Health expenditure outcomes & the ffc’s health recommendations Briefing to the portfolio committee on Health 20 October 2011.
SALGA Comments on LG Grants Division of Revenue Bill, 2011
ASSET MANAGEMENT.
ENERGY RELATED RECOMMENDATIONS OF THE COMMISSION
PROGRESS REPORT ON IMPLEMENTATION OF THE PUBLIC FINANCE MANAGEMENT ACT
Briefing to the Portfolio Committee on Energy
Overview Rationale Context and Linkages Objectives Commitments
Translating political objectives into sound policy proposals
Portfolio Committee On Sports and Recreation 7 November 2017
FFC Briefing to the Portfolio Committee on Energy
FFC Briefing to the Portfolio Committee on Energy
progress of the water reform in bulgaria
FFC Briefing to Portfolio Committee on Energy
SOUTH AFRICAN INSURANCE ASSOCIATION
Overview Rationale Context and Linkages Objectives Commitments
For an Equitable Sharing of National Revenue
Topic: Possible Restructuring of the Electricity Distribution Industry
The Electricity Distribution Industry
Ekurhuleni, South Africa
For an Equitable Sharing of National Revenue
FFC COMMENTS ON THE DIVISION OF REVENUE BILL 2006/07
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
SALGA Comments on the 2011 MTBPS Standing Committee on Appropriations
Presentation transcript:

Public Hearings on the Electricity Distribution Industry: Portfolio Committee on Energy For an Equitable Sharing of National Revenue 25 July 2012

O UTLINE OF THE P RESENTATION 1.Infrastructure and economic growth 2.Status quo and future plans within the electricity sector 3.Cross-subsidisation by municipalities 4.Electricity distribution: challenges and implications of current situation 5.Lessons from previous restructuring attempt 6.Recommendations for the way forward Public Hearings on EDI, 25 July 2012

1. 1.I NTRODUCTION Infrastructure and potential for growth – FFC recommendations for 2009 division of revenue – Equally important is maintaining and rehabilitating existing/new infrastructure to ensure sustainable service delivery Critical given commitments on infrastructure made in the 2012 State of the Nation Address Challenges of spending on infrastructure in South Africa are driven by among other things – Significant backlogs – Inadequate funding of and underspending on capital budgets – Low spending on repairs and maintenance – Generally low technical capacity (e.g. engineers) to guide implementation of infrastructure projects Public Hearings on EDI, 25 July 2012

1. 1.I NTRODUCTION ( CONT.) Public Hearings on EDI, 25 July 2012 A 2009 World Bank study on municipal infrastructure finance, estimates that for the local government sphere to adequately meet its infrastructure investment needs it will require R500 billion over the next 10 years ‾ R180 billion for new infrastructure ‾ R80 billion for backlogs ‾ R240 billion for rehabilitation

2. 2.S TATUS Q UO WITHIN E LECTRICITY S ECTOR Generation: Satisfactory condition, can reasonably meet current demand although major capital investment in new infrastructure is needed to ensure demand can be met over next five years. Risks include ageing infrastructure, new project completion and coal supply Transmission: Satisfactory condition, can meet current demand, major capital investment required to meet needs over next five years Distribution: Inadequate operations and maintenance capacity, shortage of skilled personnel, infrastructure is ageing and/or overloaded. Lack of capacity to meet demand. Big risk is impact on the national economy if significant investment are not made Public Hearings on EDI, 25 July 2012

2. 2.F UTURE P LANS WITHIN E LECTRICITY S ECTOR Plans as per Government’s Integrated Resource Plan (IRP) : – Averting the risk of power shortages while increasing energy supply and efficiency to support the needs of a growing economy in the longer term; – Ensuring affordable energy to support inclusive development; – Addressing local environmental threats related to energy use, notably those related to air pollution and human health With respect to infrastructure plans over the long term, the IRP notes the intention to : – Deploy new nuclear capacity, renewable energy capacity, expand regional agreements to expand hydroelectric power and increase substitution of unconventional and imported natural gas for coal Positive development - shift from sole focus on access to electricity to access to energy (alternative green power sources) as well Public Hearings on EDI, 25 July 2012

3. 3.S URPLUSES AND C ROSS - S UBSIDISATION Many municipalities make surpluses from electricity – Surpluses used to cross subsides other services (Inter service cross subsidisation) – Within electricity poor consumers are subsidised by well to do ones Source: FFC calculations based on National Treasury data

3. 3.I NTER AND I NTRA C ROSS - S UBSIDISATION ( CONT.) Price increases are another indicator of cross subsidisation across household groups Price increase for high income people are high and for poor increases are stable year on year at a maximum of 15% Source: FFC calculations based on National Treasury data

3. 3.E FFECT OF A DMINISTERED P RICES Public Hearings on EDI, 25 July 2012 Government to work with the National Energy Regulator (NERSA), and other critical stakeholders to develop an effective financing framework Source: FFC calculations based on National Treasury data

4. 4.T HE C HALLENGE WITH E LECTRICITY D ISTRIBUTION I NDUSTRY Estimated that backlogs grow by R1.6 billion per annum (2011 Infrastructure Report Card, SAICE) – Municipalities not increasing portion of budgets dedicated to repairs and maintenance and refurbishment – Monitoring of maintenance and refurbishment expenditure on electricity challenging due to lack of disaggregation in budget formats etc – Is current approach to funding repairs and maintenance appropriate? Presently municipalities fund repairs and maintenance from their operating budgets – Limited resources in the face of significant non-payment – Historically tariffs not cost-reflective (NT, 2011) - move by NERSA to encourage more accurate costing of tariffs in line with Section 74 of Municipal Systems Act – Policy uncertainty as a result of unresolved restructuring process

4. 4.A CTUAL C APITAL E XPENDITURE BY S ECTOR, 2003/ /13 (R EAL ) Public Hearings on EDI, 25 July 2012 Figure highlights declining investment in electricity relative to other sectors Source: FFC calculations based on National Treasury data

4. 4.I MPLICATIONS OF THE C URRENT S ITUATION Compromised service delivery Higher subsequent repair costs places strain on public finances Distorted linkages in the economy: impacts on productivity and profitability of companies Contributes to increased backlogs Stalled EDI restructuring process creates policy uncertainty, thus affecting investment in the sector Impact of generation issues on distribution side Demand management including use of alternative green sources Public Hearings on EDI, 25 July 2012

5. 5.P REVIOUS A TTEMPT TO R ESTRUCTURE EDI Restructuring process initiated during the late nineties Aimed to establish six wall to wall regional electricity distributors (REDs) that would take over assets and functions from Eskom and municipal distributors Significant financial and human capital resources dedicated to this – EDI Holdings set up in 2003, 17 th Constitutional Amendment proposed in 2009 – Cabinet decision to discontinue the reform process in December 2010 – No indication of an alternative – Restructuring remains an outstanding issue Public Hearings on EDI, 25 July 2012

5. 5.L ESSONS FROM P REVIOUS EDI R EFORM A TTEMPT Reform should not be piecemeal but should address the entire electricity value chain (generation, transmission and distribution) – White Paper on Energy envisaged a two-pronged, all-encompassing reform process of the electricity sector focussed on EDI and the electricity supply industry Address root causes of the challenge – Poor performance may be as a result of ill defined mandates, poor regulation (is NERSA adequately fulfilling its role?), lack of funding (especially repairs and maintenance), poor managerial skills and leadership capacity (lack of capacity a well documented challenge especially with respect to municipal distributors) Differentiated reform approach that recognises variances in performance of individual electricity distributors to be considered – Not all municipal distributors perform poorly – Further research needed on capacity of municipalities, costs involved etc

5. 5.L ESSONS FROM P REVIOUS EDI R EFORM A TTEMPT ( CONT.) Take municipalities on board from the start – Electricity distribution is listed as a municipal function in the Constitution, however Municipal Systems Act (Sections 82 and 87) allows for responsibility for service delivery to be delegated to another party – Ensure that revenue of municipalities is not compromised as it is used to cross-subsidise delivery of other municipal services – If approach is to delegate distribution to a third party, careful consideration should be given to ability/capacity of municipalities to conduct adequate oversight over activities. This is critical in ensuring that social objectives are maintained Public Hearings on EDI, 25 July 2012

5. 5.V IABILITY OF A GENTISATION Does a good business case exist for outsourcing to an agency? – Proper lines of accountability should be defined at the start of the process – How will it work in practice - how will agency interact with municipality and sector department? Weigh potential benefits and risks – Perhaps outsourcing brings better skills/management, but one of the risks relates to the increase in transaction costs for the consumer – i.e. Presently municipalities provide a one stop shop with respect to basic services for residents, investors, developers If electricity distribution is taken away from municipalities, we risk ability to ensure integrated service delivery – consumers will have to deal with different service providers for different services Public Hearings on EDI, 25 July 2012

6. 6.R ECOMMENDATIONS FFC Recommendations on EDI and Electricity Demand Management (Submission for DoR 2011/12 and 2012/13) Government should – Revisit the Blue Print assumptions initially made to restructure the EDI, specifically regarding whether it is necessary to change ownership and structure in order to ensure efficiency, economies of scale, robust regulations and to deal with management challenges in the sector – Conduct an up-to-date re-evaluation and analysis of the costs and benefits of restructuring the EDI – Finalise legislation and practical guidelines around restructuring prior to moving towards more advanced stages of restructuring – Universal access to electricity should not be lost in EDI restructuring process – to be coupled with strong emphasis on demand side management and greener technologies – Any restructuring embarked upon should take a differentiated approach Metro’s and high capacity municipalities relative to those municipalities that are not able to effectively deliver - consider establishment of multi-jurisdictional service utilities

6. 6.R ECOMMENDATIONS FFC Recommendations on EDI and Electricity Demand Management (Submission for DoR 2011/12 and 2012/13) – Balance maximising potential benefits associated with outsourcing with minimising attendant risks – If outsourcing/use of an agency is the preferred route, it is critical to link this to the capability and capacity of parent municipality and NERSA, as the regulator, to effectively conduct oversight Government should consider a performance-based conditional grant which rewards or incentivises actions that are energy efficient – Specific focus areas for this grant should include: Efficient energy management practices, including minimisation of electricity losses (unaccounted for electricity), elimination of illegal connections and energy savings by households and industry Grant to support new technologies and other innovations that will ensure efficient energy utilization Grant to support implementation of green procurement principles

6. 6.R ECOMMENDATIONS ( CONT.) Municipalities should prioritise development of maintenance plans, maintenance management system and production of maintenance reports. Municipalities are not doing so, FFC analysis shows that spending on this item is less than 5% of operational expenditure (FFC, 2011/12) – More focus should be directed towards preventative maintenance Development of asset registers as required in terms of Section 63 of MFMA should be enforced Government should develop norms on minimum acceptable maintenance levels – Mechanisms should be put in place to monitor cost of, and municipal spending on, maintenance by sector Public Hearings on EDI, 25 July 2012

6. 6.R ECOMMENDATIONS Government should consider an alternative/innovative approach to funding repairs and maintenance – Rehabilitation fund (once off)? Ring fenced funding (can not be a permanent solution)? – Development and implementation of models for life-cycle costing of infrastructure (operational and rehabilitation) to be emphasised – FFC is conducting research on this matter in its current research cycle Government should work with NERSA to put in place a financing framework that deals effectively with electricity pricing – There is a need to ensure sustainable price increases that do not lead to high levels of non-payment

6. 6.G OING F ORWARD Commission would welcome opportunity to be part of the process going forward and commenting on restructuring option selected In the Commission’s view, a comprehensive plan to restructure the EDI will incorporate the following aspects: – Clear understanding of what exactly is status quo within municipalities – do municipalities want the distribution function, costs involved in restructuring, lessons learned from previous reform attempt – Clarity regarding accountability of service authority versus service provider – Revenue distribution (where will funding flow from/to) – Implementation (how will transfer of assets/liabilities be dealt with) – Incentives for demand management and for diversifying access to alternative green sources of energy

T HANK Y OU. Financial and Fiscal Commission Montrose Place (2 nd Floor), Bekker Street, Waterfall Park, Vorna Valley, Midrand, Private Bag X69, Halfway House Tel: Fax: