Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.

Slides:



Advertisements
Similar presentations
ALICE TOF FESTIVAL Offline tools and GRID scenario for the ALICE TOF detector A. De Caro (University of Salerno and INFN) CERN – Bdg.29, October 20 th.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Multiplicity analysis and dN/d  reconstruction with the silicon pixel detector Terzo Convegno Nazionale sulla Fisica di ALICE Frascati (Italy) – November.
Terzo Convegno sulla Fisica di ALICE - LNF, Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group.
TOF offline and calibration A. De Caro (University and INFN of Salerno)
Daniele De Gruttola (TOF group – Salerno University and INFN ) 2009 cosmic rays data analysis 09/Dec/09 ALICE - TOF meeting - CERN.
HLT & Calibration.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
ALICE HLT High Speed Tracking and Vertexing Real-Time 2010 Conference Lisboa, May 25, 2010 Sergey Gorbunov 1,2 1 Frankfurt Institute for Advanced Studies,
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Matching between charged tracks and electromagnetic calorimeter (EMCAL) clusters in ALICE Alberto Pulvirenti University & INFN Catania ACAT 2007 Conference.
TPC online reconstruction Cluster Finder & Conformal Mapping Tracker Kalliopi Kanaki University of Bergen.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
AMS Tracker Data Reduction Status Claude Zurbach Laboratoire de Physique Théorique et Astroparticules – Montpellier Houston, AMS-TIM, January 08, 2007.
TOF, Status of the Code F. Pierella, Bologna University and INFN TOF Offline Group ALICE Offline Week, June 2002.
Track extrapolation to TOF with Kalman filter F. Pierella for the TOF-Offline Group INFN & Bologna University PPR Meeting, January 2003.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
PWG3 Analysis: status, experience, requests Andrea Dainese on behalf of PWG3 ALICE Offline Week, CERN, Andrea Dainese 1.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
HMPID offline status report D. Di Bari, L. Molnar, G. Volpe ALICE Offline Week, CERN, 22 June 2009.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Status of global tracking and plans for Run2 (for TPC related tasks see Marian’s presentation) 1 R.Shahoyan, 19/03/14.
HLT Kalman Filter Implementation of a Kalman Filter in the ALICE High Level Trigger. Thomas Vik, UiO.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
The ALICE Experiment Event by Event fluctuations ALICE TOF Calibration 30th November 2007Chiara Zampolli1.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Summary of User Requirements for Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Offline Week Alignment and Calibration Workshop February.
Summary of Workshop on Calibration and Alignment Database Magali Gruwé CERN PH/AIP ALICE Computing Day February 28 th 2005.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Calibration algorithm and detector monitoring - TPC Marian Ivanov.
17 December 2009J. Schukraft1 First Physics at the LHC seen through the eyes of ALICE.
The Performance of the ALICE experiment for cosmic ray physics B. Alessandro, V. Canoa, A. Fernández, M. Rodríguez, M. Subieta for the ALICE Collaboration.
Thomas Ruf, CERN EP Experience with C++ and ROOT used in the VX Beam Test Thomas Ruf, CERN, EP  Why? Event structure for VX-data rather complex: raw hits.
ALICE Offline Week – 22 Oct Visualization of embedding Matevz Tadel, CERN Adam Kisiel, Ohio State University.
DIS 2011, Newport News, April 2011Joakim Nystrand, University of Bergen 1 Small-x and forward measurements in ALICE Joakim Nystrand University of.
I.BelikovWeekly Offline Meeting, CERN, 14 Sep Common track parameterization for the barrel detectors.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
Time-zero evaluation using TOF, T0 and vertex detectors
Detection of atmospheric muons using ALICE detectors
Calibrating ALICE.
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
HLT & Calibration.
Open heavy flavor analysis with the ALICE experiment at LHC
Presentation transcript:

Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting

Data acquisition: preparation  Definition status of readout channels (offline condition database):  on/off: Front-End Electronics database, coming from Detector Control System  dead/alive (pulser runs)  noisy/not-noisy (noise runs)  Definition of reconstruction parameters (offline condition database) –from Montecarlo studies-:  matching window,  2 track cut, etc.  Definition of alignment parameters (alignment database)  Definition of calibration parameters (calibration database) CERN Building 29, December 9th, 2009A. De Caro 2ALICE TOF General meeting

When a run acquisition ends…  In case of physics runs:  a fast procedure calculates the first raw calibration parameters  For cosmic runs and first collisions, these raw parameters are the ones obtained with cosmic data calibration procedure (see R.Preghenella talk).  For future collisions, the raw calibration parameters will be the delays with respect to the expected time for primary pions at  =1 (see C.Zampolli talk).  Then, these raw calibration parameters are written to the calibration database.  In case of noise/pulser runs:  The status of all TOF channels is written in the offline condition database. CERN Building 29, December 9th, 2009A. De Caro 3ALICE TOF General meeting

Run reconstruction (1) It is a public and global work. It runs on the GRID (see F.Noferini talk).  Raw data decoding  Each detector has developed its own code decoding, tested on the Montecarlo data and then tuned on the cosmic data.  At this point the TOF channel status is controlled in the offline condition database.  Tracking  The ALICE tracking detectors (TPC -main-, ITS and TRD) collect together their own clusters to form tracks CERN Building 29, December 9th, 2009A. De Caro 4ALICE TOF General meeting

Run reconstruction (2)  Track matching with the other detectors  Each external barrel detector -first of all TOF, then HMPID, PHOS and EMCal- has developed and provided its own code of detector- track matching.  At this point the calibration and the alignment parameters are taken into account. The whole experiment code is public and available to all. The TOF code as seen offline has just been checked by the ALICE Detector Performance Working Group Coordinator on p-p 900 GeV: “All this is getting more and more interesting !” CERN Building 29, December 9th, 2009A. De Caro 5ALICE TOF General meeting

What did I do? And what am I doing?  I checked/debugged:  the proper functioning of the noisy/not-noisy TOF channel definition;  that the reconstruction parameters used to reconstruct real events (i.e. cosmic and first p-p collision runs) were the right ones;  the TOF raw data decoding.  Chiara and I are checking the fast online TOF calibration procedure.  I am checking the TOF-track matching algorithm.  For my studies as well as for first data analysis, the event display is a very useful analysis tool. I implemented the TOF event display code and I am still developing and updating it. CERN Building 29, December 9th, 2009A. De Caro 6ALICE TOF General meeting

One of cosmic  s triggered and seen by ALICE TOF detector CERN Building 29, December 9th, 2009A. De Caro 7ALICE TOF General meeting

September 25 th, 2009: injection test TOF occupancy ~50% CERN Building 29, December 9th, 2009A. De Caro 8ALICE TOF General meeting

November 21 st, 2009: beam-gas collision seen by ALICE TOF detector  z V is the interaction vertex distance from the ALICE reference system centre. It has been estimated to be ~6.2 m (only via TOF time measurements) zVzV CERN Building 29, December 9th, 2009A. De Caro 9ALICE TOF General meeting

November 21 st, 2009: beam-gas collision seen by ALICE TOF detector CERN Building 29, December 9th, 2009A. De Caro 10ALICE TOF General meeting

November 21 st, 2009: beam-gas collision seen by ALICE TOF detector CERN Building 29, December 9th, 2009A. De Caro 11ALICE TOF General meeting

December 6 th, 2009: first p-p collisions seen by ALICE TOF detector also CERN Building 29, December 9th, 2009A. De Caro 12ALICE TOF General meeting

December 6 th, 2009: first p-p collisions seen by ALICE TOF detector also CERN Building 29, December 9th, 2009A. De Caro 13ALICE TOF General meeting