THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.

Slides:



Advertisements
Similar presentations
THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Advertisements

Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
24Oct2013 D. Seitz SPP FIELDS RFS Analog Peer Review 24OCT
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR217 RBSP Electric Field and Waves Instrument (EFW) Instrument.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
FGM peer PDR I/F - 1 Braunschweig, October 8-9, 2003 Digital Interface (I/F) Aris Valavanoglou Institut für Weltraumforschung (IWF) Austrian Academy of.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Operational Concept.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
Solar Probe Plus FIELDS MAG Peter Harvey. MAG FSW Requirements.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Engineering Peer Review Overview Dr. John W. Bonnell and the.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
THEMIS Mission CDREFI- 1 UCB, June 14-18, 2004 EFI Subsystem Design, Fabrication, and Test Status.
Status 1 5/07/08 UCB RBSP EFW STATUS 5/07/08. Status 2 5/07/08 UCB Agenda Project Stuff Monthly Report Submitted Schedule Submitted  Milestones Upcoming.
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Solar Probe Plus – FIELDS Main Electronics Package
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
ESA Plasma Analyzer Instrument
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
Bill Donakowski Mechanical Engineer UCB/SSL
(EFW Systems Engineer) University of California, Berkeley
ESA GSE.
Instrument Data Processing Unit (IDPU)
SP+ DFB REE 12/01/12.
Boom Electronics Board (BEB)
Preliminary Design Review
Radiation Belt Storm Probes Electric Field and Waves Instrument
THEMIS FM4/FM5 INSTRUMENT SUITE
Low Voltage Power Supply & Power Controller Board
Presentation transcript:

THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test

THEMIS Engineering Peer Review 2 UCB, October 15-16, 2003 Electrical Fab and Test (1) Preamp ETU electrical and mechanical fab and assy at UCBSSL. ETU functional test and calibration (power; stability; basic AC/DC transfer fctn., linearity, sm/lg signal response) with Cluster spare cable and BEB breadboard or ETU, and prototype EFI test fixtures. ETU thermal stress test (l-N2) (TBD). Flight electrical fab and assy in-house (Silver 180 as clean Flight assy. area). Flight functional test and calibration (as above) with flight cable, BEB ETU, and EFI test fixtures. Flight thermal stress test (TBD).

THEMIS Engineering Peer Review 3 UCB, October 15-16, 2003 Electrical Fab and Test (2) BEB ETU electrical and mechanical fab and assy at UCBSSL. ETU functional test and calibration (power; stability; basic AC/DC transfer fctn., linearity, sm/lg signal response; bias system response and accuracy). Flight electrical fab and assy TBD (Addition TBD as clean Flight assy. area). Flight functional test and calibration (as above). MCB ETU electrical and mechanical fab and assy at UCBSSL. ETU functional test and calibration (power over voltage range). Integration into SPB ETU. Flight electrical fab and assy TBD (Addition TBD as clean Flight assy. area). Flight functional test and calibration (as above). Integration into SPB Flight unit.

THEMIS Engineering Peer Review 4 UCB, October 15-16, 2003 Electrical Fab and Test (3) II&T EFI/BEB Full-Flight functional Test and Calibration using EFI/BEB GSE (automated; one axis at a time; power, stability; detailed AC/DC transfer fctn., linearity, sm/lg signal response; bias system response and accuracy) (3 days). Limited functional test and calibration with temperature during II&T TVAC using internal test functionality (power; basic DC transfer fctn.). End-to-end fields calibration (SCM, EFI/BEB, FGM and DFB) (may be combined with full-flight functional test and calibration). SC I&T Functional tests using internal test functionality only (basic DC gain; AC response, if stable in stowed config.).

THEMIS Engineering Peer Review 5 UCB, October 15-16, 2003 Electrical GSE Block Diagram of EFI/BEB GSE

THEMIS Engineering Peer Review 6 UCB, October 15-16, 2003 Electrical GSE Requirements (1) Power/Thermal/Mechanical Provide regulated voltages. Facilitate current measurements. 6U VME support (w/out Wedgelocks) for BEB. Portable and rugged for transport. Open rack for access while under test. Connectors acceptable for Flight interconnection Electrical Interface Backplane interface per IDPU backplane specification. 1 MUX’d analog housekeeping output (ANA HSK). GSE interface circuitry must be flight-grade.

THEMIS Engineering Peer Review 7 UCB, October 15-16, 2003 Electrical GSE Requirements (2) Command and Telemetry Handling GSE sends 24-bit CDI commands per ICD specification. Command format is compatible with IDPU and MOC GSE (TBD). Before DFB and DCB, data is from GSE’s IEEE-1394 ADC. Afterwards data is extracted from telemetry. Test Support Equipment GSE controls GPIB function generator and +/- 100-V supplies. “Faraday cage”-type test fixture (pairs for SPB and AXB). Compatibility with Next Level of Integration Uses ITOS, LabWindows (or equiv), C. PC standards. Easy accessibility to data for offline processing (FTP, HTTP, etc.).

THEMIS Engineering Peer Review 8 UCB, October 15-16, 2003 Electrical GSE Requirements (3) Data Manipulation and Display Plot any of 16 channels over user-specified timespan. Calculate 2N-point FFT on user-specified channels. Compute and display power spectra and transfer functions of user-specified channels. Display control values for GPIB and GSE interface equipment. Support hardcopy output. Raw and derived data, as well as configuration information stored in tabular ASCII format file. Data manipulation and display scriptable to allow for automation of test and cal procedures.