Consortium Meeting La Palma October 1-2 2008 ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – 2 2008 ICC Status Tanya Lim RAL.

Slides:



Advertisements
Similar presentations
TeraGrid Deployment Test of Grid Software JP Navarro TeraGrid Software Integration University of Chicago OGF 21 October 19, 2007.
Advertisements

Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
PopMedNet Software Development Life Cycle Chayim Herzig-Marx Harvard Pilgrim Health Care Institute Daniel Dee Lincoln Peak Partners.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Data Processing and User Software Ken Ebisawa (Astro-E2 GOF) presentation and demonstration.
26-28 th April 2004BioXHIT Kick-off Meeting: WP 5.2Slide 1 WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution.
Foundation Degree IT Project Methodologies (for reference)
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
TAYLOR’S PROFESSIONAL SERVICES STAFFING REQUEST MANAGEMENT SYSTEM By Cale Coyle, Michael Kozy, Brian Maerhofer, Christopher Ozaetta, David Rigsby.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Astrid: Astronomer’s Integrated Desktop Session 1: Introduction to Astrid & User Interface Overview October 5, 2005 Amy Shelton
End HomeWelcome! The Software Development Process.
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 13 Post-Implementation Training.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 SPIRE Day team, goals, schedule, logistics Bernhard Schulz NHSC/IPAC.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
The LCG SPI project in LCG Phase II CHEP’06, Mumbai, India Feb. 14, 2006 Andreas Pfeiffer -- for the SPI team
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Slide 12.1 Chapter 12 Implementation. Slide 12.2 Learning outcomes Produce a plan to minimize the risks involved with the launch phase of an e-business.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
17 th October 2005CCP4 Database Meeting (York) CCP4(i)/BIOXHIT Database Project: Scope, Aims, Plans, Status and all that jazz Peter Briggs, Wanjuan Yang.
IT – JINR Collaboration by Jürgen Knobloch CERN-JINR Meeting 20 th October 2005 This file is available at:
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
PACS NHSC Data Processing Workshop – Pasadena 10 th - 14 th Sep 2012 HIPE Introduction and Setup for SPIRE David Shupe, NHSC/IPAC on behalf of the SPIRE.
Module 8: Managing Software Distribution. Collections Packages Programs Advertisements Collections Packages Programs Advertisements How Software.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Module 9 Planning and Implementing Monitoring and Maintenance.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
08-Nov-2007 Ekkehard Wieprecht SVR III MPE PCSS / HCSS / Pipeline Framework.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
1 Universities Space Research Association Martin Ruzek SSSC February 18, 2010 FIFI LS EOOP Extended Observing Opportunity Program Operating FIFI LS in.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Gabriele Mainetti (GM) [Dottorando.
PACS page 1 NHSC SPIRE Data Processing Webinars 8 th Feb 2012 PACS page 1 Overview of SPIRE Photometer Pipeline C. Kevin Xu (NHSC/IPAC)
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Preparing HIPE for SPIRE work David Shupe, NHSC/IPAC on behalf of the SPIRE ICC.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
PACS ICC Readiness Review MPE, July 3/ Extended-DP 1/13 E. Sturm: Extended-DP Eckhard Sturm.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
The information systems lifecycle Far more boring than you ever dreamed possible!
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
People Inc. from P&A Software
Cloud readiness assessment
ARTIFICIAL INTELLIGENCE IN SOFTWARE TESTING
Foundation Degree IT Project
Configuration Management
The Survival Plan.
Presentation transcript:

Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL

Consortium Meeting La Palma October ICC Status Tanya Lim 2 ICC Organisation

Consortium Meeting La Palma October ICC Status Tanya Lim 3 SPIRE ICC Systems Overview Several machines based at RAL but with access from all ICC sites… Propagated Database(s) Remote access e.g. via QLA, ObsExporter Product Pools Data Processing and Calibration Products Operational Software and Results (Health Monitoring, Operational Day logging, Trend Analysis etc) Common Uplink System Helpdesk system (RAL) Websites TWiki based at Leuven (main site for information sharing) Wiki based at NHSC (NHSC analysis and results) Test Team Website based at RAL (Test Data) HSC/ESTEC Sites hosting SxR system, NCR system and documentation

Consortium Meeting La Palma October ICC Status Tanya Lim 4

Consortium Meeting La Palma October ICC Status Tanya Lim 5 Operations Team Status Operational Procedures and Interactions Instrument Users Manual Helpdesk SPIRE mailbox is operational AOT Maintenance and Testing CUS Scripts and Procedures Operational Day Logging Instrument Health Monitoring Trend Analysis

Consortium Meeting La Palma October ICC Status Tanya Lim 6 Calibration Team Status PV Phase Planning Observation Definition Testing PV Phase Uplink Calibration File Design and Population DP Calibration File Design and Population DP Calibration File Testing

Consortium Meeting La Palma October ICC Status Tanya Lim 7 Observations Group Status DP Requirements Acceptance Testing Scientific Validation

Consortium Meeting La Palma October ICC Status Tanya Lim 8 Software Team Status SPIRE Data Processing Development So far mostly pipeline oriented although some display tool development has also taken place Full integration into HIPE in progress Interactive Analysis By design pipeline modules can be used for interactive analysis and all tasks can be run interactively, Effort will move to interactive analysis development between now and launch Integration with HIPE is a major step in this process Extended Work Packages Contribution to HCSS/DP

Consortium Meeting La Palma October ICC Status Tanya Lim 9 Summary The ICC is moving forward with a good working structure This will be maintained going into operations The work division between the teams is generally well understood The work is generally on track to be ready for operations, However, staffing (and expertise of staff) is a perennial issue which remain Many thanks to Ken!