LAL Site Report Michel Jouvin LAL / IN2P3

Slides:



Advertisements
Similar presentations
Presented by Ben Serebin Tue, June 15, Every 2 nd Tuesday of the Month. Same Time and Place Visit for Presentation.
Advertisements

© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Installation & management of SUSE.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
The RHIC-ATLAS Computing Facility at BNL HEPIX – Edinburgh May 24-28, 2004 Tony Chan RHIC Computing Facility Brookhaven National Laboratory.
Monday 24 May 2004DAPNIA/Pierre-Francois Honore1 DAPNIA site report.
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Liverpool HEP – Site Report May 2007 John Bland, Robert Fay.
HEPIX May 2004 Edinburgh Linux/Unix highlights.
Anti-SPAM experience at LAL Michel Jouvin LAL / IN2P3
SUS Feature Pack for SMS Michel Jouvin LAL / IN2P3
Site Report Stephan Wiesand DESY -DV - May 24, 2004.
Gareth Smith RAL PPD HEPiX Report NESC, Edinburgh May Windows stuff etc.
RAL Particle Physics Dept. Site Report. Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental.
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Physics Network Integration Chris Hunter. Physics network team Chris Hunter : Network Manager David Newton : Network Support Technician Room DWB 663 Phone.
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
LAL Site Report Michel Jouvin LAL / IN2P3
6/4/2015H. Schwendicke1 Reinhard Baltrusch, Helga Schwendicke, Gunter Trowitzsch Total Virus Defense Licensing Installation Updates Lovesan/
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall SLAC.
GRIF Status Michel Jouvin LAL / IN2P3
Guide to Operating System Security Chapter 2 Viruses, Worms, and Malicious Software.
Improving Customer Satisfaction Through Advances in Remote Management Technology Greg Michel Product Manager Quintum Technologies Inc.
The PC Evolution  Began in the late 1970’s with the development of 4 bit and 8 bit microprocessors  Market penetration started with the MAC and IBM PC.
Edinburgh Site Report 1 July 2004 Steve Thorn Particle Physics Experiments Group.
Managing CERN Desktops with Systems Management Server (SMS 2003) Michel Christaller Internet Services Group Department of Information Technology CERN May.
31/10/2000NT Domain - AD Migration - JLab 2000 NT DOMAIN - ACTIVE DIRECTORY MIGRATION Michel Jouvin LAL Orsay
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
Site report: CERN Helge Meinhard (at) cern ch HEPiX fall BNL.
Introducing… …taking desktop computing to the cloud making business effortless!
Successful Deployment and Solid Management … Close Relatives Tim Sinclair, General Manager, Windows Enterprise Management.
Jefferson Lab Site Report Sandy Philpott Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
DECS Community IT DIVISION OF ENGINEERING COMPUTING SERVICES Michigan State University College of Engineering.
CIS 460 – Network Design Seminar Network Security Scanner Tool GFI LANguard.
Patch Management Only part of the solution….. Bob Isaak Mar 04, 2004.
Site Report HEPiX/HEPNT 17 April 2002 Catania Paul Kuipers.
LAL Site Report Michel Jouvin LAL / IN2P3
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
PC MANAGER MEETING January 23, Agenda  Next Meeting  Training  Windows Policy  Main Topic: Windows AV Service Review.
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
1 CERN’s Computer Security Challenges Denise Heagerty CERN Computer Security Officer Openlab Security Workshop, 27 Apr 2004.
30/10/2000 Software Installation and Maintenance at LAL - JLab 2000 Software Installation and Maintenance at LAL Michel Jouvin LAL, Orsay
SLAC Site Report Chuck Boeheim Assistant Director, SLAC Computing Services.
RAL Site Report Andrew Sansum e-Science Centre, CCLRC-RAL HEPiX May 2004.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
LAL Site Report Michel Jouvin LAL / IN2P3
LAL Site Report Michel Jouvin LAL / IN2P3
Update on  Mail Gateways  Servers  Spam Tagging  Anti-Virus  IMAP  Web Mail  LISTSERV  POP.
File sharing requirements of remote users G. Bagliesi INFN - Pisa EP Forum on File Sharing 18/6/2001.
October, HEPiX Fall 2005 at SLACSLAC Site Report Roberto Gomezel INFN.
26/4/2001LAL Site Report - HEPix - LAL 2001 LAL Site Report HEPix – LAL Apr Michel Jouvin
Cluster Configuration Update Including LSF Status Thorsten Kleinwort for CERN IT/PDP-IS HEPiX I/2001 LAL Orsay Tuesday, December 08, 2015.
1CEA – DAPNIA - Saclay05/19/2003 CEA Saclay site report Amsterdam.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
Auger & XtremWeb: Monte Carlo computation on A Global Computing platform O. Lodygensky, G. Fedak, V. Neri, A.Cordier, F. Cappello Laboratoire de l’Accelerateur.
Randy MelenApril 14, Stanford Linear Accelerator Center Site Report April 1999 Randy Melen SLAC Computing Services/Systems HPC Team Leader.
LAL Site Report Michel Jouvin LAL / IN2P3
IN2P3 AD Forest Project Michel Jouvin LAL / IN2P3
23 January 2007WLCG workshop, CERN System Management Working Group Alessandra Forti WLCG workshop CERN, 23 January 2007.
IPS Infrastructure Technological Overview of Work Done.
1/11/2000LAL Site Report - HEPix - JLab 2000 LAL Site Report HEPix – Jlab Nov Michel Jouvin
Ole’ Miss DOSAR Grid Michael D. Joy Institutional Analysis Center.
12/3/98 Stanford Linear Accelerator Center Patrick R. Hancox
Creating Grid Resources for Undergraduate Coursework John N. Huffman Brown University Richard Repasky Indiana University Joseph Rinkovsky Indiana University.
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
2016 Citrix presentation.
DAPNIA Site report.
HEPix - SLAC 99 Michel Jouvin
Presentation transcript:

LAL Site Report Michel Jouvin LAL / IN2P3

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Main Resources NFS SMB Appletalk www Mail Print LSF Cluster Gb Ethernet DS20 PC (300)Mac (100) Linux Experiments (30 CPUs) DS20e 10 Mb Alpha Experiments (8 CPUs) Electronic CAD (Sun + Cadence) 100 Mb 100 Go Xterm ESA ,5 TB FC HDS TB FC GRID Fram (10 CPUs)

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Main Resources Changes More Linux CPUs –25 dual Opteron 2,2 on order (IBM E325, 1U) More TBs –HDS 9570V : 2,5 TB added Running very well Less budget… –Budget uncertainty (always changing) No OS upgrade since last meeting

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Mail Service Virus/Spam filtering production –Spam Assassin + MimeDefang –Tunning in progress to increase efficiency (~70%) Late with all our main projects for mail service –SIEVE for filtering at message delivery (server based) –Upgrade IMAP server to Cyrus v2 Required for SIEVE filtering –Authenticated SMTP Conversion of our current SASL db for transparent user migration with same password db for IMAP and Sendmail

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Windows Infrastructure IN2P3 forest in production –9 labs in production (8 sites) –4 labs should join shortly (by the end of June) –No problem so far… –Forest management not to heavy Domain management delegated to labs Move of LAL domain to IN2P3 forest delayed –Planned this summer –Challenge : transparent to users, preserving GPOs –Back to NT4 domain and reupgrade to ActiveDirectory (2003)

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Virus Not too much affected –Ports attacked filtered in border router –2 PCs infected by Sasser outside LAL –Checking is time consuming… –Proactive patch installation is critical Main tool : SMS –Rapid deployment of fixes : 2 hours for 90% of running PCs –Integrating SMS and SUS : SUS feature pack SUS integrated with SMS inventory and logging capabilites

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Resources Monitoring Operation Control Center (Tableau de bord) –LAL Solution based on Nagios and RRDTools –HTML front end with a service oriented view Grouping / aggregation of Nagios status –Alerts and notifications capabilities –Proactive/corrective actions associated with alerts –Performance data with RRDTools (former MRTG) Services monitored by plugins –Almost everything can be monitored –No platform / OS dependency Remote execution of plugins through SSH

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Operation Control Center

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Operation Control Center

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 GRID Strong involvement from LAL in EDG / LCG / EGEE –3 FTE during EDG/LCG (including EDG Integration Team leader) –EGEE : 1 of the official french site, 2 FTE funded 1 middleware, 1 application deployment –Fabric update : 26 CPUs to be added shortly (total : 36) Mainly Xeon 3 Ghz and Opteron 2,2 Ghz Involved in a P2P computing project (XtremWeb) –Partnership with LRI (Orsay, computing research) –1 FTE (LAL engineer preparing a PHD) –30 CPUs (mainly Xeon 3 Ghz and Opteron 2,2 Ghz) –LAL interest : use of P2P ressource as a fabric via OGSA

24/5/2004 LAL Site Report - HEPix - Edinburgh 2004 Miscellaneous Projects Unattended Linux installation server –Currently based on Kickstart for initial installation –Still planning to investigate EDG WP4 Quattor Initial installation and updates Servers and desktops In conjunction with EGEE involvement (P. Ponianski may join LAL) Automatic visitor registration and DHCP quarantine –Coupled with a rework of our computers database –Expected one fellow but he resigned after 2 weeks…