SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration 6-11.

Slides:



Advertisements
Similar presentations
Report from: the High Intensity Stable Beam Working Group HISB-WG Marie-Helene Moscatello (GANIL) Annamaria Porcellato (Legnaro) Uli Ratzinger (GSI) Faical.
Advertisements

08/06/2009: HIAT09 Mattia Manzolaro, SPES Target Group 1/30 The SPES Project: research and development for the multi-foil direct target M. Manzolaro 1,3,
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
EURISOL Transition period MYRRHA and
Alpha Stucture of 12 B Studied by Elastic Scattering of 8 Li Excyt Beam on 4 He Thick Target M.G. Pellegriti Laboratori Nazionali del Sud – INFN Dipartimento.
Γ spectroscopy of neutron-rich 95,96 Rb nuclei by the incomplete fusion reaction of 94 Kr on 7 Li Simone Bottoni University of Milan Mini Workshop 1°-
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
S. Sidorchuk (JINR, Dubna) Dubna Radioacive Ion Beams DRIBsIII: STATUS and PROSPECTS S. Sidorchuk (JINR, Dubna) 9-16 May 2013, Varna, Bulgaria 1.
Congresso del Dipartimento di Fisica Highlights in Physics –14 October 2005, Dipartimento di Fisica, Università di Milano Study of exotic nuclei.
SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration.
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Carbon Injector for FFAG
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
Heavy Ion Laboratory Warsaw University Jarosław Choiński.
Heavy Ion Accelerator for RIB KoRIA in International Science & Business Belt S. W. Hong Sungkyunkwan University S. W. Hong Sungkyunkwan University Nov.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Neutron transfer reactions at large internuclear distances studied with the PRISMA spectrometer and the AGATA demonstrator.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 104 th Session, 25 September 2008, Dubna.
E. Fioretto Joint EURISOL-EURONS Town meeting Helsinki, INFN-LNL, Legnaro (Padova), Italy INFN-LNS, Catania, Italy Transnational Access to LNL-LNS.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
Radioactive ion beam production at other facilities
Nuclear structure and fundamental interactions Solid state physics Material irradiation Micrometeorite research and study Astrophysics Nuclear astrophysics.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
SPES. 1.Develop a Neutron Rich ISOL facility delivering Radioactive Ion Beams at 10AMeV using the LNL linear accelerator ALPI as re-accelerator. 2.Make.
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
Accelerator Physics, JU, First Semester, (Saed Dababneh). 1 Electron pick-up. ~1/E What about fission fragments????? Bragg curve stochastic energy.
Status Report of the LISOL Laser Ion Source Yu.Kudryavtsev, T.Cocolios, M.Facina, J.Gentens, M.Huyse, O.Ivanov, D.Pauwels, M.Sawicka, P.Van den Bergh,
ISOLDE-RISP meeting ~ ~20 Rare Isotope Science Project Sun Kee Kim Rare Isotope Science Project (RISP) Institute for Basic Science.
Prospects to measure 8 B production VLADIMIR KRAVCHUK Laboratori Nazionali di Legnaro, Italy EUROnu week in Strasbourg 1-4 June 2010.
1 Programme Advisory Committee for Nuclear Physics 29 th meeting, January 2009 Programme Advisory Committee for Nuclear Physics 29 th meeting,
The INFN Italy EXOTIC group Milano, Napoli, Padova, NIPNE Romania, Crakow Poland. Presented by C.Signorini Dept. of Physics and Astronomy Padova (Italy):
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
Laboratori Nazionali del Sud Start EXCYT status and perspectives L. CELONA on behalf the EXCYT collaboration Istituto Nazionale di Fisica Nucleare-Laboratori.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
D. Scarpa 1, P. Nicolosi 2,3, A. Franci 2, A. Tomaselli 6, M. Manzolaro 1, S. Corradetti 1,4, J. Vasquez 1,5, M. Rossignoli 1, M. Calderolla 1, A. Monetti.
How can one produce rare isotopes? Question Slid 3 Hendrik Schatz NNPSS 2012, Slide 3 Rare Isotope Production Techniques: Uniqueness of FRIB Target spallation.
A. Andrighetto 1, S. Corradetti 1,2, M. Manzolaro 1, L.A.C. Piazza 1, G. Prete 1, D. Scarpa 1,A.Tomaselli 3 J.A. Vasquez 1 SPES Laser Activities IPAC ‘12.
Laser activities at University of Pavia in support to SPES project Daniele Scarpa.
Reinhard Kulessa1 Polish-German Meeting on the New International Accelerator Facility at Darmstadt Present Polish-German Collaborations at GSI.
Study of possible ablations ion beams Daniele Scarpa LNL - INFN.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
SPES Target Group Solid state laser system for the SPES RIB project (classic and novel approaches) Daniele Scarpa INFN-LNL.
EURISOL-NET 27 June 2011 Alberto Andrighetto Recent results on development of the SPES production target Alberto Andrighetto LNL-INFN.
Ion Accelerator Activities at VECC
SPES Target Group Data…… INFN-CISAS-CNR collaboration The Ablation Ion Source for refractory metal ion beams A preliminary design.
SPES Selective Production of Exotic Species. SPES Steering Committee - Operative since july meetings – next on March All documents (minutes,
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Hanna Frånberg Delahaye Radioactive beam production
Entry distributions for fragments produced in deep-inelastic collisions with stable and radioactive beams For the PARIS collaboration W. Królas, M. Kmiecik,
Lecture at the MEDICIS-PROMED Summer School
Design of a General Purpose I/O Controller for Particle Accelerators
for the EURISOL Steering Committee
Acceleration of RIB using linacs
FEBIAD ion source development efficiency improvement
Superbeams with SPL at CERN
EffiCAS Efficient Facility for Ions at CAS
MINOS: a new vertex tracker for in-flight γ-ray spectroscopy
1. Introduction Secondary Heavy charged particle (fragment) production
Introduction TO PHYSICS WITH SPES
Recent Highlights and Future Plans at VAMOS
Physics Design on Injector I
The SPL-based Proton Driver at CERN
Status and perspectives of the LNS-FRIBS facility
Presentation transcript:

SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration 6-11 June 2010 Lamoura, France

The SPES LNL a multi-user project Applied Physics with proton and neutron beams 70 MeV 450  A High intensity proton linac: TRIPS source - TRASCO RFQ 30 mA, 5MeV Neutron facility for Medical, Astrophysics and Material science. Neutron source up to n s -1 Thermal neutrons: 10 9 n s -1 cm -2 ISOL BEAM FACILITY 8kW Direct Target: UCx fission s -1 Primary Beam: 200  A, 70 MeV protons from a 2 exit ports Cyclotron Re-accelerator: ALPI Superconductive Linac E>10 AMeV for A=130 Approved for construction by INFN

A second generation ISOL facility for neutron-rich ion beams and an interdisciplinary research center SPES ISOL facility Proton induced fission on UCx fission/s 8 kW on direct target SPES ISOL facility at LNL Proton driver ISOL target 1 (8kW) ISOL target 2 High Resolution Mass Spectrometer Charge Breeder Exotic beam transfer to PIAVE-ALPI Proton and neutron applications EXCYT at LNS 8Li, 11C, 21Na, 25Al, 27Si Isol target 150W Isol target 150W HV platform 260kV Total cost ~ 40 Meuro

r-process path Super Heavy stability ??? Neutron Drip Line Halo nuclei Borromean nuclei 11Li Pigmy resonance Evolution of shell nuclear structure ? SPES beams Neutron Rich Isotopes A: SPES RIB INTENSITY: exotic ions/s MeV/amu on the experimental target Understand nuclei out of the stability valley n-richndeficient Isospin & level density Besprovany Levit PLB 217(1989)1 N Z Limiting T EXCYT beams

Target 206 Pb Beam 132Xe 144Xe 144 Xe 132 Xe neutron-rich radioactive beams as a tool to investigate nuclei far from stability Coupled channel calculations (Grazing). G. Pollarolo

Laboratori Nazionali di Legnaro: site for SPES facility Laboratori Nazionali di Legnaro: site for SPES facility PIAVE HI Injector AN MV ALPI Linac 40 MVeq Tandem XTU 15 MV CN 7 MV S P E S (Selective production of exotic species) ISOL facility & applied physics Available area for EURISOL construction

SPES ISOL facility layout: Level 0 UCx Laboratory ISOL sevices Cyclotron 50 m

SPES ISOL facility layout: Level -1 Cyclotron ISOL bunker2 ISOL bunker1 Application bunker2 Application bunker1 RIB selection and transport Low energy experimental area

SPES ISOL facility layout: Target areas and services ISOL target 1 ISOL target 2 HV platforms for services

First exit port Second exit port Cyclotron vault Commercial High Current Cyclotron Cave ISOL #1 Cave ISOL #2 Proton/neutron irradiation: HALL #1 Proton/neutron irradiation: HALL #2 Main Characteristics: Beamsp ENERGY MeV Current750  A Extracted BeamsDual Port Exit  A Beam Loss< 5% Affidability5000 hours/year Main Characteristics: Beamsp ENERGY MeV Current750  A Extracted BeamsDual Port Exit  A Beam Loss< 5% Affidability5000 hours/year

SPES CYCLOTRON load work per year Targetsecondary beam Bunker (UCx)fission fragments A - B ISOL HfO 2, ZrO 2, CeO 2 FA - B ISOL B4CB4CBeA - B ISOL SiCAlA - B ISOL CeSClA - B ISOL Li, Be, Pb, W, (UO)neutronsB,C,D 2 weeks per shift Beam preparation 2 days Beam on target 12 days Beam on target  280 hours per shift Each bunker will cool down for 14 days after target irradiation. Expected Beam on target: hours per year Proton beamNumers of shift Beam on target: Total hours Bunker A ISOL 300  A 40MeV Bunker B 500  A 70MeV Bunker C 500  A 70MeV Bunker D 500  A 70MeV Maintanance77x14x24= 2350 Cyclotron Operation 1919x12x24= 5462 esperiment 19X2x24= 912 beam preparation

Surface Ion source 12 HHe LiBeBCNOFNe NaMgAlSiPSClAr KCaScTiVCrMnFeCoNiCuZnGaGeAsSeBrKr RbSrYZrNbMoTcRuRhPdAgCdInSnSbTeIXe CsBaLaHfTaWReOsIrPtAuHgTlPbBiPoAtRn FrRaAcRfDbSgBhHsMt 8 Elements with bad volatility (NOT EXTRACTED) Surface Ionization Method Laser beam Laser Ion source Photo Ionization Method Ionization Method Plasma Ionization Method ION sources Main fission 238U fragments febiad Ion source

LPX200 XeCl Excimer Laser LNL SPES Laboratory Ion Source: surface ionization & laser photo-ionization DOF ux = 0 uy = 0 uz = 0 LINEAR ELASTIC structural calculations LASER excimer LASER at LNL I=500 A The Front end at LNL LASER beam ion source Thermo-mechanical study of ion source (See poster D.SCARPA) Laser laboratory at INFN/ Pavia

The SPES Laser Lab LNL LPX200 Lambda Physik excimer laser Up to 200 mJ per pulse Up to 100 Hz repetition rate Pavia -1 Pump laser Quanta System Nd:YAG nm output -10 Hz rep rate -Up to 300 mJ per pulse - 3 Lambda Physik dye laser -Possibility of intracavity etalon -Possibility of SHG R&D work on Aluminum and Tin (see Daniele Scarpa poster) 1) New Pum Laser Nd:YAG nm 100 W 2) 3x Solid state Ti-Sa tunable laser Actual instrumentation Instrumentation up-grade (new laboratory)

The FEBIAD ionization source Thesi Andrea Baraldo: elettro-therml-structural study of the SPES plasma ionization source neutral atoms electrons Ions V ≈ 100mA Bobine Anode (Mo) Insulator (BeO/Al2O3) Anode support (Mo) Cathode (Ta) Grid (Graphite) Anode Cathode V source - V eletctrod = 60kV

Plasma source development Transfer tube TEMPERATURE MEASUREMENT vs. CURRENT SUPPLIED Thesi Andrea Baraldo: elettro-therml-structural study of the SPES plasma ionization source

Plasma source development Transfer tube TEMPERATURE MEASUREMENT vs. CURRENT SUPPLIED Thesi Andrea Baraldo: elettro-therml-structural study of the SPES plasma ionization source

The SPES target prototype Graphite Window UCx Disk Graphite Dumpers Graphite Box UCx emissivity measurement SEM Characterization UCx target procuction SPES target-ion-source Front End 40 mm (See poster A.ANDRIGHETTO)

Production and Characteriztion of UC x made with Carbon Nano Tubes (MWCNTs) CNT90-UCx SSA = 8 m 2 /g SEMBET and XRDUCx MWCNTs UO 2 +6C  UC 2 +2C+2CO where C is given by MWCNTs Development and characterization at LNL. Production at ISOLDE (2 targets) Production tests One of the two ISOLDE targets

 bulk (g/cm 3 ) depl U (g) ISOLDE Standard- UCx370 ISOLDE UCx-CNTs1.334 Preliminary Results on Release efficiency Comparison released fraction standard ISOLDE UC X at 2000°C and UC-MWCNT at 1800°C 140 Cs: T 1/2 65 sec 142 Cs: T 1/2 1.7 sec 25 Na: T 1/2 59 sec Data Collected and Analyzed by dr T. Storà and ISOLDE group ISOLDE experiment: June 2009

Recent test of SPES UC 2 targets (test performed on March ’10 at HRIBF) Seven UC 2 samples prepared by the SPES Target Group Densities in the range of 4.2 g/cm 3 Used the SPES design for target geometry Heated to 2000° C for about two weeks without any out-gassing or obvious change in structure (samples observed after the on-line test)

SPES Target Preliminary data of HRIBF experiment Experiment March 2010 Ing. S. Corradetti PHD Proton energy = 40MeV ISOL target operated at 2000°C. Ionization and extraction with 1+ Plasma Source. Isotopes measured at the tape system. For expected beam on target should be considered: 200microA proton current and a transport efficiency of 2-5% Evaluated production rate for 1 microA proton current

SPES reaccelereted RIB’s scaled from HRIBF Preliminary data March 2010 experiment

SPES reaccelereted RIB’s scaled from HRIBF

The SPES beam selection

Bending angle 80° in/out 28° Drift 1.62 m Quads. Elett. Leff=40 cm R=30 mm, Vmax<3 kV Beam transport & Spectrometer Wien filter Beam cooler HRMS Charge Breeder ISOL target Beam switching 90 o Deflector Electrostatic deflector for HV ripple compensation

1.3 mm DM= HRMS physics design 3 o order effects analysis D  =4 mrad and DE= ± 1.3 eV included Mass resolution: 1/ o order effects analysis D  =4 mrad and DE= ± 1.3 eV included Mass resolution: 1/40000

ISOL front-end High Voltage platform Mechanical and electrical design. Critical point: operation in highly radioactive area FEM simulation

The SPES Post acceleration system

The PIAVE Superconductive RFQ The PIAVE Superconductive RFQ ECRIS LEBT 3H-B SRFQs QWRs B to ALPI booster TDB Transmission 1. ► 2. 90% 2. ► 3. 68% 3. ► 4. 85% The PIAVE The PIAVE Superconductive RFQ β=0.047 β= RIB Stabl e beam

Superconductive linac based on QW resonators. 2003: Up graded to Veq ~ 40 MV From Pb/Cu cavities to Nb/Cu spattered cavities or bulk Nb cavities The ALPI Sc-Linac The ALPI Sc-Linac

32 ALPI layout Optimum beta βo = βo = βo = 0.11 βo = 0.13 To be funded: 2 additional LowBeta Cryostats (CR1, CR2) a New buncher New magnetic lenses (upgrade from 20 to 30 T/m) Funded upgrade (2009) LowBeta CR3, new couplers Low beta cavities ALPI upgrade for SPES

The ALPI post accelerator Superconductinglinac based on QW Resonators 2003: Up graded to Veq ~ 40 MV - Nb/Cu sputtered cavities or bulk Nb cavities; 2009: 48MV 2010: Low Beta RF upgrade to 5MV/m Energies up to MeV/A for A=130 beams Expected SPES energies Coulomb barrier on Pb After linac upgrade Actual linac Linac upgrade & high energy stripper 30% efficiency

strumentazione

Nuclear structure research Nuclear structure research AGATA demonstrator GASP Reaction dynamics research Reaction dynamics research GARFIELD and 8πLP PRISMA and PISOLO Large acceptance mass spectrometer 4π strip detector Gas target 4π strip detector Gas target EXOTIC CHIMERA (from LNS to SPES) Gamma spectrometer and ancillary det. Available INSTRUMENTATION Large solid angle particle detectors

Nuclear structure research Nuclear structure research AGATA demonstrator GASP Reaction dynamics research Reaction dynamics research - High spin states - Collectivity and shell model - Isospin symmetries - Isospin mixing in N=Z nuclei - Spectroscopy at the dripline - Shell stability and evolution in neutron rich nuclei - Symmetries at the critical point - Rotational damping - High spin states - Collectivity and shell model - Isospin symmetries - Isospin mixing in N=Z nuclei - Spectroscopy at the dripline - Shell stability and evolution in neutron rich nuclei - Symmetries at the critical point - Rotational damping GARFIELD and 8πLP PRISMA and PISOLO Large acceptance mass spectrometer 4π strip detector Gas target 4π strip detector Gas target EXOTIC CHIMERA (from LNS to SPES) -Multinucleon transfer - Nuclear superfluidity (pair transfer) - Elastic and inelastic scattering - Near and sub-barrier fusion -Multinucleon transfer - Nuclear superfluidity (pair transfer) - Elastic and inelastic scattering - Near and sub-barrier fusion - Multifragmentation at low excitation energies - Nuclear level density - Collective modes of excitations - Multifragmentation at low excitation energies - Nuclear level density - Collective modes of excitations - Inverse kinematics - Break up processes - Quasi elastic scattering with light ions produced in secondary reactions - Inverse kinematics - Break up processes - Quasi elastic scattering with light ions produced in secondary reactions Gamma spectrometer and ancillary det. Available INSTRUMENTATION Large solid angle particle detectors

NEW detectors: Spiral2pp - SPES The FAZIA Initiative NEDA and TRACE Neutrons and Light Particles AGATA ancillaries New generation of particle identification detector

Siliconix Neutron detectors Very preliminary tests with Boron and Gadolinium doped samples and PMT allowed to observe a good response to thermal neutrons. Study for solid neutron detectors. Alternative to liquid detectors: improved safety simple handling

Daniele Mengoni TRACE

Evaluated Total cost: 4Meuro (no Lab. Extension) Neutron facility at the SPES Cyclotron DIRECT irradiation facility Moderated neutron spectra Laboratory extension for proton irradiation

Single Event Effects facilities SPES at 5  A integral neutron production at SPES Cyclotron Proton beam= 500  A, Target = W 5mm Energy region (MeV) Sn (n/s) ~ 6∙10 14 s -1  2.5 m (n cm -2 s -1 ) 1 < E < 10 ~ 5∙10 14 s -1 5  < E < 50 ~ 1∙10 14 s -1 1  10 8 NEUTRON spectra at SPES CYCLOTRON Study for a SINGLE EVENT EFFECT facility Acceleration factor 3x10 5microA 70MeV

Study for Pure Lithium target Copper backing has been successfully manufactured. Preliminary power transfer test performed Tests done depositing a thin Indium layer instead of Lithium. Melting point of Indium 157  C. Maximum working temperature of Li target will be 150  C. Test with a TIG soldering system and water cooling Microchannel cooling system

Study for Pure Lithium target Copper backing has been successfully manufactured. Preliminary power transfer test performed Tests done depositing a thin Indium layer instead of Lithium. Melting point of Indium 157  C. Maximum working temperature of Li target will be 150  C. Test with a TIG soldering system and water cooling Measured power transfer: 3.4 kW/cm 2 Not reached the Indium melting point Microchannel cooling system

SPES project UNI_PVUNI_PDUNI_TN DIMDSCDEI DESIGNMATERIALS DIM DSC CERN- ISOLDE GANIL-SPIRAL 2 ORSAY-ALTO TRIUMF- ISACORNL- HRIBF HANDLING CONTROLS The SPES collaborations network KEK- TRIAC Active Collaborations Future Collaborations INFN- Pavia INFN- Milano INFN- LNS INFN- Bologna INFN- Padova UNI_VI DMT SAFETY UNI_PA DIN INFN- LNL ENSAR SPIRAL2pp

Facility preliminary design completion Prototype of ISOL Target and ion source ISOL Targets construction and installation Authorization to operate Building’s Tender & Construction Cyclotron Tender & Construction Cyclotron Installation and commissioning Neutron facililty design Neutron facililty construction Alpi preparation for post acceleration Design of RIB transport & selection (HRMS, Charge Breeder, Beam Cooler) Construction and Installation of RIBs transfer lines and spectrometer Complete commissioning SPES Schedule

Call for Letters of Intent Researchers interested in proposing experiments with the SPES facility at LNL are invited to submit Letters of Intent to the Scientific Committee of SPES. Information on the SPES: deadline for submission is October 1st 2010 The documents can be submitted via tothe Chair of the Scientific Committee AldoCovello The submitted LoI will be presented and discussed in the forthcoming SPES2010 Workshop (LNL- November 15 th -17 th, 2010) The goal is to build scientific collaborations around the SPES facility, defining priorities in the development of exotic beams and instrumentation..

CONCLUSIONS  The SPES project was approved by INFN  The ISOL Target and Ion Source was developed and are under test  The Safety report for cyclotron operation is completed  The bid for the cyclotron proton driver will be concluded in June  The bid for final building design is assigned  Expected ground breaking in 2011  The SPES project was approved by INFN  The ISOL Target and Ion Source was developed and are under test  The Safety report for cyclotron operation is completed  The bid for the cyclotron proton driver will be concluded in June  The bid for final building design is assigned  Expected ground breaking in 2011

Thanks for attention