Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

MICE PM report 1 st September Cost & Schedule updated Revised (few % change of numbers) Based on a Fully Funded assumption in FY 2005/6 Affect of.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Training MICE ! & User support. Where to start? If you feel that you are incompetent - a good starting position? If you don’t know if you are incompetent.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Role of Management and Technical Coordination
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Project manager report paul drumm CM16 October 2006.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
UK status report (funding) Status of UK bid for funding Savings/contributions in kind Gateway process Support from ISIS Conclusions/personal comments.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Report on the Energy Efficiency Ad Hoc Group (EEAHG) IEC TC 100 AGS May 20, 2009 Jean Baronas INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Chris Booth Sheffield 29th March 2006
MICE CM28 Engineering Session Summary (On behalf of Wing)
East Hall under construction
MICE Target Report Video Conference 29/11/07
MICE CM31 Schedule summary
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Presentation transcript:

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003

Progress B&I Beam Line Layout in synchrotron hall Target design R&D Hall Civil Clear Hall & prepare for 2004 shutdown

Progress

Sheffield - Target

Progress

Hall Clearance Crane upgraded lighting maintenance done Hall partly stripped out –disposal of old power supplies (keep for CMS) –preserving magnets … on schedule – expect to complete end of October No problems encountered CMS disturbance minimal – still in place –discussed inevitability of moving (with BB)

RF Power Sources Identified some £900k+ savings on equipment! CERN –2 power amps (I expect CERN to refurbish & test) LBNL –2 power amps (need to be cleaned, modified & tested) This can be done at/by RAL – risk of incurring disposal cost –3 driver amplifiers (need to be cleaned & tested) Los Alamos –2 HV power supplies (loan – ~new) –4 driver amplifiers (working – timescale not known) Total RF cost is 1.8M+ after savings

Beam Line Matching –Extra elements for MICE? –Looking CERN/DESY/TRIUMF/…RAL

of MICE & Management MICE management tree –Collaboration Board – Chair* Executive Board* –technical board* (PD) »Level 2 Level 3 Level 4 –Process of (design & baseline) change control* –Funding Matrix* status –Common Funds proposal* –MICE constitution* *For review at Collaboration meeting ISIS/RAL Technical Contacts agreed –ISIS & ED resource group leaders Formal Project Management Methodology RAL Technical Liaison RAL Technical Advisory Committee

MICE WBS (XX) = Management - Not necessarily a financial responsibility