RAL Particle Physics Dept. Site Report. Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental.

Slides:



Advertisements
Similar presentations
24th May 2004Hepix Edinburgh - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
Advertisements

Monday 24 May 2004DAPNIA/Pierre-Francois Honore1 DAPNIA site report.
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Liverpool HEP – Site Report May 2007 John Bland, Robert Fay.
Liverpool HEP - Site Report June 2008 Robert Fay, John Bland.
Birmingham site report Lawrie Lowe HEP System Managers Meeting, RAL,1 st July 2004.
UCL HEP Computing Status HEPSYSMAN, RAL,
24-Apr-03UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS SECURITY SOFTWARE MAINTENANCE BACKUP.
A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
Physics Network Integration Chris Hunter. Physics network team Chris Hunter : Network Manager David Newton : Network Support Technician Room DWB 663 Phone.
ITT NETWORK SOLUTIONS. Quick Network Facts Constant 100 Mbps operation for users Infrastructure ready for 1000 Mbps operation to the user Cisco routing.
Establishing an OU Hierarchy for Managing and Securing Clients Base design on business and IT needs Split hierarchy Separate user and computer OUs Simplifies.
9th May 2006HEPSYSMAN RAL - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
D2 – ICT Don’t worry about IT. Services offered  Desktop support 2000, XP, Vista, Windows 7 \ Windows 8.1  Windows Server and Windows SBS 2000\2003\2008.
Chris Brew RAL PPD Site Report Chris Brew SciTech/PPD.
Birmingham site report Lawrie Lowe: System Manager Yves Coppens: SouthGrid support HEP System Managers’ Meeting, RAL, May 2007.
Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Group Presentation Design and Implementation of a company- wide networking & communication technologies strategy 9 th December 2003 Prepared By: …………
1 Managed IT Systems Presented by Dean Berreth Managed IT Systems, Manager.
1 SLAC Windows Migration Bob Cowles Presented for the SLAC Windows Migration Project HEPNT, Fermilab October 24, 2002.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 1: Introduction to Windows Server 2003.
Technical Support Windows Server Support Operations Backup & Recovery Services.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Edinburgh Site Report 1 July 2004 Steve Thorn Particle Physics Experiments Group.
FNAL Configuration Management Jack Schmidt Cyber Security Workshop May th 2006.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
UCL Site Report Ben Waugh HepSysMan, 22 May 2007.
Laptops and Computer Security Gareth Smith. Current Situation in PPD Standardised on Dells (D400, D600) Total bought to date by department: ~50. Loan.
PPD/CG Christmas Lectures by Kevin Dunford. Windows development Servers HEPWIN2003A, B, C, D, E, F, G, H and I All running Windows server Service.
PPD Computing “Business Continuity” Windows and Mac Kevin Dunford May 17 th 2012.
Computing Resources, An Overview Vinod Gupta Computing Committee Meeting
27/04/05Sabah Salih Particle Physics Group The School of Physics and Astronomy The University of Manchester
IMPLEMENTING F-SECURE POLICY MANAGER. Page 2 Agenda Main topics Pre-deployment phase Is the implementation possible? Implementation scenarios and examples.
Microsoft Active Directory(AD) A presentation by Robert, Jasmine, Val and Scott IMT546 December 11, 2004.
RAL PPD Site Update and other odds and ends Chris Brew.
The SLAC Cluster Chuck Boeheim Assistant Director, SLAC Computing Services.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
20th October 2003Hepix Vancouver - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
Cloning NT Using DriveImage Chris Brew Particle Physics Department Rutherford Appleton Laboratory rl.ac.uk.
PPD Computing “Business Continuity” David Kelsey 3 May 2012.
Site Report May 2006 RHUL Simon George Sukhbir Johal Royal Holloway, University of London, Egham, Surrey TW20 0EX HEP SYSMAN May 2006.
Kevin Dunford – Windows Support & Development What do I do.. Support, configuration, and development of - Windows servers, desktops, Laptops, printers,
HEPiX/HEPNT TRIUMF,Vancouver 1 October 18, 2003 NIKHEF Site Report Paul Kuipers
Introduction to U.S. ATLAS Facilities Rich Baker Brookhaven National Lab.
Active Directory Harikrishnan V G 18 March Presentation titlePage 2 Agenda ► Introduction – Active Directory ► Directory Service ► Benefits of Active.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
11th Oct 2005Hepix SLAC - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager and South Grid Technical Co-ordinator.
RAL PPD Computing A tier 2, a tier 3 and a load of other stuff Rob Harper, June 2011.
23 April 2002HEP SYSMAN meeting1 Cambridge HEP Group - site report April 2002 John Hill.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
Current Deployment (NT4) n Minimal central infrastructure u DHCP/DNS service (non NT) u WINS service (but not supported) u Software image repository u.
Mobile Computing for Mac Users By Alan Doo PPD Christmas Lectures 2009.
1st July 2004HEPSYSMAN RAL - Oxford Site Report1 Oxford University Particle Physics Site Report Pete Gronbech Systems Manager.
HEPix April 2006 NIKHEF site report What’s new at NIKHEF’s infrastructure and Ramping up the LCG tier-1 Wim Heubers / NIKHEF (+SARA)
Brunel University, School of Engineering and Design, Uxbridge, UB8 3PH, UK Henry Nebrensky (not a systems manager) SIRE Group.
PPD/CG Christmas Lectures Windows – Wrap Up Gareth Smith PPD Xmas Lectures 17 th December 2007.
Gareth Smith RAL PPD RAL PPD Site Report. Gareth Smith RAL PPD RAL Particle Physics Department Overview About 90 staff (plus ~25 visitors) Desktops mainly.
WNAG Report to UCIST April 2004 Presented by Bruce Campbell Engineering Computing.
Macromolecular Crystallography Workshop 2004 Recent developments regarding our Computer Environment, Remote Access and Backup Options.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
System Migration Guy “Randy” Fleegman
See: under Projects and Planning
Managed IT Systems, Manager
Glasgow Site Report (Group Computing)
Objectives Differentiate between the different editions of Windows Server 2003 Explain Windows Server 2003 network models and server roles Identify concepts.
HEPSYSMAN Summer th May 2019 Chris Brew Ian Loader
Division of Engineering Computing Services
Presentation transcript:

RAL Particle Physics Dept. Site Report

Gareth Smith RAL PPD About 2 staff mainly on windows and general infrastructure About 1.5 staff on departmental Linux and Tier 2. Part of one manager Year in Industry (gap year) student summer and again summer Who are we….

Gareth Smith RAL PPD Central infrastructure upgraded to Windows 2003 / Active Directory Keeping existing Windows domain structure. I.e. many separate forests. Exchange upgraded to Exchange 2003 (from 5.5) Developments in CCLRC / RAL

Gareth Smith RAL PPD Approx 130 desktop systems running Windows XP (Sp1) with Office XP Use UpdateExpert to rollout patches Site-wide Sophos anti-virus license Approx 10 desktops running Linux A few MACs Significant numbers of Laptops (around 40). Mostly Windows XP. In PPD domain for central Sophos updates. Use central SUS server for updates Some Linux, some dual-boot PPD Desktops / Laptops

Gareth Smith RAL PPD Windows 2 file servers. Approx. 500GByte available Backup to tape auto-loader (Scalar24) with SDLT. Three web servers – plan to consolidate Citrix terminal server for special applications. Linux Departmental servers RH7.3. (Update to SL over summer) Web server RH Enterprise 3 & Apache CVS Server (SL) Approx 10 desktops running Linux Use of samba to access Linux file servers from Windows. PPD Servers

Gareth Smith RAL PPD Currently 42 dual nodes mix of 2.4 and 2.8GHz Xeons. 0.8TByte disk. LCG SL In two racks Future: Additional 6TB to bring into use (DCache) Additional rack with disk / tape. SL4 ….. Tier 2

Gareth Smith RAL PPD Networked B&W and Colour printers Includes HP plotter (DesignJet 800PS) Printing etc.

Gareth Smith RAL PPD Increase in user filespace for Windows and Linux Network appliance ? Power (and cooling) available in computer room is limited. Ongoing patching etc. Growing numbers of Laptops – not so easy to manage Also visitors arriving with laptops. Future & Issues