FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.

Slides:



Advertisements
Similar presentations
ExoMars UV Laser diode thermal vacuum test Alex Rousseau.
Advertisements

TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
MUPUS Team Meeting, Graz, Oct-2013 A. Schaffer, G. Kargl, N. Kömle Space Research Institute Austrian Academy of Sciences Calibration strategy for.
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
Assembly of Conductivity Flow Loop EAS 199B living with the lab (in preparation for calibrating conductivity sensor)
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Heat load study of cryomodule in STF
Verigy V93000 Service Training
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Thermal measurements in Glasgow Richard Bates, Isaac Bonad, Craig Buttar.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Melting Probe Progress Meeting: Summary of the experiments done and their influence on the new design E. Kaufmann, G. Kargl, N. Kömle Space.
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
Como, October 15-19, 2001H.R. Schmidt, GSI Darmstadt 1 The Time Projection Chamber for the CERN- LHC Heavy-Ion Experiment ALICE ALICE Detector overview.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Thermoelectric Cooling Team Members: Mark Campbell Peter Giles Andrew Smith Tom Strapps Nickolay Suther Team Supervisor: Dr. Prabir Basu Client: Greenfield.
HVAC Wiring diagram 5 channel output (5A relay) Speed: High/Medium/Low Mode: Cooling / Heating /Dehumidifier HVAC is a module specially for Air Conditioner.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
S3 INNOVATION ELECTRONICS. LESSON TITLE: ELECTRONICS Learning Intention: To understand when to use different types of logic gates Activity: Building own.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
AND Gate Inputs Output Input A (Switch) Input B (Switch) Output Y (Lamp) 0 (Open) 0 (OFF) A B Lamp.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Summer Student 2003Ferro Livia1. Summer Student 2003Ferro Livia2 Contents Experimental setup Thermal behaviour and cooling performance of the TOB structures.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Installation of the T600 at Fermilab
E = m Lf E = m c θ E = m Lv.
FLoor Heating Controller
FLoor Heating Controller
Bridge Heating.
Barrel TRT Module Cooling
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
ECE Engineering Design Thermal Considerations
DT Infrastructure: LV, HV, Gas
FP420 Detector Cooling Thermal Considerations
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
RPC Detector Control System
Tests on a dummy facet of PIX upgrade using CO2 cooling
TPC Detector Control System
RPC Detector Control System
SALTRO16 activities in Lund
Single Detector Design
Complete chart for 18 minutes
Presentation transcript:

FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI

TPC meeting2 IROC in Thermal Box + 4 FEC (3.1) Lauda System PUMP IROC Lauda System T8 T9 T10 T12 T13 T11 T7T6T5 Inside: Sensors on pad plane T8 FEC T14 T15 Separate cool. circuits for chamber + FEC Sensors on FEC cool. plates ~10cm

TPC meeting3 FEC IN Thermal Box T=21 ˚C Chamber cool. T=21˚C Cooling In Temp sensors PS Cooling Out

TPC meeting4 Input Cooling circuit Output Cooling circuit Chamber Cooling circuit 4 FEC (3.1) ~10.5 W/card (3.2: ~6.9 W/card) T11 T9T10 T12 IROC

TPC meeting5 ELMB PT1000 two wire sensors connected Can Bus port

TPC meeting6 Cooling plate Inner screws T14

TPC meeting7 Single card w/o inner screws LV OFF LV ON ΔT ~5.5 ˚C ΔT cooling plates

TPC meeting8 Card w/o inner screws in set-up LV ON LV OFF ΔT ~4 ˚C ΔT cooling plates

TPC meeting9 Single card with all screws All screws in ΔT ~1 ˚C ΔT cooling plates

TPC meeting10 Chamber cooling ~ 50 minutes Cc off Cooling circuit on chamber Pad

TPC meeting11 Chamber cooling All circuits 21˚C Chamber 21 -> 19.5 ˚C ΔT ~1.5 ˚C chamber cooling chamber pads

TPC meeting12 Chamber cooling All circuits 21˚C Gradients on the pad plane ΔT ~0.08 ˚C pad under FEC pad

TPC meeting13 ΔT ~0.18˚C Δt ~ 30 min LV OFF LV ON Heat transfer to pad plane Pad under FEC

TPC meeting14 Heat transfer with cable Chamber 21˚C FEE cooling 19˚C Thermal box 21˚C Heat transfer: ~0.19˚C pad under FEC pad LV ON | LV OFF

TPC meeting15 Heat transfer without cable Chamber 21˚C FEE cooling 19˚C Thermal box 21˚C Heat transfer: ~0.15˚C pad under FEC pad LV ON | LV OFF

TPC meeting16 Compensation ˚C LV OFF LV ON LV OFF FEC cool:T=19 ˚C T=24 ˚C T=19 ˚C T=24 ˚C

TPC meeting17 Temperature cooling FEE 19->24 ˚C ΔT ~ 0.14˚C pad under FEC pad

TPC meeting18 Compensate: Switching ON ΔT ~ 0.05˚C pad under FEC pad

TPC meeting19 Compensate: Switching OFF pad under FEC pad FEC cool. temperature (scaled)

TPC meeting20 Compensate: Switching OFF ΔT ~ 0.06˚C pad under FEC pad

TPC meeting21 Compensation (16-21˚C) LV OFF LV ON LV OFF FEC cool: T=21˚C T=16˚C T=21 ˚C

TPC meeting22 Compensation (16-21˚C) ΔT ~ 0.05˚Cpad under FEC pad LV ON LV OFF

TPC meeting23 Summary + Conclusion Setup with 4 FEC (Ver. 3.1) 10.5 W per Card Heat transfer between both sides of cooling plates thru screws: Single sided cooling? Chamber circuit for stabilization not compensation –Time constant Δt ~ 50 min Heat transfer FEC -> pads –Time constant Δt ~ 30 min –~0.19 ˚C with cable –~0.14 ˚C without cable Compensation with Cooling temperature per sector –Test setup: Compensation on pads with ΔT ~ 0.05 ˚C