1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA2008-02142.

Slides:



Advertisements
Similar presentations
CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
Advertisements

Enrique Calvo Alamillo Madrid 1 March Index: 1.Proposal for a DHCAL m3 module. 2.Numerical simulations for a m3 module. 3.Extrapolation of the m3.
Goals : 1- To conceive and build a self-supporting mechanical structure. 2- The concept can be extended to ILD and SiD 3- Keep cost as low as possible.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo/Mary Cruz Fouz Lyon
Mechanical Status of ECAL Marc Anduze – 30/10/06.
General idea of a couple of check rod system and adjustments
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
MKT May 2012 C850: Fast sliding gate operator. MKT May 2012 Summary  Why a fast slider operator?  USPs  Applications  Details  Technical specifications.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
Imad Laktineh (in behalf of Enrique Calvo Alamillo) Arlington 11 March 2010.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Carbon-aluminum composite structures for the TPC, , Pierre Manil, 1 Detector structure: Carbon-aluminum composite structures for the TPC Pierre.
Mechanical Designs of The Central Detector Jinyu Fu
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
The HCAL barrel absorber structure
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Design of a Precision Robot Wrist Interface
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Concept Design for LBNF Far detector (LAr single phase)
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
19-Sept-2012] «BE-RF-PM» TEST MODULES in the LAB DB girders (epucret) for T1 & T4: Optimization of the V-shaped supports Nick Gazis, Dmitry Gudkov, Vadim.
Epument Girder simulation and Module Showroom upgrade For CLIC meeting 2015 Petri Tikka, Helsinki Institute of Physics focusing on exploring the possibilities.
Platzhalter Bild Design and Performance of a Fully Automatic Robot System for Mass Determination Thomas Fehling, NCSLI–Conference, Orlando/Florida, August.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Baby-MIND Modules & Services
Update on Pavia MM mechanical prototype
Test Beam Request for the Semi-Digital Hadronic Calorimeter
SuperB IFR mechanics of IFR prototype – by C. Fanin
Enrique Calvo Alamillo DAEGU
HCAL preliminary analysis and results
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
IR Detector - Test cryostat : Machining
LumiCal mechanical design, integration with LDC and laser alignment
SDHCAL Integration Moi j’aime bien SAFARI
FRESCA2 Update on the dipole design and new calculations
IFR detector mechanics
By Arsalan Jamialahmadi
High Precision Magnet Production for NSLSII at IHEP
Presentation transcript:

1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA

08/10/2010 OUTLINE  The design  Quality Control tests  Assembly tests and tooling  Schedule and costs M.C Fouz2

General requirements absorber plates (stainless steel) interleaved with the detector cassettes. 20mm passive absorber material, including the cassettes. The mechanic structure should allow to accommodate GRPC as well as MICROMEGAS (It will be instrumented first with GRPC but it was planed to built some MICROMEGAS that must be tested on the same mechanic structure) It must allow the insertion and further extraction of the cassettes The prototype not only must prove the technology and serve us to get experience on the operation and performance but also on integration and technical issues of building an ILC-like module. 08/10/2010M.C Fouz3

Towards a Technological Prototype Barrel Module 08/10/2010M.C Fouz4 The aim is to build a realistic prototype as close as possible to the solution proposed for the ILD concept.  Validate the technological solution Self-supporting mechanics Minimize dead zone One-side services Module ILD - SDHCAL LOI design

Towards a Technological Prototype Absorbers will be assembled together using lateral spacers fixed to the absorbers through bolts. Technological prototype : 40 detector plans of 1m 2 : 20mm stainless steel (absorber + cassette support) 6mm GRPC 08/10/2010M.C Fouz5 Cassettes. Electronic side Absorber plate Spacers The dead spaces have been minimized as much as possible taken into account the mechanical tolerances (lateral dimensions and planarity) of absorbers and cassettes to ensure a safe insertion of the cassette. Design independent of the detector technology to be used (RPC and MICROMEGAS)

Absorber Mechanic structure – Details Spacers Absorber Bolts 08/10/2010M.C Fouz6 Absorber Plates: 1011 x 1054 mm 2 lateral dimensions 15 ± 0.05 mm thick Surface Planarity < 250  m Spacers: 13 mm thick Material: Stainless steel 304L (permeability, as measured, 1.5  it allows used it in B=4T) 2x11 bolts/plane M8

08/10/2010 Simulations Detailed study has been made to evaluate the robustness of this structure in different positions. It is important to evaluate the deformations and the stress that the structure can suffer when moving and rotating, the deformations will be also transferred to the GRPC detector ANSYS numerical simulations performed on the deformation and stress Max. deformations don´t exceed 150 microns. The punctual max. stress it is only 74 Mpa, well away from the elastic limit of the material The max. reactions on the M8 bolts are: Fx= +/ N, Fy= N, Fz= +/ N M8 bolt have the elastic limits, function of the material, between about N to N. This is the situation more adverse for the M8 bolts. M.C Fouz7

Plates & Quality Control To reduce the gaps it is needed a good planarity of the absorbed plates. The tolerances of the standard market are higher (several mm) than our needs(hundred of microns), the plates need to be further machined to achieve the precision we are interested in It is not easy to achieve the precision. Tests done at different companies to find a supplier that guarantees our needs. Quality control during the mass production of the plates will include verification by the company, both of the thickness and the planarity, and then a crosscheck will be performed at CIEMAT by using a laser interferometer system (Precision  m for the planarity measurement).. 08/10/2010M.C Fouz8

Plates - Planarity measurement procedure 08/10/2010M.C Fouz9 Support pins 3 pins support the plate In order to disentangle the planarity measurement from the table shape Pin

Plates - Planarity measurement results 08/10/2010M.C Fouz10 a) Theoretical deformations computed for the plate supported by the three pins. b) Laser measurements of the surface of a real plate c) Surface plate planarity computed as b) – a) a)b) c) Pin location Pin location Pin location Planarity values

Plates - Planarity measurement errors 08/10/2010M.C Fouz11 In order to check the accuracy and stability of the measurements the same plates have been measured several times in the same conditions and also supported by the pins in different positions. The differences between the different measurements are inside the  m error provided by the laser interferometer system. Differences between two measurements of the surface plate performed with support pins in different positions with respect to the plate. For both surfaces of the plates. Surface ASurface B

Assembly tests & tooling Suction pad A specific tool for handling the plates has been designed and built Security System Special table to support the 6ton prototype 4 absorber plates (bad quality) assembled to test the procedure The mechanical structure should be finished by march /10/2010M.C Fouz12

Rotation tool 08/10/2010M.C Fouz13 The 1m3 prototype is a heavy structure (~8500 Kg) that we need to move and eventually rotate (for cosmic tests at the lab for example). Tool under design now

Schedule & Costs 08/10/2010M.C Fouz14 Timing: The most time consuming is the verification of the plate planarity  Manipulation of the plate  Regulation of laser for each measured line ~2.5 – 3 hours/plate At least 30 plates must arrive to CIEMAT before the end of the year The structure should be finalized by March 2011 Cost: ~ 3000 euros /plate ~1000 euros for material the rest is for machining Due to the relation between the final dimensions of the plates and the standard dimensions provided by the market it has some extra cost The cost of the other components and tooling are marginal with respect to the plates It is financed by: Spanish HEP National Program by the project FPA

08/10/2010M.C Fouz15 BACK UP

Towards the 1m 3 prototype: GRPC Mechanic structure - Cassette DIF Thickness adjusted to be the same as Micromegas cassettes Cassette to include the GRPC detector and associated electronics Horizontal Vertical Max: 0.5mm Max 5.9 x mm Deformation under its own weight as a function of storage orientation Successful insertion from above aperture 12.5 mm Cassette insertion test 08/10/2010M.C Fouz16

Towards the 1m 3 prototype: Absorber Mechanic structure – First ideas g rav ity DIF Each detector module it is supported on the absorber by 6 wheels fixed on the cassette support of the detector. Details of the guiding system. The rails are fixed on the absorber. Absorber Attachment device Are fixed on the top and bottom spacers. cassette DIF This design is not suitable for a “final” detector: - Too much dead spaces - Expensive 08/10/2010M.C Fouz17