Quality assurance related to system integration of the VELO detector. Jan Buytaert, CERN On behalf of the VELO collaboration. November 4, 2011 Workshop.

Slides:



Advertisements
Similar presentations
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
Martin van Beuzekom, STD6 14 th September Outline: Introduction to LHCb and VErtex LOcator (VELO) Status of VELO Beamtests Upgrades Summary LHCb.
The LHCb VErtex LOcator Olaf Behrendt on behalf of the VELO group Novosibirsk,
Chris Parkes First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Act 3: Initial Performance for LHCb VELO groupVienna Conference.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
LHCb VErtex LOcator & Displaced Vertex Trigger
M. Bianco On behalf of the ATLAS Collaboration
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
LHCb VErtex LOcator (VELO) Module Production and Performance Anthony Affolder University of Liverpool for the LHCb VELO group RD07 Conference June 27,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
LHCb Vertex Detector and Beetle Chip
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CLAS12 Drift Chamber Prototyping
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
A novel approach to detector calibration parameter determination and detector monitoring Eduardo Rodrigues On behalf of the LHCb VELO Group CHEP 2010,
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
SVD Electronics Constraints
Developing Radiation Hard Silicon for the Vertex Locator
Detector building Notes of our discussion
T. Bowcock University of Liverpool
Hybrid Pixel R&D and Interconnect Technologies
Simulated vertex precision
FNAL Production Experience
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
LHCb VErtex LOcator ENGINEERING DEPARTMENT
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Niels Tuning (Outer Tracker Group LHCb)
Setup for testing LHCb Inner Tracker Modules
The LHCb VErtex LOcator
The LHCb Front-end Electronics System Status and Future Development
First results from the LHCb Vertex Locator
Presentation transcript:

Quality assurance related to system integration of the VELO detector. Jan Buytaert, CERN On behalf of the VELO collaboration. November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 1

Outline Quick overview of the VELO detector. QA during module production, burn-in and installation. Further QA during the later stages of system integration. Summary November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 2

VELO Module November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 3 double-sided symmetric build to balance stresses due to “bi-metallic” effects. N-on-n sensors (300um). Thermal pyrolitic graphite (400um) analogue read-out asic’s : 2 x 16 Beetle chips (~18 Watt) Cooling: 2-phase CO 2 [silicon -7° C] 3 layer kapton cable for signals and power. carbon fibre paddle Al cooling block Carbon fibre (250 um)  -sensor R-side circuit  -side circuit R-sensor TPG core Cable clamps Kapton cable Carbon fibre base Hybrid

One VELO detector half November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 4 Grounding straps Carbon fibre constraint frame 1 metre stainless steel base plate 21 modules 2 “Pile-up” modules

Detector vacuum box. November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 5 … insertion of one half into detector vacuum box Thin (300 um) Alu shaped foil separates detector from primary LHC beam vacuum. Detector box pressure < mbar

Signal electronics. November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 6 Digitizing board (Tell1) : - 64 channels 10 bit 40MHz - signal processing FPGAs [cross- talk, common mode, pedestal subtraction & clustering] 60 m cables: Analogue signal transmission Repeater boards: - Pre-emphasis circuit for cable transmission. - Rad-hard power regulators

November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 7 Quality assurance during module production, burn-in and installation.

Module production, burn-in & installation November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 8 Module Liverpool Transport to CERN Module “Burn-in” (U.Glasgow) Installation on base plate Completed VELO in 10 month Mechanics 1 module rejected : suspicious evolution of sensor leakage current Production yields: - 63% of hybrids (flatness) - 87% of sensors - 0.6% average bad channels In rugged transport box under N2 atmosphere. As hand luggage by plane. 1 module rejected : Insufficient cooling performance. Each module was subject to : 6 Visual Inspections, 6 Metrologies, 7 Electrical Tests, 4 Vacuum Tests 3 cooling Tests 2 thermal cycling test man-hours per module But we had a long prototyping period before !

QA during production. Extensive QA was done at component level during production : sensor, pitch adapter, substrates, circuits, bonding, hybrids November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 9 Detailed reports in : LHCb VELO module production and performance NIMA 596 (2008)25-28) and NIM A 583 (2007) Presentation RD07,firenze,2007 by A. Affolder.

QA ‘soft’ production Provided up-to-date production status of all modules. Very useful given tight production schedule and complex production flow... Gave easy access to test results of every module, e.g. : Has some built-in functionality, e.g. validation of test results and release to next production step. In-house developed. Production database : List of production and test tasks (34) List of people (17) Competency matrix Allowed efficient planning of a complex production and ensure competence redundancy. = primary executor = backup executor = training executor Competency matrix : November 4, Workshop on Quality issues in current and future silicon detectors.

QA during module burn-in. November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 11 Detailed visual inspection under microscope (3hours) Thermal cycling 4 x [-22C/+28C] (3h) Long (24h) power up under vacuum Monitoring of leakage current and strip noise. Thermal imaging IR camera. Connector damage caused by cable extraction tool HV return bond wires crushed by production jig Main activities Major visual findings Documented in “LHCb VELO module characterisation and long term quality assurance tests” NIM A 611(2009) Pitch adapter problems 1 module was rejected due to suspicious leakage current evolution. Burn in system

Further system QA The aim is to assure that all components perform to expectation when integrated in the system... Major full system test in SPS beam test. Study of high voltage breakdown in vacuum. Some failures have appeared at system level Instability of electronic amplifiers Connector reliability problem Unexpected behaviour of the front-end asic. Problem of mechanical clearance of sensor to RF foil November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 12

Putting all pieces together. 2 test beams in SPS with the aim of integrating :  Multiple modules and final mechanics.  Signal chain : repeater electronics/long cables/TELL1.  Final LHCb DAQ HW and event building SW.  Final LHCb Timing and Fast control (“ODIN”)  Final low and high voltage systems.(found bug on interlock input of CAEN LV !)  Under vacuum and CO2 cooling.  PVSS based configuration software.  elog... ‘Last check’ before installation on LHC. Large effort, but it proved there was no showstopper towards the final system ! November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 13

QA on software... This test also produced the first real data to feed into software :  Alignment  Pattern recognition & tracking  Vertex finding It exposed many bugs and was key to tune all the software November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 14 Small Pb targets. Reconstructed.

Study of HV breakdown in vacuum The expected dependence on pressure is described by Paschen’s curve : It was measured on a complete module. The study was done in air. Measured minimum breakdown voltage = 370V. The breakdown was likely not on the sensor (looking at strip noise map.) Fully described in LHCb note , November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 15 B.p.d (C+ln(p.d)) V breakdown = B = 365 V/cm/Torr for air P = pressure (Torr) D = distance (cm) C = 1.18 for air Theoretical curves for parallel plate with separation distance of 0.1mm(green), 1mm(blue), 10mm red. measured Allowed Operational region

Electrical Oscillations… The amplifiers on the repeater boards exhibited unstable behaviour under certain conditions when inserted in their crates. It was caused by a feedback through a parasitic path (metallic frame and standoff feet). It was solved by modifying the mechanics (isolated standoffs) the grounding scheme (additional interconnections). November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 16 standoffs isolated additional interconnection points at repeaters

The usual culprits : connectors Use of a connector without locking mechanism for the interconnection between the ‘short’ and ‘long’ kapton cables. The retention force is large, but sometime not sufficient to resist the force from cable torsion. It has caused partial disconnection in a pile-up detector module (cables with higher torsion). The Velo detector is not affected. Careful last visual inspection... November 4, Workshop on Quality issues in current and future silicon detectors. Start of lift-off

strips ADC Readout 128 strips = 1beetle A Beetle weakness. Very large charge deposits in multiple channels cause large pedestal shift in all 128 channels of the ASIC This was accidentally observed in test beam data. (Rare event). The beetle was specified and tested for large charge deposits in single channel only. At LHC, these events are 0.1% of the data and can be corrected for by signal processing in FPGA. This was not detected despite ‘good’ specification and QA consecutive events (green, red, blue). Red event contains large charge deposit. Large negative pedestal shift Very Large charge deposit November 4, 2011 Workshop on Quality issues in current and future silicon detectors.

November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 19 Achieving Sensor-foil clearance... By design in general, 1mm clearance Achieved clearance depends on mechanical precision and stability of the modules, the base plate and the vacuum box foil. Everything was tried to stay within the required tolerances.... Alu foil of vacuum box

3D precision surveys November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 20  Modules:  very accurate construction in x and y (< 60um),  less in z, flatness ~200um  affected by kapton cable attachment  Expansion with cooling  Module base:  combination of slots and dowel pins define position of modules in y and z  flatness of base defines x of modules  Deformation when installed  RF foil:  x and z vary over foil length  depth of slots (x) critical parameter  can flex during venting 0.8 mm 0.1 mm 0.45 mm Total = 1.35 mm !! 0.35mm too much... Obtained maximal excursions in z

2. Constraint system Finally decided to add a constraint system to hold hybrids at proper z-location along beam. Penalty of 0.6% on material budget... In situ verification with a special designed measuring device with dimensions that are 0.5 mm larger than those for a module. A micro-switch beeps if the foil is touched. Imaged with secondary interaction vertices November 4, Workshop on Quality issues in current and future silicon detectors. Precision grooves

Summary We had a very intense period (12 month) of production and installation... following a long and careful prototyping phase. Because of the modest production volume, we could afford extreme care and our QA succeeded in eliminating some few non conforming modules. There will ‘unavoidably’ be some features that escape through the maze of QA and show up during later integration. Luckily these were minor or correctable in our case. The VELO detector operates fully to the ‘expected quality’ regarding performance, stability and reliability... which is the whole purpose of QA ! November 4, 2011 Workshop on Quality issues in current and future silicon detectors. 22