Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations www.europeanspallationsource.se 5 November 2014 Dave McGinnis.

Slides:



Advertisements
Similar presentations
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Advertisements

Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Development and Quality Plans
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Lali Tchelidze Safety work package leader
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Target Project Progress and Plans Eric Pitcher TAC-10 November 5, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Introducing Project Management Update December 2011.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Introdcution to Workpackage/Activity Reflection D. Schulte.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Installation plans for RFQ and Superconducting linac Dave McGinnis Chief Engineer Eugene Tanke Systems Engineer March 20,
PBI task force intermediate report Stephen Molloy.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Flooding Walkdown Guidance
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Licensing update ESHAC #9, October 2018
SPOKE Cavities frequency preparation plan and RF control procedures
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Bunker Internal Review Welcome & Charge
Testing Coordination at ESS
Elettra – Sincrotrone Trieste S.C.p.A.
Licensing update TAC 18 October 2018
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
High Level Readiness Reviews
Test Beamline System Requirements and Charge to PDR Committee
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Accelerator Installation Schedule
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Presentation transcript:

Response to ESS Accelerator Technical Advisory Committee April 2014 Recommendations 5 November 2014 Dave McGinnis

General 1.1.Revise planning as soon as situation of IKCs gets better defined – Update on In-Kind planning to be presented in Accelerator Progress and Plans presented by Mats Lindroos at plenary section of the 10th Technical Advisory Committee meeting. 1.2.Allocate sufficient time and resources in schedule for individual system tests (= commissioning without beam) – In Progress. Marc Munoz of the AD-Beam Physics group held a Workshop on Beam Commissioning April 8-9, A draft commissioning plan has been prepared. The final version is in process. The draft is available on request. In addition, Eugene Tanke (AD/ System Engineer) is revising the ACCSYS installation plan. The draft plan is due by the end of Calendar The final version will be ready for the 2015 ESS Annual Review. 1.3.Allocate sufficient time and resources in schedule for commissioning with beam. – See Recommendation Consider early access to tunnel front-end for staged installation & commissioning – Because the target date of neutrons by the end of 2019 is extremely aggressive, it is very unlikely that there will be enough time for a staged installation and commissioning plan. – See Recommendation 1.2 2

General 1.5.Consider possibility of practical training of newly recruited technical staff at existing experimental facilities in partner institutes. – This is a good concept in theory but difficult to implement in practice. The aggressive schedule along with the minimal staff size make it very difficult for the staff to allocate time for training at other laboratories and meet schedule milestones at the same time. Another approach would be to hire experienced staff from other laboratories. Because of limitations in the local labor market, this approach has been problematic. 1.6.Strive to secure IKCs identified as likely, and estimate from the results the likelihood of achieving full 75% target; revise ACCSYS IKC plans accordingly – See Recommendation Plan combined& intertwined operation/construction activities in in terms of schedule and resources – Agreed, this should be done. Current focus has been developing plan for construction. 3

General 1.8.Report qualitatively and quantitatively on progress of the different tasks – ACCSYS follows a well-defined project management plan (available on request). This plan requires each work package to report monthly on schedule, cost, technical milestones, and issues and risks (available on request). These reports are collated into an overall monthly project report that is submitted to ESS management (available on request). In addition each work package is audited at least annually by ACCSYS management. These reports of these audits are also available on request. Appendix 1 shows the ACCSYS milestones to be met in the next 12 months and the EVM curve for Provide a presentation on availability answering the questions raised by the Annual Review, on the next TAC agenda – The first step in this process is to have a facility wide agreed upon definition for reliability and availability. Because of the different needs of the users, this task has been difficult. Enric Bargalló will present at the Fall 2014 ATAC meeting a definition of reliability and availability proposed by the Accelerator Division that is currently under review by ESS management. However, even with the new proposed definitions, it is problematic to define specific and verifiable reliability and availability requirements for accelerator subsystems and hence, will not be included in ACCSYS Level 3 and below requirements. 4

General 1.10.Aggressively follow prototype activities, esp. with spoke and medium beta cryomodule development and associated RF sources – Agreed. The spoke and medium beta are pre-series production models that are on the critical path for beam in There will be a presentation on the spoke cryomodule status and another on the spoke RF power amplifier at the Fall 2014 ATAC meeting Pursue early tunnel occupancy for the front end to start staged commissioning in Lund – See Recommendation 1.4 5

Beam Shielding 2.1.Use the error analysis framework as a basis for determining instrumentation needs, correctors, and other equipment related requirements. It may be possible to relax certain constraints – The current tolerances are set assuming functionality of the beam diagnostics that could be used with a full power beam (BPMs are the only ones). The floor has been considered to have reached a reasonably stable stage and have not been considered. Field flatness in the SC cavities are not yet included in the error simulations, The process had though started to formulate the requirements for fields. The higher order components of the magnets was not part of the early error studies, the process is started recently. 2.2.Consider collimation options as an insurance against unexpected beam loss – Unexpected beam loss in the form of component failure causes losses that are very localized, to prevent these types of losses using a collimator system; one collimator should be added at each quadrupole doublet in between cryomodules which would be impractical. A presentation on the use of collimators in the ESS linac for halo reduction and beam loss will be presented at the Fall 2014 TAC 6

Beam Shielding 2.3.Ensure that the governing / licensing body endorses the assumed abnormal event basis used here. – Informal discussions between ESS and The Swedish Radiation Safety Authority (SSM - Strålsäkerhetsmyndigheten) have taken place. The SSM has given ESS a requirements document for achieving final licencing. ESS is preparing a response. There has not been a formal agreement on the accident or abnormal event criteria. Since the project has begun civil construction of the tunnel, this represents a project risk. 2.4.Check that localized hot spots > 1 W/m do not cause a problem at the site boundary, and consider mitigation if this is an issue (e.g. local shielding at the hot spots in the tunnel) – This work is on-going. Current state of the shielding studies can be found in: Summary of Shielding and Activation analysis for the ESS Linac TunnelSummary of Shielding and Activation analysis for the ESS Linac Tunnel 7

Diagnostics 3.1.Provide sequenced commissioning of the various linac sections, with temporary diagnostic stations. – As stated in Recommendation 1.4, schedule constraints will make staged commissioning very unlikely. Currently, there is no budget allocated for temporary diagnostic stations. 3.2.Make sure that both ESS team and IK partners contribute to installation, hardware and beam commissioning for gaining crucial expertise. This should be formalized in IK agreements. – See Recommendation Relevant people from ESS (even if only professionals, in this phase) should join the in kind partner groups, during assembly, installation and testing of the accelerator components in the partner labs. – See Recommendation 1.2 8

Diagnostics 3.4.Use opportunities to train the commissioning team also in collaboration with other facilities, as can be the LINAC4 commissioning at CERN in the near future. – See Recommendation Define responsibility for the complete “inter-cavity” areas, from cavity flange to cavity flange – Agreed. In progress. 3.6.Include testing of all possible diagnostics equipment with beam in the agreement with IK partners, including this phase in the deliverable whenever applicable. – Many of the diagnostics are based on designs from other laboratories that have been tested with beam. For example, the BPM detectors, are based on the XFEL detectors, the BLMs are the same model as the LHC BLMs. There will be beam and instrumentation tests of the ion source and LEBT. There is a plan for beam testing the ion source, LEBT, LEBT, RFQ and MEBT at CEA. However, schedule constraints allow for little time for design iterations in this test and the RFQ is close to the critical path. Also, it would not be possible to meet the schedule if every prototype of instrumentation in the high energy end must be tested with beam. 9

Diagnostics 3.7.The diagnostics team should take every opportunity to work in collaborating labs on the commissioning of new linacs, to gather experience and to better identify shortcomings and potential needs. – See Recommendation As far as possible, prototypes for ESS should be tested with beam before going into series production. – See Recommendation Provide explicit specifications so that all instrumentation will be compatible not only with the control system, but also any application programs. – This is part of the Level 4 requirements that are being written. Since the commissioning plan, which drives the requirements for the instrumentation, is not complete, these requirements are not complete resulting in the current specifications for instrumentation on a best guess method. Once the requirements are complete, the specifications will be updated. 10

Diagnostics 3.10.ESS diagnostics team must take ownership of all instruments once in operation mode and will need the resources to do so. – It is the plan for ESS to take operational responsibility of all in-kind contributions. The operational staff plan for the Accelerator Division is shown in Appendix Provide clear specifications for all diagnostics interfaces, and the electronics standard, which has to be used by the manufacturer. Order complete systems whenever possible. – See Recommendation Define detection time for partial beam loss. – A Machine Protection Committee has been formed and this will be part of its charge Define diagnostics needs for beam commissioning. – See Recommendation Foresee “redundant” diagnostics in order to cope with non- available systems during start-up. 11

ACCSYS MILESTONES FOR THE NEXT 12 MONTHS 12

ACCSYS MILESTONES FOR THE NEXT 12 MONTHS 13

ACCSYS EVM CURVE FOR

AD Long Term Staff Plan 15

AD Long Term Staff Plan 16