COUPP 2L Chamber at SNOLAB Jeter Hall Fermilab Center for Particle Astrophysics.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
EDIT-2012 Detector School at Fermilab First school at CERN was a response to a strong need, as shown in ICFA survey Big success, with 88 students participating.
DMSAG 14/8/06 Mark Boulay Towards Dark Matter with DEAP at SNOLAB Mark Boulay Canada Research Chair in Particle Astrophysics Queen’s University DEAP-1:
Samantha Kuula Interactions May 2012 SNOLAB Science and Impact Samantha Kuula SNOLAB Communications Officer Samantha Kuula SNOLAB Communications Officer.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Status of COUPP Experiment in the MINOS tunnel Erik Ramberg AEM 4 February, 2008.
Soudan Underground Laboratory Features Moderate depth (2100 mwe) augmented with active muon veto shield Existing infrastructure (power, water, networking,
COUPP-60 NuMI Commissioning Andrew Sonnenschein All Experimenters Meeting, Oct 18, 2010.
Ocean Connections: Mapping potential pathways between the spill in the Gulf of Mexico and the Jersey Shore Dr. Josh Kohut Rutgers University School of.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Spin-Dependent Wimp Limits from a Bubble Chamber E. Behnke,1 J. I. Collar,2* P. S. Cooper,3 K. Crum,2 M. Crisler,3 M. Hu,3 I. Levine,1 D. Nakazawa,2 H.
Lance Garrison R. Cooper, H.-O. Meyer, T. Mikev, L. Rebenitsch, R. Tayloe, R. Thornton.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Direct Detection of Dark Matter: CDMS and COUPP
Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003.
COUPP: Chicagoland Observatory for Underground Particle Physics (FNAL Test Beam Program T-945) J. Collar, K. Crum, D. Nakazawa, B. Odom, J. Rasmussen,
Low background Screening and Prototyping Facility at the Soudan Underground Lab 40’ x 35’ x 100’ cavern surrounded by a 99% efficient active muon veto.
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
The Experimental Physics Projects Department - an Overview David Christian September 11, 2006.
APS April meeting Jacksonville, 2007 WIMP Search With SNOLAB Chris Jillings SNOLAB Staff Scientist For the DEAP-1 Collaboration.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
PICASSO, COUPP and PICO - Search for Dark Matter with Bubble Chambers
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Bei Cai and Mark Boulay For the DEAP-1 Collaboration Queen’s University, Canada Pulse Shape Discrimination (PSD) in Liquid Argon from DEAP-1 APS meeting,
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - April 23, 2007 Cryogenic Dark Matter Search (CDMS) Progress at Soudan since last summer Successful.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Searching for Dark Matter with a Bubble Chamber Michael B. Crisler Fermi National Accelerator Laboratory 14 February, 2009.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
CERN October 2010CERN-Korea Committee1 CERN Teacher Programmes Inspiring the next generation of scientists Mick Storr Head CERN Teacher Programmes and.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Dark Matter Search Results from the COUPP 4kg Bubble Chamber Russell Neilson for COUPP ICHEP 2012, Melbourne July 7, 2012.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
DARK MATTER SEARCH Carter Hall, University of Maryland.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
COUPP-60 Safety Review: Project Overview. Andrew Sonnenschein Fermilab May 18, 2012.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Neutron Shield/Muon Veto (WBS 1.3) and Underground Installation Issues (WBS 1.6) May 11, 2009 Erik Ramberg.
Submergible Acoustic Transducers for Superheated Fluid Dark Matter Experiments Abstract: Abstract: Submergible Acoustic Transducers for the PICASSO Dark.
US Construction Project: SSs, PRY, Cavities and test program 1.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
C OUPP is a series of progres- sively larger, refrigerant filled bubble chambers (from 50g to a proposed 500kg device) in the hunt to directly detect dark.
Lab Coordinator Cheat Sheet COUPP-2L SNOLAB Phase I Operations – Hydraulic Cart Commissioning – NESLAB Heater/Chiller Commissioning – DAQ, Controls commissioning.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
LBNF/DUNE Update Public Meeting Sanford Lab Update
A Bubble Chamber for Dark Matter Detection
CLAS12 Commissioning with Cosmincs
Hall C Cryogenic Target Status
The Beam Test at Fermilab:
The SABRE Crystals Frank Calaprice.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Presentation transcript:

COUPP 2L Chamber at SNOLAB Jeter Hall Fermilab Center for Particle Astrophysics

11/22/10All Experimenter's Meeting COUPP Special Report University of Chicago Juan Collar (PI, spokesperson), C. Eric Dahl, Drew Fustin, Alan Robinson, Matthew Szydagis Indiana University South Bend Ed Behnke, Joshua Behnke, Austin Conner, J. Henry Hennefeld, Ilan Levine (PI), Andrea Palenchar, Tim Raymond, Tina Shepherd, Brendan Sweeney Fermilab Steve Brice, Dan Broemmelsiek, Peter Cooper, Mike Crisler, Jeter Hall, Martin Hu, Hugh Lippincott, Erik Ramberg, Andrew Sonnenschein COUPP Collaboration 2

COUPP 2L Chamber Summary Dark matter search using a bubble chamber filled with CF 3 I (operates at 20-50°C and PSI) 2009 run in MINOS near hall was limited by cosmic radiation (300 ft overburden) Summer 2010 detector moved to SNOLAB in Ontario (6800 ft overburden) Chamber is now operational, shielded, and taking science quality data 11/22/10All Experimenter's Meeting COUPP Special Report3

SNOLAB Recent extension has increased the experimental space at the 6800 ft level 11/22/10All Experimenter's Meeting COUPP Special Report COUPP 2L Located in ‘J’ drift 1 mile hike to cage ride 4

Safety First Met the electrical safety authority Safety reviews with SNOLAB personnel before proceding with new procedures 11/22/10All Experimenter's Meeting COUPP Special Report5

Initial Installation DAQ, pressure vessel, and hydraulic system installed mid July Took data runs with the full hydraulic and DAQ system for three weeks 11/22/10All Experimenter's Meeting COUPP Special Report6

Inner Vessel Mark Ruschman and inner vessel arrive late August /22/10All Experimenter's Meeting COUPP Special Report7

First Bubble kg CF3I distilled on September 2nd First bubble on the next day 11/22/10All Experimenter's Meeting COUPP Special Report8

First Problem Bubbles appearing in the hydraulic fluid Organized another trip for mid October Leaking accumulator tank (AC1) swapped out Fully operational October 17th 11/22/10All Experimenter's Meeting COUPP Special Report9

Shielding 20 inch thick boxes made with 1” thick HDPE Filled with SNOLAB high purity water 11/22/10All Experimenter's Meeting COUPP Special Report Solid Poly Water Boxes Seismic Damping Completed November 5th 10

Remote Monitoring 3 Webcams Remote DAQ control SNOLAB personnel extremely helpful Real time analysis 11/22/10All Experimenter's Meeting COUPP Special Report11

Current Status Maintaining ~85% live time 11/22/10All Experimenter's Meeting COUPP Special Report Shield Installed Leaking Accumulator Tank Planned Power Outage 12