ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels.

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

Excel Vocabulary.
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
S.PopescuAlice DCS workshop, Colmar, Standards for control room PVSS panels A brainstorm meeting.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
BETTER INTERACTION FOR BETTER COMMUNICATION. A little preview of the PowerVote Quizz toolbar.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
L. Granado Cardoso, F. Varela, N. Neufeld, C. Gaspar, C. Haen, CERN, Geneva, Switzerland D. Galli, INFN, Bologna, Italy ICALEPCS, October 2011.
11 MAINTAINING THE OPERATING SYSTEM Chapter 5. Chapter 5: MAINTAINING THE OPERATING SYSTEM2 CHAPTER OVERVIEW  Understand the difference between service.
So – You want to learn how to put an advanced article submission (cut and paste) onto the state website. (Note: If you have not done so, you will need.
DIRAC Web User Interface A.Casajus (Universitat de Barcelona) M.Sapunov (CPPM Marseille) On behalf of the LHCb DIRAC Team.
Lab How to Use WANem Last Update Copyright 2011 Kenneth M. Chipps Ph.D. 1.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
D etector C ontrol S ystem HMPID SB G. De Cataldo CERN-CH, A. Franco & A. Nardulli INFN Bari, I 1 HMPID Updates and prototyping HMPID DCS with.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
VistA Imaging Capture via Scanning. October VistA Imaging Capture via Scanning The information in this documentation includes only new and updated.
Peter Chochula ALICE DCS Workshop, October 6,2005 DCS Computing policies and rules.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
UN/CEFACT Projects in Confluence (new ODP) User Guidelines :
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
ALICE, ATLAS, CMS & LHCb joint workshop on
Peter Chochula DCS Remote Access and Access Control Peter Chochula.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
ALICE Use of CMF (CC) for the installation of OS and basic S/W OPC servers and other special S/W installed and configured by hand PVSS project provided.
MySQL and GRID status Gabriele Carcassi 9 September 2002.
Clara Gaspar, July 2005 RTTC Control System Status and Plans.
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
The CERN Computer Centre Supervision Project Helge Meinhard / CERN-IT HEPiX Catania 2002/04/18
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
DCS Instructions K. Grogg, M. Weinberg, M. Grothe 1/24/20161.
Rack Wizard LECC 2003 Frank Glege. LECC Frank Glege - CERN2/12 Content CMS databases - overview The equipment database The Rack Wizard.
Transition to SVN server: follow up P.Hristov 24/01/2008.
22 March 2010 DCS workshop C. Bortolin, g. de cataldo and A. Franco INFN it/CERN CH 1 Progress on LHC data exchange LHC-ALI_DCS project overview Future.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
CMS Luigi Zangrando, Cern, 16/4/ Run Control Prototype Status M. Gulmini, M. Gaetano, N. Toniolo, S. Ventura, L. Zangrando INFN – Laboratori Nazionali.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
6 May 2010 RICH2010 Cassis. G. De Cataldo, A Franco and G. Volpe INFN Bari It and CERN-CH 1 The ALICE HMPID Detector Control System, its evolution towards.
Bomgar Remote support software
Publishing PVSS data on the Web
Downloading and Installing SQLExpress
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 1 Standardization of the DCS control panels The ACC is elaborating a set of panels (GUIs) to be proposed at the sub-detector DCS groups as : –Access Control panel; –DCS control panels; –full detector FSM control (REM: distributed system); In this way, when integrated in the ALICE DCS, the operation of each sub-detector can be done via a set of GUIs having the same ‘look and feel’; Once approved, by the end of March 06, the first prototype of GUIs will be available on the ALICE DCS site along with instructions for their integration in your present DCS project; The proposed GUIs will be periodically updated according to the suggestions/comments that will be collected from the DCS users after a certain time of usage.

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 2 The DCS Access Control 1 ° Once the operator starts the DCS project from the PVSS consolle, this panel will be the first panel to be automatically opened Detector Standard FW login window Access control Commands: L ogout C hange U ser S et P assword F ind U ser 2° Pushing the WXP standard button then the FW login panel will appear. Only once authenticated the main DCS control panel will appear (see next slide) giving at the User the corresponding rights of operations

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 3 3° The main DCS control panel as provided for the FSM in the FW -For a FSM hierarchy of a distributed system, as on the top of the figure,the pannel below is automatically provieded by the SMI++ tool in the FW; -Tha ACC, starting from this standard proposes a new panel that integrates extra features M3M4M5M6M7 DCS M1 Racks M2 PC2 PC1

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 4 Title Bar related to the PanelMessage & Info window Operator Tools bar FSM Control Zone Expert Tools bar Detector Monitoring Zone 3° bis : The ACC proposal for the standard DCS panel Short cut on critical lower parts of the FSM hierarchy

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 5 Deep inside the GUI for the FSM CONTROL ZONE FSM servers status and FSM Control windows button FSM Node control status widget Hierarchy children control status widget Specific FSM Node status widgets The HMPID FSM Control Window DEAD In the distributed project on two machines, the FSM engines have to be started on each machine via the relevant FW editor/navigator windows. Here it is proposed a series of panels which : integrates the “start/stop all” FSM engines in one button; Give the FSM servers status; provides the operation mode setting (included, excluded, shared..etc) for the DCS FSM processes; Synoptic view of all the FSM processes provides the editing/downloading of the corresponding FSM configuration file. This is a new proposed feature, so far not included in the FW.

ALICE DCS Workshop - 14/03/2006 De Cataldo, CERN CH and INFN Bari - 6 Conclusion By the end of March 06 the proposed set of GUIs will be available on the ALICE DCS web page Instructions will be provided for their installation and test in the user DCS project In order to improve these panels, feedback from user will be welcome