Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
CFC/HCFC Requirements & Enforcement Issues Don Gansert Managing Consultant November 20, 2008 trinityconsultants.com.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Updating Title V Post Permit Forms Joseph A. Janecka, P.E., Air Program Liaison Field Operations Support Division TCEQ.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
© Jeffer, Mangels, Butler & Marmaro LLP CAA Title V Regulatory Requirements Malcolm C. Weiss, Esq. (310) Jeffer, Mangels, Butler.
Petition to EPA to Object to (Veto) a State Permit Joy Wiecks Fond du Lac Band of Lake Superior Chippewa Joy Wiecks Fond du Lac Band of Lake Superior Chippewa.
Responding to a Notice of Violation Pinal County Air Quality Workshop January 14, 2014 Mike Sundblom - PCAQCD.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
2015 NCMA EPA Enforcement Policies and How They Affect Your Facility Michael Pjetraj, P.E. DAQ Stationary Source Compliance Branch Supervisor.
Title V Site Operating Permits (SOPs)
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Network security policy: best practices
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
WELCOME: EPA PUBLIC MEETING
File & Suspend Rate Cases Water & Wastewater Reference Manual1.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Frank Steitz Air Quality Permitting Program 10/12/2012
Title V Program Evaluations 1 st Round Overview Gregg Worley Section Chief Air Permits Section EPA Region IV.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
SIP Development and Implementation in New Mexico - and Why it Matters to Tribes Rita Bates Planning Section Chief Air Quality Bureau New Mexico Environment.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
School Budget (Draft)
1 GRIC Tribal Implementation Plan Development Dan Blair, Air Program Mgr. Gila River Indian Community (GRIC) Department of Environmental Quality.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
Annual Training for County Election Officials NC State Board of Elections August 14, 2012.
Implementing the Regulatory Flexibility Act. 2 Background The Regulatory Flexibility Act (5 U.S.C. 601–612) requires Federal agencies to— –Consider the.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Title V: The Big Picture
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
NH Department of Education Division of Program Support Bureau of Nutrition Programs and Services Verification Module for National School Lunch Program.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Rigid Plastic Packaging Container (RPPC) Informational Update Permitting and Compliance Committee Meeting February 17, 2009.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Title V Compliance Certification Troutman Sanders LLP Greg Blount, Margaret Campbell, Debbie Cline.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
CAA Program Reporting Clarification Regarding Federally-Reportable Violations for Clean Air Act Stationary Sources (March 2010) (FRV Clarification Memo)
NSR and Title V Activities WESTAR Business Meeting May 2005.
Title 5 Permits The Clean Error Act ©2002 Dr. B. C. Paul.
Title V Review DJ Law US EPA Region 8.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
How to target your review Genevieve Damico U.S. EPA (312)
Changes to Contested Case Hearing Requirements and Procedures Janis Hudson Environmental Law Division Texas Commission on Environmental Quality Advanced.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
TAS and TIP Swinomish Tribe and the Incremental Approach.
Temporary Assistance for Needy Families Part 265: Data Collection and Reporting.
Title V Site Operating Permits (SOPs) Initial, Revision, and Renewal Applications Vasant Chaphekar, P.E. & Carolyn Maus, P.E. Air Permits Division Texas.
THE NEW CLEAN WATER ACT E-REPORTING RULE: WHAT ELECTRONIC DATA REPORTING AND SHARING MEAN FOR YOUR OPERATIONS By: Damien M. Schiff Principal Attorney Pacific.
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
Submittal And Review Of New And Revised Water Quality Standards
Preparing for Permit Review
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Class I Redesignations
Americas Aerospace Quality Group Registration Management Committee
Region 4 Air Directors Spring Meeting May 20, 2015
Presentation transcript:

Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA

Major Topics 2 Purpose of title V program Who issues permits and how Who needs a permit What is included in a title V permit How permits promote compliance Unique features of title V permits

The Need for Title V 3 Air quality goals were not met Confusion as to what requirements applied to a facility Existing rules often lacked monitoring Limited public access and comment Weak compliance oversight Purpose of Title V permit: accountability, improved compliance and enforcement

Who Issues Title V Permits? 4 State and local agencies EPA in Indian Country Tribes – if they develop a program and get it approved by EPA

Who has to Get a Title V Permit? 5 All major sources Plus some non-majors Around 20,000 major sources nation-wide Call your permitting agency to see which sources are getting permits See ain.html

How do Permits Get Issued? 6 Sources must apply Permitting agency prepares draft permit Draft permit is reviewed by public Public hearing may be requested EPA reviews some State permits and may veto the permit Final permit is issued

Permit Applications 7 New sources  Due within 12 months of starting to operate Sources that have title V permits  Due at least 6 months before 5-year renewal date Sources that need their permit updated (modified)

What is Included in a Title V Permit 8 All applicable requirements including  Requirements from federal standards, such as  Maximum Achievable Control Technology Standards  New Source Performance Standards  Terms and conditions from New Source Review permits  Conditions from State Implementation Plan Origin and authority for each permit term Monitoring, recordkeeping, and reporting

What does a Title V Permit Look like? 9 Can be quite long ( pages for a medium size permit) Statement of basis States choose the format General conditions Conditions for specific process line or emissions source

What does a Title V Permit Look Like? (cont.) 10 For each process line or emissions source, permit generally has  Description of process and its pollution control equipment  Emission limit or other type of limit  Monitoring, recordkeeping and reporting

Handout: Sample excerpt from a permit 11

Section II: Compliance Features of Title V 12 Title V Operating Permit Program

How do Title V Permits Promote Compliance? 13 Title V Permits Roll all applicable requirements into one document Add source-specific monitoring (sometimes)  Monitoring means collecting and using data on emissions or other information about the operation of a process or pollution control device  Each permit limit or condition needs monitoring “sufficient to assure compliance”

How do Title V Permits Promote Compliance? 14 Add reporting  Prompt reporting of deviations  Semi-annual monitoring reports  Annual certifications Allow greater access to records Are federally enforceable

How do Title V Permits Help Enforcement? 15 Reports and certifications alert permitting agency and public Permit settles what requirements apply

Public Availability of Records 16 Permit application (except confidential business information) All reports and certifications Draft and final permit Correspondence

Public Involvement During Comment Phase 17

Minimum Requirements for Public Involvement 18 Minimum requirements for notice of draft permit  Newspaper notice  Creation of mailing list to provide notice  Other means necessary to notify affected public 30 day public comment period 30 days notice prior to public hearing (if one is held) Record of commenters, issues raised, must be kept

Opportunities for Involvement 19 Obtain copy of application Request informal meeting with permitting agency Review file and draft permit; submit comments Request and participate in public hearing Petition EPA to object to the permit if your concerns have not been met

Petitions to EPA to Object to a Permit 20  EPA must object to a permit if it is not in compliance with the requirements of title V  E.g., does not include all applicable requirements or does not assure compliance with applicable requirements Anyone who commented on the permit can petition EPA to object to a permit If EPA objects to the permit, permit cannot be issued  If permitting authority fails to revise the permit, EPA will issue or deny a permit

Timeline After Permit is Sent to EPA 21

Different Views on Title V 22 Increases industry’s costs and risk of discovering (and having to report) violations Some States  Welcome the extra monitoring and compliance  Think its just a bunch of paperwork Environmentalists love the accountability, extra monitoring, better access to information

Unique Features of Title V Program 23 Statement of Basis Permit Shield Periodic Monitoring Petition to Object

Resources for Permit Review 24 Proof is in the Permit NY Public Interest Research Group materials on title V Region 9 (Draft) Permit Review Guidelines part.html Region 7 title V petition data base

Summary 25 All major sources must have a Title V permit Title V permits improve compliance and enforcement by  Including all applicable requirements  Adding monitoring (sometimes)  Reports and certifications  Public access to documents Public review makes for better permits