Borderplex Gridlock Jaime Muniz, Arien Hardin, Michael Maillet.

Slides:



Advertisements
Similar presentations
New Public Transit Alliance (NuPTA) RIPEC Study: Transportation at a Crossroads (2002) Growing Smart with Transit: A Report of the Transit 2020 Working.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Secretaria de Relaciones Exteriores Border Infrastructure.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Department of Industrial Engineering1 Economic Evaluation of the Impact of Waterways on the Port of Cincinnati-Tristate Heather Nachtmann, Ph.D. River.
Sustainable Transportation Brock University March 2008.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
San Ysidro Border Crossing Otay Mesa Border Crossing Otay Mesa Commercial Crossing.
Highways: free or toll?. In the past, roads were considered a public good Now it is possible to make people pay: should roads be produced by the private.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
RTA Legislation Crafted with Three Principles  Keep it simple  Provide maximum local flexibility  Utilize existing law whenever possible.
INTERNATIONAL RELATIONS OFFICE. What is the International Relations Office? 2 T he Office was created in 1994 in response to the North American Free Trade.
Hollywood Central Park BTF Consultants “Building the Future”
Transportation Funding Challenges Jason Segedy, Director Akron Metropolitan Area Transportation Study May 2010.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Trains are better for our environment than other modes of travel.
Funding Your Journey Florida Transportation Economics 101 Presenter’s Name Organization.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
A Case Study of Promoting Metropolitan Freight Collaboration: The Twin Cities Experience Performance Management Framework Minnesota Department of Transportation.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
OPPORTUNITIES FOR INVESTMENT IN THE STATE OF GOIAS DEVELOPMENT INFRAESTRUCTURE OF TRANSPORT IN METROPOLITAN REGION OF GOIÂNIA.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
5 th Bi-Annual Border to Border Conference Performance Measures at Commercial Ports of Entry Juan Carlos Villa.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Estimating Economic Impacts of Border Wait Times in the San Diego-Baja California Region February 24, 2006.
COORDINATED BORDER INFRASTRUCTURE PROGRAM. SAFETEA-LU Signed August 10, 2005 Created CBI program from Border/Corridor discretionary program from TEA-21.
Southern Bridge Project Brown County Executive
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Transportation Funding Workshop Nova Southeastern University December 10, 2012.
Keeping Texas in Business. Texas has a long legacy of good roads Symbol of our economic prosperity, attracting jobs and people to the State In part, our.
Economic Significance of the Border: A Perspective at the Regional and National Levels for both Passenger and Freight Movements Bruno Penet HDR | Decision.
SFO ORGANIZATIONAL SUSTAINABILITY 1 By Saidah Leatutufu.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
Baseline Scenario Quality Growth Strategy.
Cycling in the 21 st Century: Developing a Bike-Friendly Community in Hartford, CT By: Alex Perez Trinity College 17’
Transportation Disadvantaged Local Coordinating Board (TDLCB)
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
ADOT Mexico and Border ADOT Mexico and Border Strategy Gail Lewis Arizona Department of Transportation Congressional Briefing November 3, 2015.
Darrin Roth American Trucking Associations, Inc. INTERNATIONAL SYMPOSIUM ON ROAD PRICING.
Portland 2040 Analysis. Portland residents drive less… While per capita vehicle miles traveled is increasing nationally at an average of 2.3% per year,
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Linking Northern, Central and Southern California to the world and the nation.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
T H E M O D E L B O R D E R O F T H E 2 1 ST C E N T U R Y U N A F R O N T E R A D E S E G U R I D A D Y P R O S P E R I D A D © Copyright SecureOrigins,
Illinois Intrastate Shuttle Sponsor: America’s Central Port, Granite City, Illinois Route: M-55 Marine Highway Route (Illinois River) Project Snapshot:
The Transportation Logistics Company Indiana Logistics Summit Infrastructure Needs and Opportunities September 26, 2007.
North American Motorcoach Travel: A Green & Safe Alternative 5 th European Bus & Coach Forum International Road Union Kortrijk Xpo, Belgium October 2007.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Border Wait-Time Emissions Analysis Study 1 Project Briefing Travis Black Federal Highway Administration November 14, 2012.
Freight Performance Measures at the Texas-Mexico Border: Wait Times, Travel Times and Data Dissemination Border to Border Conference November 14, 2012.
Trouble in Juarez BY Chris Maleki Jason Swope.  NAFTA, the North American Free Trade Agreement, was signed by the United States, Canada, and Mexico.
Rice University – Baker Institute
Railroad.
Regional Roads Committee
Problem – Solution - Impact
Southern California Transportation Outlook to the year 2040
21st Century Transportation Committee Finance Subcommittee
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
The Business of Public Transportation
Comprehensive and Dependable Transportation Plan
Presentation transcript:

Borderplex Gridlock Jaime Muniz, Arien Hardin, Michael Maillet

El Paso-Juarez Second largest binational metropolitan area on the United States- Mexico border Population of 2.7 million people (and growing) Thousands of individuals cross the border daily for wok and school 14,000 on foot Thousands more via vehicle

The Problem? We have been contracted by Quezada Management Services, (QMS) to assist El Paso in identifying a feasible, competitive transportation project. Ultimate goal is to improve cross border movements of both individuals and goods

Options Available Subway Highway/Bridge Increase the Number of Lanes Open Freight Shuttle

Pros of Public Transportation Saves fuel Reduces Congestion on roads Provides jobs Drives community growth Reduces carbon footprint

Potential Subway Line 10.9 km of track stretching from Parque Central Hermanos Escobar in Juarez, Mexico to San Jacinto Square in El Paso, TX Estimated cost of 981 million dollars Aims to cut down crossing time to just 30 minutes

Pros of Subway Safer than driving Quicker than driving Cheaper than driving No maintenance needed by rider

Cons of Subway Time constraints (Riders are limited to the schedules set forth by line operators) Potential delays Noise/Heavy Crowding/Spread of Disease Criminal Activity

Highway If a highway is built it must: - Connect El Paso and Juarez, - Make the flow of traffic to and from easier, - Be within the budget. The average cost to build a 4-lane highway in an area like El Paso ranges between $8-10 million.

Idea: There are currently three bridges that connect El Paso and Juarez:  Paso del Norte Bridge  Stanton Street Bridge  Ysleta Bridge Paso del Norte Bridge:  Located at 1000 S. El Paso Street  4 lanes  Serving northbound and southbound pedestrians  Serving only northbound passenger vehicles(non-commercial vehicles)

Idea cont’d.. Stanton Street Bridge:  Located at 1001 S. Stanton  4 Lane  3 for southbound vehicle passenger travel  1 for SENTRI or Dedicated Commuter Lane(DLC)  Southbound pedestrians Ysleta Bridge:  Located at 791 S. Zaragoza  Split into two bridges; one for commercial, one for passenger vehicle travel and pedestrians  Vehicle bridge has 5 lanes  Commercial bridge has four lanes

Idea cont’d.. Rather than build a brand new highway, we should reconstruct one of the bridges that we already have and possibly expand the number of lanes of the bridge so that: Flow of transportation is more efficient for commercial and non-commercial vehicles making it easier to transport goods and people back and forth. We will save money because it will be less expensive to reconstruct than to build a brand new highway - Price to reconstruct is around $8.9 million

Increase the Number of Lanes open. Currently the main issue affecting pedestrians and motor vehicles crossing ny of the international bridges connecting El Paso to Juarez is the long wait times. Lack of available CBP agents results in only 3 to 4 lanes open at any given time. Rarely are all the available lanes open at these El Paso/Juarez points of entry. This results in 2-3 hours waiting times especially in the holidays.

The Proposal The Proposal is to bring down the waiting times at the El Paso/Juarez points of entry by increasing the number of lanes open at any given time. Decrease waiting times down to 30 min. Decrease emissions given out by the motor vehicles idling for long periods of time. Increase local, national, and international growth.

The Proposal Continuation In order to increase the number of lanes open at the bridges the funding issue to hire more CBP agents must first be resolved. One proposal is to increase the toll fee at the El Paso/Juarez bridges this would generate 3.1 million in revenue. This would increase trade between: El Paso/Juarez US/Mexico Increase revenue for US and El Paso companies. Increase the number of available jobs in US and El Paso.

The Proposal Continuation Another proposal is to charge a fee to US bound vehicles using the BOTA. BOTA-is a the federally-controlled international bridge, was established by the Chamizal Convention of The fee would be imposed on commercial traffic at a border safety inspection site located near BOTA. That site is owned by the Texas Department of Transportation and operated by the Texas Department of Public Safety. Another proposal is to use the Metropolitan Planning Organization(MPO) in order to raise the funds. MPO is a federally mandated and federally funded transportation policy-making organization in the US that is made up of representatives from local government and governmental transportation authorities. MPOs receive federal, state and local funding to help cities plan transportation projects.

Freight Shuttle Another proposal that would increase trade and promote local, national and international growth would be to construct a Universal Freight Shuttle that would transport unmanned freight between El Paso and Juarez. Freight shuttle would consists of guideways at the border linking El Paso and Juarez. This would move unmanned transport cargo vehicles using electric motors.

Freight Shuttle Continuation Advantages for the project would be less congestion on the border and in near by street in the El Paso area. It would increase trade between Mexico and the US by limiting the amount of time cargo reaches it destination. It would also increase trade by limiting fuel consumption and increasing the amount of trade that can be transported. This would also decrease the amount of emissions produced by idling vechicles.

Freight Shuttle Continuation The Disadvantages with the Freight Shuttle would be the cost of constructing the shuttle system. Estimated Cost for the construction of this integrate system would range somewhere near 100 million. This system is more reliable and safer system than our current system. This system would attract more clients in the maquiladora industry among others. It would also help capture some of the business that El Paso has lost over the years.

Conclusion We have listed our 4 proposal ideas in order from least costly to most costly and have also taken into consideration the impact each project will have on the El Paso/Juarez area. 1.Increase the Number of Open Lanes 2.Highway/Bridge 3.Freight Shuttle 4.Subway

Conclusion To conclude our proposal, we have described four ways that we can improve conditions in the El Paso/Juarez points of entry. The conditions would improve significantly by limiting the waiting times down to only 30 min. The lowering the wait times will also lower emissions transferred into the atmosphere by idling vehicles, improving environmental conditions for El Paso and Juarez. These projects will not only make trading between countries more efficient but will also generate opportunities to create more jobs in both bordering cities.