Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)

Slides:



Advertisements
Similar presentations
Session V: Integration of Risk Information and Early Warnings in Emergency Preparedness, Planning and Response Ricardo Mena, OCHA.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
André Augustinus 16 June 2003 DCS Workshop Safety.
Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
ROTHENBUHLER ENGINEERING
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
PDS secondo le IEC n.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
8th RESS IG IMMA contribution RESS-8-9. IMMA L6/L7 contribution IMMA has decided to provide the global expertise on L6/L7-vehicles at WP29 to address.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Information Systems Security Computer System Life Cycle Security.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
MEDICAL EQUIPMENT AND UTILITES MANAGEMENT Louis Stokes Cleveland, Department of Veterans Affairs Medical Center JCAHO Environment of Care Series Fiscal.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
André Augustinus 16 September 2002 Safety issues.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
Computer Centre Upgrade Status & Plans Post-C5, June 27 th 2003 CERN.ch.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
The D50 Is a state of the art environmental monitor using only the best quality components available. It offers multiple sensors in a single unit with.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
NERC Lessons Learned Summary LLs Published in September 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
R2E Workshop Preparations RadWG Meeting March 25 th.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
R2E Availability October 15 th 2014 RE Equipment G. Spiezia.
YETS & LS2 Works EN-EL / Power distribution
Electronics and Controls
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
EYETS Works EN-EL [ FC excluded ]
by Fritz Szoncsó CERN HSE
Background B513 built in early 1970’s for mainframe era.
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
LV Safe Powering from UPS to Clients
the CERN Electrical network protection system
YETS & LS2 Works EN-EL / Power distribution
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
Radiation To Electronics Collimation Areas (IR7/3)
R2E Follow-Ups and Project
Presentation transcript:

Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)

Quick Summary emergency (including ambient) lights -> to be relocated to the surface, patch possible if judged ‘reliable’ [HSE approval] AUG -> possible to be relocated to the surface, patch possible if judged ‘reliable’ [HSE approval] EN/EL control racks (RTU, DAU) -> relocation to the no requirement of fire protection as long as alarm and evacuation systems are not concerned by failure access control: unclear but stated as possible to be powered off during operation ??? – -> could thus remain in place remaining equipment: remains in place (follow-up required for equipment relying on micro-controllers -> tests required in H4IRRAD, mid/long-term solution to be determined)

Next Steps Today: R2E project meeting, summary to be discussed with HSE (additional input/comments?) Early next week: follow-up with EN/EL (where do we need further input/proposals) Next Thu (14.4.): R2E committee meeting -> agreed short-term approach and deadlines May: verification that no show-stoppers exist (e.g., cabling passages) Early-June: R2E proposal for HSE approval (within delays for shielding purchase and civil engineering requirements) June/July: H4IRRAD tests determining the mid/long- term strategy for micro-controlled EN/EL equipment

Details What equipment has to be protected (fire, power supply): related to the Alarm (signalization, distribution) required for evacuation (sirens, etc…) (the remaining equipment might be concerned by the equipment safety itself, but does not need a formal approval by HSE) Strategy: equipment owners have to assure/justify the reliability of their equipment related to safety (based on list provided by HSE) this implies a clear distinction between equipment linked to alarm and evacuation (see above) and the rest R2E mitigation options and safety requirements: – lights & possibly also AUG -> surface: fire proof (2h or less if justified) cabling is fire resistant (2h or less if justified) power supply: redundant (not necessarily by batteries) usage of patches (e.g., for lights in the safe-room) is not excluded by definition -> reliability must be proven – control equipment: alarm and evacuation related: -> above requirements must be fulfilled – other equipment: no direct safety constraints, safety/reliability might remain on equipment level

Equipment 1 Fire/ODH control: -> high risk as safety control [already relocated] Electrical equipment surveillance, full control system – RTU -> tested at CNRAD, VERY sensitive [already relocated] – Ethernet Switch -> tested at CNRAD, sensitive [changed in UJ76 to IT/CS, UJ56 similar solution possible] – DAU -> most likely less sensitive, but coherent if relocated together with RTU and switches (also for future upgrades if needed) Relocation possible without need of fire protection as long as alarm and evacuation systems are not affected by malfunctioning (seems to be the case), to be verified, proposal to be submitted to HSE relocation has important impact on cabling - to be compared with the risk of failure (DAU did most likely not fail in CNRAD), to be discussed 18/0.4 kV transformer protection system – Issue with micro-controlled parts (new types already installed) [tests required at H4IRRAD] – mitigation approach will depend on test results -> micro-controllers to be reviewed in general (see also other equipment), solution other than relocation to be envisaged Safety lighting source + distribution (« ambiance + anti-panique ») – safety requirements: fire protection (location and cabling), redundant power supply (not necessarily batteries!) -> assuring 2 hours or less if justified – can be relocated to the surface if above is assured -> batteries are not part of the requirement!

Equipment 2 AUG rack – safety requirements: fire protection (location and cabling), redundant power supply (not necessarily batteries!) -> assuring 2 hours or less if justified LV switchboards for safety equipment -> some micro-controlled? – Issue with micro-controlled parts (new types already installed) [tests required at H4IRRAD] – mitigation approach will depend on test results -> micro-controllers to be reviewed in general (see also other equipment), solution other than relocation to be envisaged 48 Vdc – chargers, batteries, commutation and distribution – Low risk equipment, limited power requirement once safety/ambient light is relocated to the surface Open question: shall/can the remaining (other than lights) 48V distribution be done based on a supply from the surface (e.g., local redundant 230/48 [rad-tol] converter)? Access control rack – sensitivity unclear [possible procedure: power-off during operation] -> to be confirmed/checked by GS/ASE Red/general telephone rack – situation unclear GSM -> only monitoring, not anymore present in UJ76?

Technical Requirements & Required Clarifications Cable inventory based on above strategy – -> passages/place for cabling (main bottle-neck is the TZ76/UJ76 junction!) 48V supply at new locations (TZ76 and Bypass) – -> is a local 230/48V possible (redundancy?) Requirements for patches (e.g., for lights and AUG) – -> to be classified as sufficiently reliable Procedure (power-off during operation) for access control rack Input for red/general telephone rack