ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Present Worth Analysis Dave Ludwick Dept. of Mechanical Engineering University.

Slides:



Advertisements
Similar presentations
MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Advertisements

Capital Budgeting Capital Budgeting: How managers plan significant outlays on projects that have long-term implications (such as the purchase of new equipment.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
26-1 C APITAL B UDGETING LONG-RANGE PLANNING CHAPTER 26.
McGraw-Hill/Irwin Slide 1 McGraw-Hill/Irwin Slide 1 Capital budgeting: Analyzing alternative long- term investments and deciding which assets to acquire.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
Chapter 10 - Capital Budgeting
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
Chap 5 Numerical Methods for Simple Options.  NPV is forced to treat future courses of action as mutually exclusive, ROA can combine them into a single.
EE535: Renewable Energy: Systems, Technology & Economics
Chapter 5 Present Worth Analysis
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. May 31 Capital Budgeting Decisions.
FIN 40153: Advanced Corporate Finance EVALUATING AN INVESTMENT OPPORTUNITY (BASED ON RWJ CHAPTER 5)
Flash back before we compare mutually exclusive alternatives.
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
Engineering Economy IEN255 Chapter 4 - Present Worth Analysis  Do the product or not?  3 main issues  How much additional investment in plant & equipment.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 2000 Chapter Three Opportunity Cost of Capital and of Capital and Capital Budgeting.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 4: The Balance Sheet Dave Ludwick Dept. of Mechanical Engineering University of.
Capital Budgeting Decisions Chapter 14. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
The Time Value of Money.
CAPITAL INVESTMENT AND FINANCIAL RISK Chapter 10.
Capital Budgeting and Investment Analysis
Chapter 4 The Time Value of Money
1 Chapter 5: Essential Formulae in Project Appraisal A Coverage of the Formulae and Symbols Used to Evaluate Investment Projects.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Annual Cash Flow Analysis Chapter 6: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
THE TIME VALUE OF MONEY TVOM is considered the most Important concept in finance because we use it in nearly every financial decision.
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
MER1601 MER Design of Thermal Fluid Systems Engineering Economics – Comparing Alternatives Professor Bruno Winter Term 2005.
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
Evaluating Financial Investment in IT Projects
THE TIME VALUE OF MONEY TVOM is considered the most Important concept in finance because we use it in nearly every financial decision.
Opportunity Cost of Capital and Capital Budgeting
Capital Budgeting Decisions
Present Value
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
The Time Value of Money Translating Cash Flows Forward and Backward in Time.
NPV and the Time Value of Money
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 3 (cont): End of Period Adjustments Dave Ludwick Dept. of Mechanical Engineering.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 4 Time Value of Money.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 3: Statement of Cash Flow Dave Ludwick Dept. of Mechanical Engineering University.
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
FINANCIAL MANAGEMENT Objectives 1. Wealth maximization. 2. Profit maximization The main objective of Financial management is to increase the value of the.
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8 Long-Term (Capital Investment) Decisions.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 3 (cont): Depreciation and Income Statements Dave Ludwick Dept. of Mechanical Engineering.
Equivalence of cash flows Construction Engineering 221.
Rate of Return Analysis Chapter 7: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
By Muhammad Shahid Iqbal Module No. 08 Present Worth Method of Comparison Engineering Economics.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Extra Material: Inflation Dave Ludwick Dept. of Mechanical Engineering University of Alberta.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Copyright: M. S. Humayun Financial Management Lecture No. 12 Capital Rationing Batch 3-5.
©2006 Dr. Howard Godfrey – Extra File for Chapter 11 1 Chapter 11- B Extra PowerPoint Slides This file contains explanations of compound interest computations.
Copyright: M. S. Humayun Financial Management Lecture No. 11 Capital Budgeting - Special Cases Batch 3-4.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Chapter 6: Annual Cash Flow Analysis Engineering Economic Analysis Canadian Edition.
26-1 Preview of Chapter 26 Financial and Managerial Accounting Weygandt Kimmel Kieso.
1 Equivalence Between Two Cash Flows Step 1: Determine the base period, say, year 5. Step 2: Identify the interest rate to use. Step 3: Calculate equivalence.
Cash Flows and Other Topics in Capital Budgeting
Welcome Back Atef Abuelaish1. Welcome Back Time for Any Question Atef Abuelaish2.
Capital Budgeting Techniques
Personal Finance Annuities
Chapter 2 Time Value of Money
Chapter 7 Present Worth Analysis
Engineering Economic Analysis
Presentation transcript:

ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Present Worth Analysis Dave Ludwick Dept. of Mechanical Engineering University of Alberta

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Present Worth present worthEquivalence says that we can shift any sum to an equivalent sum at some other point in time… the equivalent sum at the present time (right now) is called present worth (PW). –PW is the comparable equivalent value at the present time of a future sum or set of sums. –PW or NPV can be thought of as the difference between a future set of cash inflows and cash outflows shifted to the present. This is typical of any investment. You make a cash outlay expecting future cash payments net present valuePW is also called net present value (NPV), although that term is more often used when referring to the total present worth of a series of sums.

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Present Worth Analysis Present worth analysisPresent worth analysis is when we compare the net present value of multiple mutually exclusive options. Present worth analysis considers only future incomes and expenditures. sunk costs –Costs incurred in the past are called sunk costs and are irrelevant when comparing future cash flows. –Sunk costs are in the past. You can’t undo them! FinancinginvestmentFinancing and investment activities are considered separate activities and then their NPVs combined. –The goal is to maximize the PW of investment benefits, minimize the PW of financing costs, and maximize the NPV of a combination of financing and investment activities.

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Present Worth Analysis Example You can consider two types of equipment for your company, each with different costs, net annual benefits, useful lives, and salvage values: #1 #2 Purchase cost$ 200k$ 700k Annual benefit$ 95k$ 120k Useful life 6 yrs 12 yrs Salvage value$ 50k$ 150k Which option is best (assuming a 10% interest rate)?

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Capitalized Costs Capitalized cost analysisCapitalized cost analysis is a special kind of present worth analysis that chooses between several alternatives with infinite analysis periods. capitalized cost –The capitalized cost of an option is the NPV of a perpetual series of cash flows. –Alternatively, capitalized cost is the present sum needed to provide a perpetual series of cash flows that will support a capital project. The capitalized cost, P, that is needed to support a uniform perpetual annuity, A, is:

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Capitalized Costs Example Your municipality decides to invest in a long-term project that will cost $ , and need to be replaced every 70 years (at the same cost). If you estimate a 7% interest rate, what is the project’s capitalized cost? $8M AAAAAA $8M $8M

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Present Worth Analysis using Spreadsheets We can use (P/A, i, n) to calculate the present worth of a series of sums, but another method of doing so is with spreadsheets (e.g., MS Excel). Example: A = $1000, i = 10%, n = 10. Previous Method:

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Spreadsheet Example #1 How much would you pay for a contract that returns $580 per year for 15 years if you have the option of putting your investment into an account that pays 13% interest?

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Spreadsheet Example #2 What uniform annual payments would pay back a $25000 loan over 20 years with a 7% interest rate? goal seek –Hint: We could use trial and error, but using the “goal seek” feature in MS Excel will make this much easier.

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Problem 7.3(a) from Course Notes You are contemplating the purchase of a company that has a $600,000 “balloon payment” on a new 4-year loan with 8.5% interest. As part of your plan to purchase this company, you are contemplating paying off the debt early (i.e., today) in order to take out a larger long term debt with longer repayment provisions, at the current long term interest rate of 7.5%. Questions: –What payment would be a fair offer to repay the balloon payment, assuming that you are going to refinance the new long term debt from the same financial institution at current rates? –What if the company had an equivalent 4-year loan with uniform annual payments?

Dave Ludwick, Dept. of Mech. Eng. Ch 7 – Present Worth Analysis Summer ENGG 401 X2 – Fundamentals of Engineering Management Problem 7.3(a) from Course Notes (2)