A Joint Code of Practice Objectives and Summary Presentation

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Module N° 4 – ICAO SSP framework
Module N° 3 – ICAO SARPs related to safety management
DRAFT GUIDANCE NOTE FOR MEMBER STATES ON FRAUD RISK ASSESSMENT
Managing the Health and Safety of Contractors
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
[Organisation’s Title] Environmental Management System
Environmental Management System (EMS)
BRC Storage & Distribution Safety and Quality Management System Training Guide
ISO General Awareness Training
OHSAS 18001: Occupational health and safety management systems - Specification Karen Lawrence.
Systemise your compliance management Peter Scott Consulting
Session 3 – Information Security Policies
Quality Representative Training Version
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
Audit Committees in Local Government FinPro Professional Development Seminar Linda MacRae Local Solutions Pty Ltd 25 October
Protection Against Occupational Exposure
W504 - Management of asbestos containing materials.
Key changes and transition process
Key changes from OHSAS 18001:1999
Ship Recycling Facility Management System IMO Guideline A.962
Equity Housing Group Risk Management. 05 August 2002 © MazarsEquity Housing Group: Risk Management 2 Agenda Introduction: what is Risk Management? The.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Health and Safety Policy
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
What you will learn in this session 1.Sources of information about health & safety, including national legislation or guidance and local policies 2.Work.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Hazards Identification and Risk Assessment
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Responsible Care® Health & Safety Task Force – 06 H&S.
Risk Management on Tunnelling Projects Warwick University MSc course
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Overview of Environmental Impact Assessment. Overview of EIA The Basics Who Sets the standards? Why do an E(SH)IA? Where does it fit in development planning?
ISO Registration Common Areas of Nonconformances.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
National Corporate Training Pty Ltd0. Topics Follow safe work practices Maintain personal safety standards Assess risks Follow emergency procedures National.
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
Chapter 8 Auditing in an E-commerce Environment
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
MINE SAFETY MANAGEMENT PLAN. DIRECTORATE GENERAL OF MINES SAFETY DGMS n It is recommended that mines be required to put in place Mine Safety Management.
PIC EU-28 Conference Paris, 26 – 27 November 2015 PIC An EU Approach Assurance Maps An Introductory workshop Nathan Paget United Kingdom.
OHSAS Occupational health and safety management system.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
CDM Construction Design and Management
Prevention & Protection SAME ENDS DIFFERENT MEANS? THE FUTURE STRUCTURE AND PURPOSE OF CFOA’ s PREVENTION AND PROTECTION ACTIVITIES.
Business Continuity Planning 101
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018

Information Security Management Goes Global
Campus Wide Safety Committee Initial Meeting 11/9/16
ISO/IEC
Maintaining Safety Standards
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Maintaining Safety Standards
General Data Protection Regulation
Safety Accountabilities
Training Course on Integrated Management System for Regulatory Body
HSE Case: Risk Based Approach.
Internal control - the IA perspective
GA Flight Examiners Seminar
Premises Assurance Model
Project HAZID & Risk Assessment Workshop Process.
Data Security and Protection Toolkit Assurance 2018/19
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

A Joint Code of Practice Objectives and Summary Presentation for the Procurement, Design and Construction of Tunnels and Associated Underground Structures in the United Kingdom Objectives and Summary Presentation

Key Insurer Objectives Have in place risk assessment and management procedures for the tunnelling sector to: Reduce the probability of a loss happening Reduce the size of a claim when it happens Provide Insurers with a better framework for understanding risks during the underwriting process Provide increased certainty on financial exposure

Key Insurer Objectives Create an ‘auditable’ trail for Insurers to ensure compliance Acknowledge that the Joint Code will not prevent claims happening

JCoP for Tunnelling Contents 1 Objective of the Code 2 Compliance with the Code 3 Introduction 4 Definitions and Terms used in the Code 5 Risk Assessment and Management 6 Client Role and Responsibilities 7 Project Development Stage 8 Construction Contract Procurement Stage 9 Design 10 Construction Stage

JCoP for Tunnelling Section 1 - Objective of the Code To promote and secure Best Practice for the minimisation and management of risks associated with Tunnel Works Applies to Project Development, Design, Construction Contract Procurement and Construction Stages of a Project Does not supersede, replace or override existing Standards, legislation etc.

JCoP for Tunnelling Section 2 – Compliance Compliance with the Code is pre-requisite for obtaining Insurance on all projects where the value of the Tunnel Works is £1m or above

JCoP for Tunnelling Section 3 – Introduction Requires identification of hazards and the management of associated risks to ensure their reduction to a level “as low as reasonably practicable” (ALARP) Responsibility for risk management to be explicitly allocated to relevant parties and clearly identified

JCoP for Tunnelling Section 4 – Definitions and Terms

JCoP for Tunnelling Section 5 – Risk Assessment and Management Defines Risk (= consequence of a hazard x likelihood of occurrence) Lists “hazards” (as events which have the potential to impact on a Tunnel Works project) and includes health and safety the environment the design and the costs and programme for design the construction of the project including the programme and cost for construction Third Parties and existing facilities

JCoP for Tunnelling Section 5 – Risk Assessment and Management (cont’d) Notes that “hazards” should be identified on a project-specific basis Risks to be identified and quantified through Risk Assessments for all stages of a project Highlights the requirement for clarification of the allocation of risks (ie ownership - risk owners are those best able to manage the risks)

JCoP for Tunnelling Section 5 – Risk Assessment and Management (cont’d) Requires Risk Registers to identify the hazards, consequent risks, mitigation/contingency plans, proposed actions, responsibilities, critical dates for completion of actions and when actions have been closed out Risk Registers are to provide the “auditable” trail throughout the life of a project to demonstrate compliance with the Code.

JCoP for Tunnelling Section 6 – Client Role and Responsibilities Requires Clients to have demonstrable technical and contract management competence appropriate to the type, scope and extent of the project proposed

JCoP for Tunnelling Section 7 – Project Development Stage Site and ground investigations to be designed, planned, procured and supervised by suitably competent personnel Site and ground investigations to be executed by competent organisations

JCoP for Tunnelling Section 8 – Construction Contract Procurement Stage Selection of type of contract by the Client should take due regard of the allocation of risks to the parties to the Contract and consequently the liabilities of the parties to the Contract

JCoP for Tunnelling Section 9 – Design Stage(s) Principle is to achieve a “robust” design – i.e. where risk of failure or damage is extremely remote Includes for preliminary and detailed designs and temporary works and permanent works designs Section is not prescriptive in terms of Design Methods

JCoP for Tunnelling Section 9 – Design Stage(s) (cont’d) Design Risk Assessments – to consider the impact on the design and hence its implementation of design criteria variations, potential failure mechanisms and intermediate construction stages

JCoP for Tunnelling Section 10 – Construction Stage Requirement for a Project Risk Management Plan to identify means and methods of monitoring, reviewing and updating Construction Stage Project Risk Register Construction Stage Project Risk Register to include all project related risks identified at the Construction Stage together with project-related risks brought forward from the Client's pre-contract Risk Register and which may include health and safety risks

JCoP for Tunnelling Section 10 – Construction Stage (cont’d) Carry out constructability reviews jointly with the Designer to ensure construction methods are suitable and appropriate In the case of self-certification, Contractor to demonstrate how independent supervision of construction will be controlled and maintained Value engineering proposals to include Risk Assessments