Plans for Linear Collider Calorimetry Test Beam Work at Fermilab Andy White for U.S.+European-CALICE and other collaborators.

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
Peter Speckmayer, LCWS2010, Beijing 1P. Speckmayer, LCWS2010, Beijing3/27/2010.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
First analysis of DHCAL Data José Repond Argonne National Laboratory Linear Collider Workshop LCWS 2012 October 22 – 26, 2012 University of Texas at Arlington,
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
PFA Development – Definitions and Preparation 0) Generate some events w/G4 in proper format 1)Check Sampling Fractions ECAL, HCAL separately How? Photons,
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Recent Activity at the Upgraded Test Beam Facility Erik Ramberg AEM 16 April, 2007 Open House and ILC Workshop New Test Beamline Layout and Performance.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
Physics in the Fixed Target Areas Erik Ramberg Users meeting / 2 June, 2004 Beam delivery to Switch Yard Meson Beam Lines MTest: the Meson Test Beam Facility.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Tests of a Digital Hadron Calorimeter José Repond Argonne National Laboratory CALICE Collaboration Meeting March 10 – 12, 2010 University of Texas at Arlington.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Fermilab Test Beam Facility Aria Soha September 19, 2011.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Brajesh Choudhary, Fermilab LCWS 2006, IISc, Bangalore, India, 9 th –13 th March presented by Marcel Demarteau & THE ILC FERMILAB TEST BEAM & THE ILC.
Test Beam: Calorimetric Wishes… Steve Magill, Jose Repond, Andre Turcot, Jae Yu* Jan. 10, 2003 Goals for calorimeter test beam What’s needed for EFA? Requirements.
Interactions of hadrons in the SiW ECAL (CAN-025) Philippe Doublet - LAL Roman Pöschl, François Richard - LAL SiW ECAL Meeting at LLR, February 8th 2011.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Analysis of DHCAL Events
the CALICE test beam set-up and running experience
CEPC 数字强子量能器读出电子学预研进展
SiD Calorimeter R&D Collaboration
Preparation for CERN test beam
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
A summary of world-wide test beam facilities
GEM-based Digital Hadron Calorimetry for SiD
End Station Test Beam (ESTB) at SLAC
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
The Status of Fermilab’s Test Beam Facility
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Tests of a Digital Hadron Calorimeter
Michele Faucci Giannelli
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
LC Calorimeter Testbeam Requirements
Presentation transcript:

Plans for Linear Collider Calorimetry Test Beam Work at Fermilab Andy White for U.S.+European-CALICE and other collaborators

Physics motivation/need - Unprecedented requirement for new level of hadron/jet energy resolution  /E ~ 30%/  E - Separation of W/Z in hadronic mode: 60%/  E 30%/  E

How do we achieve this resolution? - Particle Flow Algorithm approach - High granularity calorimeter (transverse + longitudinal) - Use excellent Pt resolution of tracker for charged tracks, measure photon energies in Ecal, and Ecal + Hcal to measure neutral hadron energies:

Critical Point ! PFA(s) development relies on MC detector simulation => MUST be able to verify MC Calorimeter response over the ranges of energies required and at high spatial resolution: Comparison of the shower radius in a hadronic calorimeter as predicted by fifteen different MC models of hadronic showers

Goals of Calorimeter Test Beam Program Test MC modeling of detector response  Test detector technologies

Fermilab – Meson Test Beam Facility From E.Ramberg/LCWS 2004 Paris

Fermilab – MTBF proton beam From E.Ramberg/LCWS 2004 Paris

One of the two beamline Cerenkov counters One of three MWPC stations Remote controlled scintillator finger counters Silicon tracker From E.Ramberg/LCWS 2004 Paris

Operational Characteristics There are several operational modes: –Proton Mode: Tune beamline for 120 GeV protons that get transmitted through the target. Rates at the user area are limited to 1 Mhz. Maximum rates so far are 200 KHz. –Secondary, or ‘Pion’ Mode: Vary the tune of the beamline according to the momentum desired. Maximum momentum is currently 66 GeV, with rates on the order of 10 kHz. Lowest momentum tune is on the order of 3-5 GeV. (See graph of calculated rates) –Muons: By inserting a beam stop upstream, muons of tagged momentum less than 66 GeV can be delivered to both areas. By inserting the beam stop between the two user areas, muons of indeterminate momentum can be delivered to the downstream area. The former mode has not been tested. The latter mode has delivered 100 Hz of muons to the user area. –Electrons: At low momentum (< 5 GeV), the beamline delivers an enhanced electron fraction, at very low rates. There are intermediate target wheels and sweepers to attempt production of an electron beam at higher momentum. This mode has not been tested yet. Fast extraction delivers from buckets of 20 nsec duration. Each bucket has ~ 500 particles. Can insert beamstop to reduce rate to 0.5 particle/bucket. Resonant extraction delivers ‘smooth’ beam over.4 sec spill. Spill can be made shorter – down to 10 or 20 msec – thus making more intense beam. Spot sizes can be made as small as 3-5 mm square (with 120 GeV protons) and as large as 5 cm square. From E.Ramberg/LCWS 2004 Paris

Components to be tested  Electromagnetic Calorimeter  Hadron Calorimeter  Integrated “tail-catcher” + muon system

Electromagnetic calorimeters Silicon – Tungsten CALICE, SLAC/Oregon/BNL Note: Low energy e - tests planned at DESY late 2004

Scintillator – Tungsten U.Colorado, Japan

Hybrid technologies (Si/Scint with W or Pb) European (Como, Warsaw, LNF, Padova, Trieste) Kansas/Kansas State

Hadron Calorimeters Analog/Semi-Digital CALICE

RPC-Steel ANL,BU, Chicago, FNAL, Iowa GEM-Steel UTA, U.Washington, +… Digital Hadron HV Signal Graphite Resistive plates Gas Pick-up pads

Muon Detector/Tail Catchers Scintillator-Steel US-European RPC Frascati

Asian participation  Most of the linear collider test beam activities planned at Fermilab so far involve U.S. and European groups.  We would like to invite participation by more of our Asian colleagues.  The coordinator of test beam work is Jae Yu from the University of Texas at Arlington:

Proposed test beam program ECal: e - - energy scans, 5 – 10 points (inc. DESY overlap) - incident angle, ~3 points - hadron showers in ECal HCal and Tail-catcher , p – energy scans, 1-66 GeV ( p -> 120 GeV) - incident angle scans -  - for tracking studies

CALICE HCAL movable test stand - Holds ECal + HCal + TC - 3-dimensional variation

Proposed test beam program Combined runs (ECal + HCal + TC): e - - energy scans, 5 – 10 points , p – energy scans, 1-66 GeV ( p -> 120 GeV)  - tracking and calibration

7 – 12/20051 – 6/20067 – 12/20061 – 6/ – 12/ CALICE ECAL X Other ECALs XX CALICE HCAL XXX Other HCALs XXX Combined testsXXXXXX Schedule of proposed activities

Conclusions - A test beam program to study showering in high granularity calorimetry and test new technologies is critically important for LC calorimetery. - Fermilab Meson Test Beam Facility is ready and available for LC calorimeter prototype tests. - Beam and other facility upgrades are being requested. - Several years of testing are foreseen and wider participation is actively encouraged!

Facility Detectors Two beamline threshold Cerenkov counters can be operated independently for good particle i.d. (50’ and 80’ long) Two stations of X,Y silicon strip detectors are installed. Three 0.5 mm pitch MWPC into DAQ + Three 1.0 mm pitch MWPC into the accelerator ACNET control system. DAQ will be minimum bias triggered during the spill. The data from scintillators, Cerenkov counters, silicon and MWPC go into event buffers. Buffers are read out during and after the spill and this data will be accessible to experimenters. From E.Ramberg/LCWS 2004 Paris

Predicted maximum rates in MT6 as a function of momentum for pions and protons kHz GeV

List of MTBF Memoranda of Understanding (MOU): T926: RICET926: RICE - Took data in Feb. T927: BTeV PixelT927: BTeV Pixel - Taking data in Spring T930: BTeV StrawT930: BTeV Straw - Taking data in Spring T931: BTeV MuonT931: BTeV Muon - Install over Summer T932: Diamond DetectorT932: Diamond Detector - Taking data in Spring T933: BTeV ECALT933: BTeV ECAL - Install over Summer T935: BTeV RICH - Install over Summer T936: US/CMS Pixel - Taking data in Spring

Status of Fermilab Test Beam Several experiments have taken data or are currently doing so. Other experiments will be installing in the summer. 120 Gev, 66 GeV and 33 GeV beams have been delivered. Both fast extraction and slow spill have been tested. A low-rate, broad-band muon beam has been established Tracking and DAQ near completion –Either fast spill (  sec) or slow spill ( sec) –Typical operation of 1 spill/minute. Can request higher rates. –~50 K protons/spill at 120 GeV –~3 K secondary beam/spill at 66 GeV –Lower momenta will give lower rates –Muon filters decrease beam by ~10 -3 –Beam spot sizes of ~3 mm square at 120 GeV Summary of Operational Characteristics } (Beam rates have improved x5 since these results)