Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3. Update on status and implications of NWE intraday project (selection of the solution for the platform) 11 th Implementation Group Meeting 1 st March.
Intraday conclusions of NWE IG 9 May. Short term way forward (phase 1) PXs and TSOs confirmed commitment to 2012 intraday project based on ELBAS solution.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
1 IFIEC Energy Forum 22 November 2011 Electricity.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
European Commission views on intra-day and balancing markets
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Status of Implementation of PCR for Day-Ahead Price Coupling
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Continuous Cross-Border Implicit Intraday Trade Status update
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
Structure of presentation
Presentation transcript:

Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011

2 Content  Setting  Joint TSOs and PXs approach  Technical solution  Roadmap  As an example: NWE Implementation Projects

3 Setting  The target model for intraday is acknowledged by all stakeholders: Continuous implicit allocation  Europex and ENTSO-E are committed to implement a pan-European cross-border Intraday mechanism:  A Shared Order Book (SOB), performing continuous cross-border implicit intraday matching, and  A Capacity Management Module (CMM) allocating the cross-border intraday capacity in a continuous manner  Objective: Pooling of intraday liquidity to maximize economic benefit in capacity allocation SOBF CMM Member XMember Y Local Order Book A TSO ATSO B

4 Joint TSOs and PXs approach  Europex and ENTSO-E agreed on a joint approach which provides a robust solution for the Interim and a clear path for a smooth transition towards the Target Model  Interim Solution: Aim to cover at least NWE by end 2012, but open to other Regions  ELBAS-like technology amended with an explicit access where requested by NRAs  Responsibility shared between PXs and TSOs  Local Implementation Projects  Target Model: Launch by end of 2014  Memorandum of Understanding will be signed by TSOs and PXs in order to create the framework and to establish technical and governance principles

Technical solution For the Enduring Solution all products should be matchable through the SOB, subject to consistent arrangements (e.g. nomination, settlement and imbalance rules) and regulatory approval Interim Enduring 5  All cross-zonal capacity will be allocated though the platform  Regional auctions may complement the implicit continuous mechanism and has to be coordinated with and linked to the solution  Explicit access (OTC and balancing) provided by SOB/CMM platform, if regulatory requested and under TSO terms of access (Integrated SOB/CMM functions)

Roadmap Go-Live TSO specification TSO requirements CMM/SOB concept Clearing and settlement Local implementation 6

 The local / multi-party projects will aim to change the current capacity allocation mechanism on several NWE borders into an Elbas-like mechanism  Open to other borders or regions when ready As an example: NWE Implementation Projects for the Interim Implicit and explicit continuous capacity allocation Explicit continuous capacity allocation Explicit capacity allocation No capacity allocation 7

Thanks for your attention!