MicroSCADA Pro Ortviken upgrade & Crimea Wind Power Plant

Slides:



Advertisements
Similar presentations
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Advertisements

VAMP 300 IED functionality Feeder relay Motor relay
MIFII DIGITAL FEEDER PROTECTION A Cost Effective Protection Solution for Overcurrent Protection at Any Voltage Level GE Multilin
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
Okosis Automation & Control Systems “The Automation Specialists !” Introductory Presentation
G GE Power Management DDS Integrated P&C System INTGRATED PROTECTION AND CONTROL SYSTEM DDS INTEGRATED PROTECTION INTEGRATED CONTROL.
EVD4 - The Smart eVolution Primary distribution circuit-breaker with integrated protection, control and sensors © ABB Group 15. April 2017 | Slide 1 1.
SYMAP-BC SYMAP-BC.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Substation Automation Systems
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
January 2015 SlimLine XR ITS 2.
Introduction to wind parks SCADA systems
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
MIG II DIGITAL FEEDER PROTECTION
Industrial Automation Automation Industrielle Industrielle Automation 1.5Control System Architecture Arquitectura de control Architecture de Contrôle -
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
DNP 3.0 solution for CitectSCADA
Substation Automation
AUT S.B.S. - Presentation name - Date - Language - Electronic File Name 1 SCHNEIDER ELECTRIC Solutions.
SCADA and Telemetry Presented By:.
Product choice offered by ABB Oy, Distribution Automation
Industrial Automation Automation Industrielle Industrielle Automation Control System Architecture 1.5Architecture de Contrôle - Commande Leittechnik-Architektur.
IRRInet & ICC System Concept
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
MicroSCADA Pro in demanding Industrial Applications
Frankfurt (Germany), 6-9 June 2011 Agenda 1. Background 2. System Design 3. Experience 4. Future work Henrik Stomberg– Sweden – Session No 4 – Paper No.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Preliminary Studies of the Electric Power Distribution for CLIC
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
MicroSCADA Pro Partners Club 04/2007 © ABB MicroSCADA Pro Partners Club SYS Scalability Marko Viitala.
Schutzvermerk nach DIN 34 beachten XC200 Hardware Overview.
Tacoma Power’s Compaq Server and Ethernet RTU Performance Testing Presented By Joe Orth 253/ EMS Group Meeting Presented.
Process Communication Unit PCU400
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Ordering Tool Guideline
Yokogawa Electric Corporation ISD-MASP-S05010 Copyright © Yokogawa Electric Corporation February 16, 2005 Solution Marketing Group Industrial Automation.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
© ABB MRS MicroSCADA Pro LEC-LEC co-operation Asan-Baebang Integrated SA/SCADA/DMS delivery Jung-Wook Koh-KRABB/SAS Anssi Salonen-FIABB/SAS.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
SmartMQn Motor Horner APG, LLC September 9, 2008.
NERC Lessons Learned Summary LLs Published in September 2015.
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
4/26/2017 MicroSCADA Pro SYS Mikael Molander FISUB/Österbacka.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Distribution Solution. Distribution Solution - Topics Substation Automation Conventional vs New Technology RED 500 protection relays REJ, REU Multipurpose.
OEZ s.r.o. Quick and universal solution for your order Modeion 05/2012.
Computing and Communications Services Office 1 CCSO Instructional Sites Randy Cetin Computing and Communications Services Office Assistant Director, Systems.
Nodal Planning Go Live Austin, TX February 3, 2011
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
CMV-NET Chigo VRF Network Centralized Control System
MicroSCADA Pro Substation Automation Retrofit of Substation SILS
MicroSCADA Pro SYS600 and DMS600 Ordering Tool
Peter Erning, PSP-T11, Power Gen 2010
Wojciech Szela, Edward Gdowik – PECO
Moxa Smart Grid Technology Portfolio
MicroSCADA Pro Product Training
R200 and ATS100 Presentation 01/12/2013.
ILO Industrial Opportunities Days, 6-7 June 2019
Backup Power supply for Electrical substations Overview 01/2012
Presentation transcript:

MicroSCADA Pro Ortviken upgrade & Crimea Wind Power Plant 4/23/2017 MicroSCADA Pro Ortviken upgrade & Crimea Wind Power Plant Stefan Johansson, Sweden FISUB/Österbacka

Upgrade and wind park projects Ortviken Paper Mill Upgrade of one of Sweden's largest MicroSCADA installations to the latest MicroSCADA Pro Crimea Wind Power Plant New Wind Power Plant on the Crimea peninsula

Ortviken Paper Mill

4/23/2017 Ortviken 1850-2005 FISUB/Österbacka

Facts and figures Facts and figures Ortviken News 375.000 ton/year Ortviken LWC (Light Weight Coated) 475.000 ton/year Number of employees 930 Electrical consumption 1,9 TWh

Orvikens Electrical installation 4/23/2017 Orvikens Electrical installation 2 x 130kV lines from EON, normal power 250MW Outdoor 130kV-substation with 7 st breakers 130kV GIS with 25 bays 12 x refiner 5-15 MW with direct start from GIS 1 x counter-pressure turbine with generator 15 MVA 30 x 6kV substations, 260 bays with Safesix total of 453 bays 60 x 6 kV motors 125 x low voltage/motor substations Stort antal LSP-fack Frekvensomriktar- och LS-drifter FISUB/Österbacka

Connected IED 250 protection units of type SPAM and SPAJ 4/23/2017 Connected IED 250 protection units of type SPAM and SPAJ 45 protections/control units of type REF 100 SACO units analog/digital 100 SPOC units 2 RTUs Fiber loops via RS232 converters SPAC 539 C ABB SACO 16 D1 SPOC 110 C ABB FISUB/Österbacka

The history of MicroSCADA 4/23/2017 The history of MicroSCADA First system was installed in 1992 The ”last” was installed in 2001 Total 15 SCS with different versions Terminal server functionality via external software (Exceed) NCC was using ATA functionality Communication and data exchange with the process control system via GCOM Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

The original system 4/23/2017 FISUB/Österbacka SPOC 110 C ABB SACO 16 D1 SPAC 539 C ST1 ST2 ST3 ST3-11/21 ST3-31 ST4 ST4‑11 ST4‑21/31 ST53-71 ST52 ST53 ST53-41/61 ST56 ST57/58 GIS ST53‑61 ST2-31/41 NCC/Control room SCS 100 Connection to office network Alarm announciator Event printer Hardcopy printer SCS 100 TERMINAL GPS ÅC LAN GCOM-SERVER 15” TCP/IP Advant Controller Delivery by ABB 21” DCNT FISUB/Österbacka

How to upgrade the system 4/23/2017 How to upgrade the system The system was to be upgraded in three phases Phase 1 Get a fresh backup of the system Upgrade all databases to lib 4* Build a new structure from 15 individual SCS to one NCC with 15 frontends New database build up from individual SCS New addressing of all individual databases to fit the new structure Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

4/23/2017 Upgrade from LIB3 to LIB4 No ready made tool to upgrade the LIB3 to LIB4 We developed special tool that did parts of the job (excel) Manual ”hands-on” for addresses etc. Upgraded all special functions by hand to LIB4 Simulated the upgraded database and all connected SPA units by using SPA-SIM Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

How to upgrade the system 4/23/2017 How to upgrade the system The system was to be upgraded in three phases Phase 1 Get a fresh backup of the system Upgrade all databases to lib 4* Build a new structure from 15 individual SCS to one NCC with 15 frontends New database build up from individual SCS New addressing of all individual databases to fit the new structure Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

Industrial PC with PCNET 4/23/2017 Phase 1 SPOC 110 C ABB SACO 16 D1 SPAC 539 C NCC/Control room SCS 100 Connection to office network Alarm announciator Event printer Hard-Copy printer SCS 100 TERMINAL GPS Delivery by ABB Advant Controller Delivery by ABB 21” LAN MicroSCADA PRO, Server A TCP/IP Industrial PC with PCNET Local workplace SPA ST1 ST2 ST3 ST3-11/21 ST3-31 ST4 ST4‑11 ST4‑21/31 ST53-71 ST52 ST53 ST53-41/61 ST56 ST57/58 GIS FAT i Västerås, kontroll av typfack, redundanta servrar Leverans till Ortviken, inkoppling av server och Frontend på nätverket Gamla systemet levde vidare Gamla bilderna i nya systemet FISUB/Österbacka

How to upgrade the system 4/23/2017 How to upgrade the system The system was to be upgraded in three phases Phase 2 Upgrade the system by system i.e. letting the old system run in parallel with the new one Move over SCS by SCS to the new structure Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

Industrial PC with PCNET 4/23/2017 NCC/Control room SCS 100 Connection to office network Alarm announciator Event printer Hard-Copy printer SCS 100 TERMINAL GPS Delivery by ABB Advant Controller 21” LAN MicroSCADA PRO, Server A TCP/IP SPOC 110 C ABB SACO 16 D1 SPAC 539 C Industrial PC with PCNET Local workplace SPA ST1 ST2 ST3 ST3-11/21 ST3-31 ST4 ST4‑11 ST4‑21/31 ST53-71 ST52 ST53 ST53-41/61 ST56 ST57/58 ST59/60 GIS Phase 2 Gamla bilderna i nya systemet Flyttade över undercentraler till nya Frontend Tomt gammal system, stog kvar som reserv i några veckor OPC server i drift Remote terminal i drift FISUB/Österbacka

How to upgrade the system 4/23/2017 How to upgrade the system The system was to be upgraded in three phases Phase 3 Install the Hot standby server Install and upgrade the new HMI to the new Pro Graphics Komplicerat samband mellan central system och stationsdatorer Olika versioner mot olika skydd Y2K uppgradering med hårdvarubyte FISUB/Österbacka

Industrial PC with PCNET 4/23/2017 Connection to office network Delivery by ABB SPOC 110 C ABB SACO 16 D1 SPAC 539 C Industrial PC with PCNET LAN Local workplace SPA NCC/Control room BILDSKRIVARE MicroSCADA PRO, Server A TCP/IP MicroSCADA PRO, Server B HSB MicroSCADA PRO, Workstation ST1 ST2 ST3 ST3-11/21 ST3-31 ST4 ST4‑11 ST4‑21/31 ST53-71 ST52 ST53 ST53-41/61 ST56 ST57/58 ST59/60 GIS Phase 3 Remote desktop timesync OPC-connection Etapp 3A Redundanta servar installerade Gamla systemet bortkopplat Etapp 3B Uppgradering till 9.2 Nya bilder Nya rapporter Redundant OPC server FISUB/Österbacka

Crimea Wind Power Plant

Facts and figures Customer Nova-Eco, Kiev Ukraine Consultant 4/23/2017 Facts and figures Customer Nova-Eco, Kiev Ukraine Consultant Krim-Irey. Ukrenergomerezhproject (Ukrainian power grid design, "Kharkov Institute”) Project Turn-Key delivery of two Wind Power Plant of 200MW and 100MW Partners Eltel for 330kV or 220 kV transmission lines and communication. Martifer / Suzlon for 150 x 2 MW Wind Mills. FISUB/Österbacka

Site location Western Project Area Eastern Project Area

West WPP WPP Substation

West WP Substation 330kV CVT 330kV SA 125 MVA 110/33kV 225 MVA 110kV DCB 330kV DCB 33kV Capacitors Control Room 33kV Capacitors 33kV Switchgear

East WPP WPP Substation

East WP Substation 125 MVA 220/33kV 220kV DCB Control Room 33kV Capacitors 33kV Switchgear

How to connect ? ?

General requirements of the control system The control system is adapted to fit the requirements of the power system and the turbine Each feeder contains up to 12 windmills There has to be a special startup sequence (soft start) during normal startup and trip situations Startup sequences has to be both manually and automatically Prepared for OPC connection with the WPP SCADA

Setting up the system

The RMU Each Windmill has it’s own RMU: The windmill Transformer 690V / 33kV Breaker RTU560D With I/O to connect to the units in the RMU Communication switch to the substation Communication to the substation via IEC-104 Internal power supply via the local voltage transformer The windmill Has it’s own control system powered from the 690V side When the Windmill is started up it will automatically connected to the power grid

Setting up the system IEC-104 IEC-101 to NCC

In the substation RTU 560 Communicates with all the bayhouses via IEC-104 Communicates to the NCC via a IEC-101 line Has a PLC program that can manually or automatically control each circuit breaker in each RMUs for soft in coupling of the windmill Exchange information with the local control in the WPP/SS and the IEDs on the 33kV side

Setting up the system 61850-8-1 IEC-104 IEC-101 to NCC

In the substation MicroSCADA Pro Local control of the substation Communicates with the 33kV bays and the transformer units 220/330 kV via IEC61850 Exchanges information with the RTU for local control Start/stop of all sequences of the 33 kV power grid Busbar coloring of 100 RMUs IED and disturbance tools

The system solution for WPP West IEC 60870-5-104 Ethernet TCP/IP WPP S/S Ethernet TCP/IP IEC 61850 GPS time- syncronisation MicroSCADA SubstationControl System Switch RMU no1 RMU no100 SCADA 2*IEC 60870-5-104 Master IEC 61850 Client IEC 60870-5-101 Slave Switch Switch SPA ZC402 IEC 61850 Servers IEC 60870-5-104 Slave IEC 60870-5-104 Slave RTU 560D RTU 560D 4pc RET670 RTU 560A PLC for manual/automatic control of circuit breakers in WPP/SS and RMUs 110DC PS 16pc DI 110VDC 2pc DO 110VDC 110DC PS 16pc DI 110VDC 2pc DO 110VDC 14pc REX 521 Fibre-cable TP-cable

The system solution for WPP East IEC 60870-5-104 Ethernet TCP/IP WPP S/S Ethernet TCP/IP IEC 61850 GPS time- syncronisation MicroSCADA SubstationControl System Switch RMU no1 RMU no50 SCADA 1*IEC 60870-5-104 Master IEC 61850 Client IEC 60870-5-101 Slave Switch Switch SPA ZC402 IEC 61850 Servers IEC 60870-5-104 Slave IEC 60870-5-104 Slave RTU 560D RTU 560D 2pc RET670 RTU 560A PLC for manual/automatic control of circuit breakers in WPP/SS and RMUs 110DC PS 16pc DI 110VDC 2pc DO 110VDC 110DC PS 16pc DI 110VDC 2pc DO 110VDC 7pc REX 521 Fibre-cable TP-cable