High Current Run I 2015 Feb 3 22:45 to Feb. 4 23:00 High Current Run II 2015 Feb 5 12:15 to Feb. 6 13:00 Current ~ 20 mA Approx. 40 trips, i.e. fast shutter.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

IOT Measurements & Amplifier Improvements at Diamond
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
Simulation of Created Design Documentation on the simulation process of a basic injector-separation channel model design.
ANNEX. WP 1.04, Michael Ebert2MAC PETRA-III Review Meeting, DESY,29th November 2006 Sandblasted Center Conductor of a Cavity Input Coupler R a =
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Simulate LINC system in ADS Song 03/30/2005.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
MDI meeting, March 19, 2004 Categorizing radiation aborts Livio Piemontese When something really bad happens to the beams, they are aborted. An optimized.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Debuncher “phase jump” project Decouple Debuncher RF frequency from MI 120 GeV frequency – MHz could move by ~1-2 kHz –Can center beam in Debuncher.
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
External Modulator. When data rates were in the low gigabit range and transmission distances were less than 100 km or so, most fiber optic transmitters.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
John Carwardine January 16, 2009 Some results and data from January studies.
Beam Loss Issues for High-Power, High-Brightness Electron Injectors Bruce Dunham Cornell University December 18, 2012.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Performance of the Cornell High- Brightness, High-Power Electron Injector Bruce Dunham and Adam Bartnik December 17, 2012 B. Dunham Cornell University.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
LEReC Instrumentation Gun Test Beam Line Summary Toby Miller
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Beam Commissioning Adam Bartnik.
Challenges of Dual Harmonic RF Systems
HOM-BPM study in STF for cavity miss-alignment detection
RF interlocks for higher intensities (LMC 15 June)
Quench Protection Younguk Sohn
Operational Experience - Field Emission
Controls CBETA controls will extend existing EPICS control system
Beam-Based Feedback in LCLS-II
G0 Backward Angle Accelerator Preparations
Damping Ring Kicker Tests at AØ
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LLRF and Beam-based Longitudinal Feedback Readiness
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
The Cornell High Brightness Injector
Cornell Injector Performance
Phase Monitor Electronics: Output vs
UITF MPS system requirements
Performance Degradation cERL Injector Cryomodule
RF Pulse Shaping.
LHC Morning Meeting - G. Arduini
Linac/BC1 Commissioning P
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Operational Experience with LCLS RF systems
UITF Conduct of Operations Review
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

High Current Run I 2015 Feb 3 22:45 to Feb. 4 23:00 High Current Run II 2015 Feb 5 12:15 to Feb. 6 13:00 Current ~ 20 mA Approx. 40 trips, i.e. fast shutter closes ~ 75 % appear to be Gun HVPS tripping off ~ 25 % other ERL Injector Trip Studies

These are the fast signals we monitored during the two 24 hours runs: Gun HVPS voltage reading Cavity phases (we were biased toward looking at the phases rather than amplitudes because the “RF Field OK” signal seemed to only fail on amplitude). The output of the discriminator connected to the coupler PMTs A beam amplitude signal from a bpm before the dump (four BPM signals to an RF combiner, output of combine to a mixer to produce a 12.5 MHz signal which went to the scope) These signals were added part way through the two 24 hour runs: An analog signal from a coupler PMT (I don’t think the analog coupler PMT signal told us more than the discriminator output) A fast (log) amplitude and phase signal from a BPM in A1

Typical “Gun” Trip

don’t know what started this, beam amplitude is steady, cavity 2 trips off later 0.1 V = 5 degrees

beam signal at dump is affected by RF ?, dump quad detector closes shutter, no RF trips off (similar to Feb. 4 10:39 Trip) 0.1 V = 5 degrees

cause ?, beam steady, after shutter closes arc and pressure trips on cavity V = 5 degrees

subsequently arc and pressure trips, all cavities trip 0.1 V = 5 degrees

cavity response driven by beam disturbance ?, a later trip shows same behavior with no beam disturbance A2 closes shutter, all RF trips off 0.1 V = 5 degrees

cavity response driven by beam disturbance, dump quad detector closes shutter, no RF trips off, A1 Beam Phase, Amplitude 0.1 V = 5 degrees

Glitch in A1 beam intensity, cavity 1 closes shutter ?, cavity 1 trips off later (similar to Feb. 4 11:30:48 Trip) 0.1 V = 5 degrees