International Data Link Symposium 2003 1st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.

Slides:



Advertisements
Similar presentations
ESA Iris Programme: status
Advertisements

ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
CRDS Budapest First ATM R&D Workshop - 27 and One Sky for Europe EUROCONTROL CONCLUSIONS A momentum has been created A small step towards.
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Data-link: Fact and Fiction Kim O’Neil Advanced Aviation Technology Ltd.
1 Presented by Mike Shorthose Helios Technology Ltd Chamberlain House High Street Bagshot Surrey UK VDL Mode 4 Overview and development status.
ROLE OF LOGISTICS IN SUPPLY CHAINS
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Applications from packages I to III
Sense & Avoid for UAV Systems
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Logistic Management of investment-construction project TRANSMARKET GROUP.
Stand August 2007 ADS-B Avionics for General Aviation Euro Telematik AG Riedweg 5, D Ulm Tel. +49 (0)731/
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
Prof. dr. sc. Ivan Markežić
IRISS = International Relations Inspiring Students and Staff General objectives: -to foster cultural diversity and intercultural dialogue - to enhance.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Public hearing on the 4 th Package 1 The future role of the European Railway Agency Tuesday, 07 May 2013 Steer Davies Gleave Upper Ground London,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
Guidelines for Impact and Adaptation Assessment Design versus Implementation Issues RICHARD J.T. KLEIN POTSDAM INSTITUTE FOR CLIMATE IMPACT RESEARCH (PIK)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
Noise Policy Options for Farnborough Airport – Presentation on work carried out by Hepworth Acoustics for Rushmoor Council Peter Hepworth Thursday 31 st.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
GCM, Annecy – France Activity Report Piotr Grygier Vice President Multifunctional forest management and society matters.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
1 European Organisation for the Safety of Air Navigation Jan Van Doorn Director EUROCONTROL Experimental Centre April 2006 ASAS / ADS-B: Implementation.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
Ensuring the Safety of Future Developments
© Services GmbH Proposal writing: Part B 2/1/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Multimedia Development Team. 2 To discuss phases of MM production team members Multimedia I.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme: status
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Ground System implication for ASAS implementation
THE FEASIBILTY STUDY LECTURE-5.
Workshop on preparations for ANConf/12 − ASBU methodology
The French National Agency on Water and Aquatic Environments
Workshop on preparations for ANConf/12 − ASBU methodology
Change Assurance Update
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Presentation transcript:

International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob Darby ADS Programme

OUTLINE Background Scope of Study Results Next steps

BACKGROUND

Problem  Civil - Military Interoperability in a future surveillance environment, increasingly dependent on ADS-B  Difficulty & cost of fitting military aircraft with ADS-B equipment using currently defined ADS-B data links (1090ES, VDL Mode 4, UAT)

History  Civil - Military Interoperability is a prime concern of the EUROCONTROL Military Business Division (MIL BD) as well as of the ADS Programme.  Many military aircraft already carry MIDS/Link16 equipment with capabilities similar to ADS-B  Consider the possibility of adapting or developing MIDS/Link16 for civil aviation.  Ideas were developed and discussed between MIL BD, Industry and the ADS Programme.  Study contract call for tender issued.  Study was won by the Spanish company ISDEFE.  Final Report was completed in August 2003.

SCOPE OF WORK

Scope of Study  To carry out a short Feasibility Study  to examine the possibilities that may exist for adapting or developing the existing military MIDS/Link 16 for use by civil aviation.  Such a system may support ADS-B, perhaps as part of a longer term (multi-link) capability to ensure civil- military interoperability. (Note that 1090 ES is the initial recommended ADS-B data link.)  MIDS/Link 16 should be considered for its possible advantages over and above the three existing ADS-B data links.  Any such link should also be capable of fulfilling all requirements for ADS-B Package 1 and beyond.

Main Issues  Technical Feasibility (Deliverable Report)  Economic Feasibility (Deliverable Report)  Development/ Testing/ Certification planning and time-scale aspects (Deliverable Report)  for installation on military & civil aircraft, including business aircraft and GA  consideration of special problems - e.g. power requirements, antenna installation  Institutional and security issues for release of design information (to allow a competitive market)  Overall assessment (Deliverable Report)

D2: Baseline Information & Assumptions (Deliverable Report)  Operational requirements from “ADS-B Package 1”  12 Ground Surveillance & Airborne Surveillance Applications  Consider Avionics & Ground Stations, including TIS-B  ADS-B system parameters, including capacity, to be as for TLAT (ADS-B Technical Link Assessment Team)  EUROCONTROL ADS-B Requirements & RTCA ADS-B MASPS.  Range & capacity requirement (to support ADS-B applications) are 150 NM and 1000 aircraft. (Core Europe scenario 2015)  MIDS/Link16 technology basis for surveillance only  Indicative planning to be compared with ADS-B Master Plan / Working Arrangements

RESULTS

D3: Technical Feasibility Report (Deliverable Report)  New set of messages required for ADS-B.  Software change only required for Military interoperability  Driving application for capacity is “Enhanced Visual Acquisition”, which offers potential safety benefits  Handling of the maximum traffic at required update rate with MIDS/L16 needs further investigation  Several options developed: varying by  number of frequencies used (1, 2, 7, 51)  fixed frequencies or frequency hopping  number of nets used  reporting rate (linked to use of contention mode & Rx update rate)  Best options are hopping, 7 or 51 frequencies, contention mode...  … which brings further advantages on interference and security  Options with minimal impact on military operations are possible

D4: Economic Feasibility Report (Deliverable Report)  Economic scenarios developed  Air Transport, Business and GA fleets, extrapolated to 2020  System Specification  On the basis of the Technical Feasibility Report, a System Specification was made - for manufacturer COTS estimates.  ViaSat has cooperated with the Study  non binding equipment proposal  indicative cost quotation  development & production time-scale (used for D5)  Comparison with 1090ES, VDL4, UAT costs  Competitive with Air Transport category costs  Probably not competitive with GA costs

D5: Development, Testing and Certification Planning Report (Deliverable Report)  Preliminary activities - leading to decisions } Considerable parallelism  Development planning  Testing planning  Certification planning  Production & delivery rates - from Viasat  Feasible to be ready for implementation before 2009  supported by independent European manufacturer review

D6: Final Report (Deliverable Report)  Brings together the four previous reports  Examines Institutional issues  Identifies open issues & substantial areas of further work  Overall conclusion (from a paper study) is encouraging, but there are significant Institutional issues to be solved before the new system would be able to be used as a data link to support ADS-B for civil aviation

NEXT STEPS

Next Steps  Dissemination  Final Report & associated material issued on a CD-ROM  Presentations & Discussions  : IDLS  : NATO Air Traffic Management Committee (NATMC) CNS Group  : EUROCONTROL Civil-Military Interface Standing Committee (CMIC)  : EUROCONTROL Communications Team  22/ : EUROCONTROL ADS Programme Steering Group  18/ : EUROCONTROL Surveillance Team  date TBD: one day workshop  Recommendations  EUROCONTROL Management: CSM Unit, EMBD …  NATO...

Conclusions  Paper Study only; open issues include experimental work and system modelling, as well as institutional discussions  Report material available today  Indications: worth taking further  Preparation for discussions and decisions is in hand  One-day workshop planned  Contact  Bob Darby  Costas Tamvaclis  or visit the ADS Programme website, to download the Final Report from the “ADS Latest News” section: 

Questions?